ENERGY REVIEW
DEPT./AREA: _______
ENERGY REVIEW
SR.NO.
AREA
Prepared by
MACHINE
OR ZONE
ENERGY USAGE
SAVING
POTENTIAL
Approved By
TECHNOLOGICAL
FEASIBILITY
POSSIBILITY
FOR USAGE
OF
RENEWABLE
ENERGY
POTENTIAL
FOR WASTE
HEAT
RECOVERY
APPLICABLE
LEGAL
REQUIREMENT
Issued by
SIGNIFICANCE
NUMBER
STATUS OF
SIGNIFICANCE
YES
NO
CURRENT
CONTROLS
CONTROLS REQUIRED
REMARKS
Format No.:
Last review date:
Rev. No.:
Page 2 of 19
ENERGY REVIEW
DEPT./AREA: _______
ENERGY REVIEW
SR.NO.
AREA
Prepared by
MACHINE
OR ZONE
ENERGY USAGE
SAVING
POTENTIAL
Approved By
TECHNOLOGICAL
FEASIBILITY
POSSIBILITY
FOR USAGE
OF
RENEWABLE
ENERGY
POTENTIAL
FOR WASTE
HEAT
RECOVERY
APPLICABLE
LEGAL
REQUIREMENT
Issued by
SIGNIFICANCE
NUMBER
STATUS OF
SIGNIFICANCE
YES
NO
CURRENT
CONTROLS
CONTROLS REQUIRED
REMARKS
ENERGY REVIEW
SR.N
O.
AREA
MACHINE OR ZONE
ENERGY USAGE
SAVING
POTENTIAL
TECHNOLOGICAL
FEASIBILITY
STATUS OF
POSSIBILITY
SIGNIFICANCE
POTENTIAL APPLICABLE
FOR USAGE
SIGNIFIC
FOR WASTE
LEGAL
OF
ANCE
HEAT
REQUIREME
RENEWABLE
NUMBER
RECOVERY
NT
YES
NO
ENERGY
CURRENT
CONTROLS
Nursary
10
NA
17
Yes
Manual Operation
through DOL
Starter.
Nursary
NA
NO
Manual Operation
through DOL
Starter.
Hopper No -2
NA
NO
Manual Operation
through DOL
Starter.
Hopper No -2
NO
Manual Operation
through DOL
Starter.
NO
Manual Operation
through DOL
Starter.
NO
Manual Operation
through DOL
Starter.
NO
Manual Operation
through DOL
Starter.
NO
Operation through
DC Compound
motor & Thyristor
drive Panel.
NO
Operation Through
DOL Starter &
control by PLC
system.
Mines Office
Water pump - 22 KW
Crusher Hopper
Water Pump - 15 KW
Crusher Hopper
Water Pump - 15 KW
Appron Feeder
90 KW
Spillage Conveyor
3.7 KW
Approved By
NA
NA
NA
NA
Prepared by
NA
Issued by
NA
Issue date:
ENERGY REVIEW
SR.N
O.
10
AREA
Impactor Crusher
MACHINE OR ZONE
1100 KW
ENERGY USAGE
SAVING
POTENTIAL
20
10
11
12
Laminated Conveyor
Hammer Crusher
90 KW
600 KW
45 KW
10
18.5 KW
NA
15
55 KW
NA
16
9.5 KW
NA
17
45 KW
NA
18
110 KW
NA
19
160 KW
20
110 KW
Approved By
10
NA
NA
Issued by
Operation Through
vaccume Ckt.
Breaker(HT) &
control by PLC
system.
Operation through
DC Compound
motor & Thyristor
drive Panel.
NO
13
YES
Operation through
DOL Starter &
controlled by PLC
system.
NO
NO
NO
NO
NO
13
YES
NO
NA
14
Prepared by
CURRENT
CONTROLS
Operation Through
vaccume Ckt.
Breaker(HT) &
control by PLC
system.
NA
NO
NA
Yes
NA
7
13
TECHNOLOGICAL
FEASIBILITY
STATUS OF
POSSIBILITY
SIGNIFICANCE
POTENTIAL APPLICABLE
FOR USAGE
SIGNIFIC
FOR WASTE
LEGAL
OF
ANCE
HEAT
REQUIREME
RENEWABLE
NUMBER
RECOVERY
NT
YES
NO
ENERGY
Operation through
DOL Starter &
controlled by PLC
system.
Operation through
DOL Starter &
controlled by PLC
Operation through
system.
DOL Starter &
controlled by PLC
Operation through
system.
DOL Starter &
controlled by PLC
Operation through
system.
DOL Starter &
controlled by PLC
system.
Operation through
DOL Starter &
controlled by PLC
system.
Operation through
DOL Starter &
controlled by PLC
system.
Issue date:
ENERGY REVIEW
SR.N
O.
21
AREA
MACHINE OR ZONE
ENERGY USAGE
88.5 KW
22
75 KW
23
160 KW
SAVING
POTENTIAL
NA
NA
3
24
75 KW
TECHNOLOGICAL
FEASIBILITY
STATUS OF
POSSIBILITY
SIGNIFICANCE
POTENTIAL APPLICABLE
FOR USAGE
SIGNIFIC
FOR WASTE
LEGAL
OF
ANCE
HEAT
REQUIREME
RENEWABLE
NUMBER
RECOVERY
NT
YES
NO
ENERGY
5.5 KW
NA
26
5.5 KW
NA
27
5.5 KW
NA
30
55 KW
37 KW
NA
NA
31
Hammer Crusher- Hydraulic Pump
15 kw
NO
NO
NO
NO
NO
NO
NO
NO
NO
NA
25
29
NO
NA
NA
CURRENT
CONTROLS
Operation through
DOL Starter &
controlled by PLC
system.
