Sie sind auf Seite 1von 33

Q

2784
18

m3/hr
inch

V
Q

4.71

m/sec

Roof Velocity
42.47
Diameter
1416.63
Unit Volume
2344
New R/D Flow rate
1.65
Roof Velocity

m
m3
m3/h
m/h

Elevations
Roof Type
Tank Dia
Total HT
Overfill Level
R/D rate

CR
8
8
7.60
2000

m
m
m
m3/hr
m3/min
min

Volume Accumulated

33
5
167

Tank Unit Volume


Max. HH level

50
4.28

m3
m

i.e
Residence Time

Internal Floating Roof=IFR

m3

Cone Roof = CR
Floating Roof = FR

Line Hydraulics
4.71
2784
18

m/sec
m3/hr

D
V

3
1.50

inch
m/sec

inch

25

m3/hr

Volume
Dia
Height
High L
Low L
Pump out rate
Nominal Volume
Pumpable Volume
Residence time

62
20
18.8
1.5
2610
60382
52230
20.01

Type
CR
FR
IFR

m
m
m
m
m3/hr
m3
m3
Hours

Roof Drain Size


Dia
Rainfall
Velocity
No of Drains
Flow Rate
Flow Area
Dia
i.e

62
0.08
1.0
2
241.5
0.07
5.67
6

m
m/hr
m/sec
m3/hr
m2
Inch
Inch

Tanks
HT of Tank HH Level
18.90
18.30
20
16.70

V
Density

1.5
960.00

Vibration Limit

2160

anks
LL Level
1.30
2.20
2.30

m/sec
Kg/m3

Type Of Roof
Nozzles
Clean Out Door
ManHole Shell
ManHole Roof
ManHole IFR
Bleeder Vent
Roof Drain
Emergency Roof Drain
Rim Vent
Vent

Cone Roof
(Fixed)
Yes
Yes
Yes

Floating
Roof
Yes
Yes
Yes
Yes
Yes
Yes
Yes

Yes

Pad-Depad

Yes

Foam Nozzle
Safety Hatch
Weak Weld

Yes
Yes
Yes

Yes

Yes

Yes

Yes

Yes

S.E. Mixer

Yes

Yes

PVRV

Yes

Internal
Floating Roof
Yes
Yes
Yes
Yes
Yes

Yes
Yes

Yes
Yes

Insulation

Steam

Vapor Recovery

Yes

Dome
Yes
Yes

Remark
Required for all FR Tanks
Required for all FR Tanks

Yes

Depends upon Requirement (Required


when N2 or other Inert Gas is used as
Blanketing)

Yes
Yes

Yes

Depends upon Requirement (Required


when Temp. of Fluid to be maintained)
Depends upon Requirement (Required
when Temp. of Fluid to be maintained)
Depends upon Requirement (Required
when fluid is viscous or when the Fluid
is to be stored in Tank from where it is
transported to Customers)

Yes
Yes

Depends upon Requirement (Required


when N2 or other Inert Gas is used as
Blanketing). Its for Extra Protection

S.E. Mixer
1 Depends on the fluid handled
2 All products tanks must have S.E mixer
3 Viscious fluids generally have S.E mixers.

Clean Out Door


1 Should be provided in all type of tanks for maintainence purpose
ManHole Shell

ManHole Roof
ManHole IFR
Bleeder Vent
Roof Drain
1 Good practice to give a minimum of 2 roof drains.
Emergency Roof Drain
1 Should be provided in all floating roof tanks.
Rim Vent
1 Should be provided in all floating roof tanks & IFR also
Vent
Pad-Depad
Foam Nozzle
1 Compulasary for class A and B products.
Safety Hatch
Weak Weld
1 Optional one. Can be provided in cone roof tanks
Insulation
Steam
PVRV
Vapor Recovery
1 Shall be used only when the vapour pressure of the fluid handled is high. One lin

d handled is high. One line from roof is taken and connected back to the shell.

API-650 Pg 155

API-650 Page 37

Roof Drain Calculation


Dia of Tank
Rainfall rate
Lowest position of deck
Elevation of roof drain shell nozzle
Height of roof drain nozzle
Assumed Roof drain size
i.e
No. of drains assumed
Rain Area
Drain-off rate
Head Available (Ha)
Total length of Pipe
Velocity
Kinematic viscosity of water @ 5 C
Renold's number
Darcy friction factor
Darcy friction factor
Friction loss (Hr)
Friction loss
Therefore
Actual Velocity
Max. Discharge
Flow rate thro the assumed pipe size
Total flow rate
Hence

62.00
80.00
1.20
0.35
0.30
8.00
203.20
2.0
3019.07
0.03
0.55
71.60
1.03
0.00
138284.20
0.0054+(0.397*(Nre^-0.3))
0.02
0.32
0.03
Safe
1.35
157.67
0.05
52.22
104.45
Accepted

m
mm/hr
m
m
m
inch
mm
m2
m3/sec
m
m
m/sec
m2/sec

54+(0.397*(Nre^-0.3))
m
Kg/cm2
m/sec
m3/hr
m/hr
mm/hr
mm/hr

1.2 m
0.3
0.35 m
ROOF DRAIN SHELL NOZZLE

From Perry Page 456

From Perry Page 139

API 2350 Pg 23

API 2350 Pg 24

API 2350 Pg 23,24