II.
Location:
Testech Group
Calamba Premiere Industrial Park
Brgy. Batino Calamba City, Laguna
III.
Duration:
June - December 2015
IV.
V.
Department Involved:
BatStateU-Lipa Industrial Engineering Department
Testech Incorporated Quality Assurance Department
VI.
VII.
Cooperating Agencies:
Batangas State University (Lipa Campus)
Testech Group
VIII.
Beneficiaries:
Testech Group is an inspection house that offers other manufacturers services on
inspecting substrates mainly on semiconductors and electronics. These include
complete EMS solutions, complete assembly (sub-assembly, PCB assembly, FPC
assembly and other assembly processes), Tape and Reel, STD/N2 Bake and Dry
Pack, Laser Marking and Demarking.
IX.
X.
XI.
1.
Objectives:
To determine the current inspection process of the company
2.
3.
4.
To know the root cause of the high-escapee rate of the top defects
5.
To develop solution for the high-escapee rate of the top rejects with the use of
process level PDCA
XII.
XIII.
Financial Plans:
Testech Incorporated will finance the project in any case of cost accumulation
during improvement cycle.
XIV.
Prepared by:
________________________
Engr. Annalee A. De Silva
Adviser, IE Department
________________________
Mr. Francis G. Balazon
Head, Extension Coordinator
Noted by:
_________________________
_________________________
Engr. Leoven A. Austria
Michael C. Godoy
Head, CE
Dean
Engr.
Associate
_________________________
Dr. Nora G. Dimaano
Dean of Colleges
Recommending Approval:
_________________________
Dr. Expedito V. Acorda
Executive Director
__________________________
Engr. Romeo C. De Castro
Director, Extension Services
_____________________________
Dr. Erma B. Quinay
VP, Research Development and Extension
Approved by:
______________________________
Dr. Tirso A. Ronquillo
University President