Operation through
DOL Starter &
controlled by PLC
system.
Operation through
DOL Starter &
controlled by PLC
system.
Manual Operation
through control
panel.
Manual Operation
through control
panel.
Manual Operation
through control
panel.
Manual Operation
through control
panel.
Operation through
DOL Starter &
controlled by PLC
system.
Operation through
DOL Starter &
controlled by PLC
system.
Manual Operation
through control
panel.
Prepared by
Approved By
Issued by
Issue date:
ENERGY REVIEW
STATUS OF
POSSIBILITY
SIGNIFICANCE
POTENTIAL APPLICABLE
FOR USAGE
SIGNIFIC
FOR WASTE
LEGAL
OF
ANCE
HEAT
REQUIREME
RENEWABLE
NUMBER
RECOVERY
NT
YES
NO
ENERGY
SR.N
O.
AREA
MACHINE OR ZONE
ENERGY USAGE
SAVING
POTENTIAL
TECHNOLOGICAL
FEASIBILITY
Drilling
Drill Machines
Consumption of HSD
10
NA
17
Yes
Monitoring &
Controlling of
Operation & Maint.
Practices
Loading of Limestone
Shovels
Consumption of HSD
NA
17
Yes
Monitoring &
Controlling of
Operation & Maint.
Practices
Transporting of Limestone
Dumpers
Consumption of HSD
10
NA
17
Yes
Monitoring &
Controlling of
Operation & Maint.
Practices
Supporting Equipments
Dozer,LMV's
Consumption of HSD
10
NA
13
Yes
Monitoring &
Controlling of
Operation & Maint.
Practices
Prepared by
Approved By
Issued by
CURRENT
CONTROLS
Issue date:
ENERGY REVIEW
SR.N
O.
AREA
Prepared by
Approved By
MACHINE OR ZONE
ENERGY USAGE
SAVING
POTENTIAL
TECHNOLOGICAL
FEASIBILITY
Issued by
STATUS OF
POSSIBILITY
SIGNIFICANCE
POTENTIAL APPLICABLE
FOR USAGE
SIGNIFIC
FOR WASTE
LEGAL
OF
ANCE
HEAT
REQUIREME
RENEWABLE
NUMBER
RECOVERY
NT
YES
NO
ENERGY
CURRENT
CONTROLS
Issue date:
ENERGY REVIEW
SR.N
O.
AREA
Prepared by
Approved By
MACHINE OR ZONE
ENERGY USAGE
SAVING
POTENTIAL
TECHNOLOGICAL
FEASIBILITY
Issued by
STATUS OF
POSSIBILITY
SIGNIFICANCE
POTENTIAL APPLICABLE
FOR USAGE
SIGNIFIC
FOR WASTE
LEGAL
OF
ANCE
HEAT
REQUIREME
RENEWABLE
NUMBER
RECOVERY
NT
YES
NO
ENERGY
CURRENT
CONTROLS
Issue date:
ENERGY REVIEW
SR.N
O.
AREA
Prepared by
Approved By
MACHINE OR ZONE
ENERGY USAGE
SAVING
POTENTIAL
TECHNOLOGICAL
FEASIBILITY
Issued by
STATUS OF
POSSIBILITY
SIGNIFICANCE
POTENTIAL APPLICABLE
FOR USAGE
SIGNIFIC
FOR WASTE
LEGAL
OF
ANCE
HEAT
REQUIREME
RENEWABLE
NUMBER
RECOVERY
NT
YES
NO
ENERGY
CURRENT
CONTROLS
Issue date:
10
CONTROLS REQUIRED
REMARKS
Replacement of 55 kw Motor
IMP 01(Completed)
with 18.5 KW Motor
Efficient operation
Efficient operation
Efficient operation
Efficient operation
Efficient operation
Efficient operation
Prepared by
Approved By
Issued by
Issue date:
11
CONTROLS REQUIRED
REMARKS
OCP
Prepared by
Approved By
Issued by
Issue date:
12
CONTROLS REQUIRED
REMARKS
Prepared by
Approved By
Issued by
Issue date:
13
CONTROLS REQUIRED
REMARKS
OCP
IMP
OCP
OCP
Prepared by
Approved By
Issued by
Issue date:
14
CONTROLS REQUIRED
Prepared by
Approved By
REMARKS
Issued by
Issue date:
15
CONTROLS REQUIRED
Prepared by
Approved By
REMARKS
Issued by
Issue date:
16
CONTROLS REQUIRED
Prepared by
Approved By
REMARKS
Issued by
Issue date:
17
TECHNOLOGICAL/ IMPLEMENTATION
FEASIBILITY RATING (B)
10
Major
interventions/changes are
required (CAPEX)
10
1 Kcal = 4.187kj
Note
Give 1 mark bonus if the potential for waste heat recovery is there
Give 2 marks bonus if the selected option is renewable
options will not be significant in any case when, either A Or B is zero
Prepared by
Approved By
Issued by
Issue date:
36.5
438000
50
5475
273750
20000
100000