SIMULTANEOUS WATER AND NATURAL

GAS DISPOSAL (SWAN) PROJECT


VARIATION ORDER TO EOC WATER
REINJECTION PROJECT.

PROCUREMENT PROCEDURE

EX-DE

02

20 April
15

Approved
For
Constructi

ENGR
C.A

TEAM

C.O

T.S

on
Validati
on

Rev.

Date

Descriptio

Prepared

Checked

by

by

Status

Company logo and business name

Project name

Approve

Contracto

by

Approval

Company
Approval

Company identification

REPLACEMENT OF 6
SCH120 FLOWLINES
FOR EBOCHA PROJECT

3201.11.DBPF.10010
Contract

Contractor logo and business name

No.

4600016138/39/40

Vendor logo and business name


Facility Name

Location

Scale

Sheet of Sheets

LAND

n.a.

1 / 25

EBOCHA OIL CENTRE


Document Title
PROCUREMENT PROCEDURE

Supersedes N.
Superseded by N.
Plant
Plant Unit
Area

Projects Development, Engineering Division


This document is CONFIDENTIAL and the sole property of the Company. It shall neither be shown to third parties nor used for other purposes
than those for which it has been issued/sent. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Company Identification

3201.11.DBPF.1001

Rev. index.

Contractor Identification

4600016138/39/40

Validity

Sheet of

Rev. No.

Sheets

Status

EX-DE

02

2 / 25

Projects Development, Engineering Division

REVISION RECORD

02

23 Oct 14

Approved for Construction

01
00
Rev.

29 Sep 14
02 Sep 14
Date

Issued for Approval


Issued for Review
Reason for Revision

File Name :

Comment Incorporated
First Issue
Short Description of Changes

278075414.doc

This document is property of NAOC Ltd. Who lawfully reserves all rights. Any unauthorised attempt to reproduce it, in any form, is strictly
prohibited. NAOC will safeguard its rights according to the civil and penal provisions of the law

Company Identification

3201.11.DBPF.1001

Contractor Identification

4600016138/39/40

Rev. index.
Validity

Sheet of

Rev. No.

Sheets

Status
EX-DE

02

3 / 25

Projects Development, Engineering Division

TABLE OF CONTENTS
1.0

GENERAL.........................................................................................

1.1

SCOPE..............................................................................................

1.2

ABBREVIATIONS............................Error! Bookmark not defined.

1.3

REFERENCE.....................................................................................

2.0

EVALUATION AND CONTROL............................................................

3.0

PURCHASING PROCESS...................................................................

4.0

EXPEDITING PROCESS...................................................................

5.0

PURCHASE PLANNING....................................................................

6.0

USE AND MANAGEMENT OF SUPPLIERS.........................................

7.0

ISSUANCE AND DISTRIBUTION.......................................................

8.0

ISSUANCE AND DISTRIBUTION OF ORDERS...................................

9.0

Material Control.............................................................................

9.1

Tracking of Materials.....................................................................

10.0 Materials Receiving (Local Purchased)..........................................


11.0 Forms.............................................................................................

File Name :

278075414.doc

This document is property of NAOC Ltd. Who lawfully reserves all rights. Any unauthorised attempt to reproduce it, in any form, is strictly
prohibited. NAOC will safeguard its rights according to the civil and penal provisions of the law

Company Identification

3201.11.DBPF.1001

Rev. index.

Contractor Identification

4600016138/39/40

Validity

Sheet of

Rev. No.

Sheets

Status
EX-DE

02

4 / 25

Projects Development, Engineering Division

1.0

ABBREVIATIONS
COMPANY
NAOC
CONTRACTOR

NAOC
Nigeria Agip Oil Company
B+G&S Nigeria Limted

MRR

Material Receiving Report

MRF

Material Request Form

PO

Purchase Order

RFQ

Request for Quotation

RFP

Request for Procurement

MDS

Material Data Sheet

BEF

Bid Evaluation Form

FEED

Front End Engineering Design

LPO

Local Purchase Order

RGIR

Receipt of Goods Inspection Report

PM

Project Manager

PD

Project Director

File Name :

278075414.doc

This document is property of NAOC Ltd. Who lawfully reserves all rights. Any unauthorised attempt to reproduce it, in any form, is strictly
prohibited. NAOC will safeguard its rights according to the civil and penal provisions of the law

Company Identification

3201.11.DBPF.1001

Contractor Identification

4600016138/39/40

Rev. index.
Validity

Sheet of

Rev. No.

Sheets

Status

EX-DE

02

5 / 25

Projects Development, Engineering Division

2.0

INTRODUCTION
The Nigerian Agip Oil Company intends to install an ejector for the
simultaneous disposal of produced water and low pressure gas which would
otherwise be flared. The source of the low pressure gas shall be from the
gas outlet line of the LP-3 separator currently installed in Ebocha Oil Center.
The produced water to be utilized for this project shall be sourced from the
produced water reinjection package.
EPC Contractor shall ensure throughout detailed engineering that all
hazards have been identified, risks assessed and that appropriate measures
to protect personnel, facilities and the environment have been incorporated
in the design, by means of activities such as HAZID, HAZOP, and
Constructability Review etc.
Contractor shall perform all activities including all Project management,
detailed design engineering, procurement and supply of materials including
line pipes, fabrication, supply, transport, construction activities, installation,
restoration, testing and pre-commissioning activities required to achieve the
successful completion of the Work.

