Sie sind auf Seite 1von 3

Bedok WRP/Design Calculations

VELOCITY CALCULATIONS
Project

T203 Construction of Woodlands Station and Cut and Cover Tunnel for
Thomson Line Project - Sewer Diversion

Description

Velocity Calculation

Max Capacity

1.420

m3/sec

Inlet Main Pipe


Velocity Calculations : D = Pipe Diameter

1.800 m

A = Area

2.545 m2

Q = Pumping capacity

1.420 m3/sec

Velocity V = Q/A

0.558 m/sec

Inlet Opening for Wet Well (2 open


Velocity Calculations : -

277855711.xls/For m3psFor m3ps

Page 1 of 3

Max Velocity(Discharg

2.5 m/s

Max Velocity(Gravity)

1.0 m/s

Max Velocity(Suction)

1.5 m/s

Bedok WRP/Design Calculations

VELOCITY CALCULATIONS
Building

: PANDAN PUMPING STATION

Description

General

Max Pumping Capacity

5.000

MGD

Velocity Calculations : D = Pipe Diameter

0.600 m

A = Area

0.283 m2

Q = Pumping capacity

0.263 m3/sec

Velocity V = Q/A

0.93 m/sec

277855711.xls/For MGDFor MGD

Page 2 of 3

263.08

l/s

Bedok WRP/Design Calculations

VELOCITY CALCULATIONS
Building

: PANDAN PUMPING STATION

Description

General

Each Pump Capacity

2.000

m3/sec

37.98

MGD

37.98

MGD

Number of Pumps

Velocity Calculations : D = Pipe Diameter

1.029 m

A = Area

0.832 m2

Q = Flow/ Pump
capacity
Velocity V = Q/A

2.40 m/sec

Number of Pumps

Flow for each


pump

1.00 m3/sec
18.99

277855711.xls/Pipe

m3/sec

2.000

1000 l/s

MGD

Page 3 of 3

Das könnte Ihnen auch gefallen