2.1

SCOPE OF WORK
Contractor scope of work for EPC of Simultaneous Water And Natural Gas
Disposal (SWAN)
Project shall include but not limited to procurement and supply of materials
including

valves,

fabrication,

inspection

and

testing,

transportation,

construction and installation activities required to achieve the successful


completion of the project. In procuring these items: Piping Fittings, Bolts and
Nuts, Pipe Supports, Fittings, Valves Gasket.
COMPANY shall prepare the Project procurement Plan Procedures, which
outline guidelines for Procedures and Schedules to be implemented by all
Contractor / sub-contractor and applicable Suppliers for carrying out all
File Name :

278075414.doc

This document is property of NAOC Ltd. Who lawfully reserves all rights. Any unauthorised attempt to reproduce it, in any form, is strictly
prohibited. NAOC will safeguard its rights according to the civil and penal provisions of the law

Company Identification

Rev. index.

Contractor Identification

4600016138/39/40

3201.11.DBPF.1001

Validity

Sheet of
Sheets

Rev. No.

Status

EX-DE

6 / 25

02

Projects Development, Engineering Division

procurement as contained in the Procurement Packages Dossier (All


Packages) and related services; however Contractor Sub-Contractor shall
purchase within their procedural requirements through their nominated
Vendors/suppliers. The Procurement Plan Procedure shall be prepared by
CONTRACTOR Project Engineer and the Procurement Officer. It shall be
reviewed by the Project Manager (PM) and approved by the Project
Director (PD).
COMPANY / CONTRACTOR shall ensure the following standards and
specifications are met:

3201.11.DLST.14127- Technical Specification for Valves.

3201.11.DLST.14129

Technical

Specification

for

Flanges,

Anchor Flanges and


Gaskets and Bolting.

File Name :

278075414.doc

This document is property of NAOC Ltd. Who lawfully reserves all rights. Any unauthorised attempt to reproduce it, in any form, is strictly
prohibited. NAOC will safeguard its rights according to the civil and penal provisions of the law

Company Identification

3201.11.DBPF.1001

Rev. index.

Contractor Identification

4600016138/39/40

Validity

Sheet of

Rev. No.

Sheets

Status

EX-DE

02

7 / 25

Projects Development, Engineering Division

3.0

REFERENCE

3201.11.DGSP.10053 - QAQC Plan.

3201.10.BGRV.10701- Scope of Work.

3201.11.DLST.14127- Technical Specification for Valves.


3201.11.DLST.14129 - Technical Specification for Flanges, Anchor
Flanges and
Gaskets and Bolting

File Name :

278075414.doc

This document is property of NAOC Ltd. Who lawfully reserves all rights. Any unauthorised attempt to reproduce it, in any form, is strictly
prohibited. NAOC will safeguard its rights according to the civil and penal provisions of the law

Company Identification

3201.11.DBPF.1001

Rev. index.

Contractor Identification

4600016138/39/40

Validity

Sheet of

Rev. No.

Sheets

Status

EX-DE

02

8 / 25

Projects Development, Engineering Division

4.0

EVALUATION AND CONTROL


The assessment and qualification of Vendors & suppliers shall be carried
out in accordance

with the Contract and the CONTRACTOR procedure

for managing vendors and suppliers in

the case of project materials for

permanent structure, CONTRACTOR shall solicit bids from

Companys

approved Suppliers list in the approved Vendor List. The Contractor shall
ensure that Vendor and suppliers shall adopt and implement all inspection
and Test plans in accordance with companys standard in all their activities
on the project. No deviation from the vendor/Supplier list shall be accepted
without prior approval from Company, if the Vendor/Supplier has been
assessed against the appropriate Quality System standards and approved
by a third Party accredited national body, the Vendors/Supplier shall be
requested to return a copy of their current approval certificate and Quality
Manual.

If the vendor/Supplier does not have an approved certificate for their


Quality System but does have a Quality Manual, the Vendor/Supplier shall
be requested to return a current copy of the Quality Manual, (unless
CONTRACTOR Party is already in possession of the current issue) together
with a list of any government, national or major industrial bodies that have
formally approved Quality System in a recognized Quality Standard and
any certificate showing QC / product approvals, such as ASME, etc.
In addition, CONTRACTOR shall have firm control over its Vendors and
suppliers and shall cause them to adopt and implement all Inspection Test
Plans relevant to the vendors/Suppliers specific activities on the project.
5.0

PURCHASING PROCESS

5.1 Purchased Goods / Material quality Requirements


File Name :

278075414.doc

This document is property of NAOC Ltd. Who lawfully reserves all rights. Any unauthorised attempt to reproduce it, in any form, is strictly
prohibited. NAOC will safeguard its rights according to the civil and penal provisions of the law

Company Identification

Rev. index.

Contractor Identification

4600016138/39/40

3201.11.DBPF.1001

Validity

Sheet of

Rev. No.

Sheets

Status

EX-DE

9 / 25

02

Projects Development, Engineering Division

CONTRACTORs purchasing process is tailored to ensure that goods and


materials

purchased

for

project

use

are

in

accordance

with

the

requirements of the contract. At each stage of the purchasing process and


depending on the overall effect of the decisions on the final product,
Company representative will be invited to agree with the decisions to
complete the stage and move to the next.
5.2 Purchasing Process Description
A comprehensive series of corporate Procurement Management Procedures
and Work Practices exist to satisfy the project execution methodology whilst
providing a sound management basis at all times.
The Procedures and Work Practices are formalised in manuals for each main
discipline group and provide a clear and positive indication of the controls
employed

in

the

normal

day-to-day

execution

of

the

procurement

management activities. Documentation is of a formalised nature and uses


standardised formats (e.g. Proposal Requests, Proposal Status Reports,
Proposal Summaries, Purchase Orders, Order Variations and Amendments,
Cost Allocation, Expediting Requests and Reports, Inspection Requests and
Reports, overall material status reporting, document transmittals, etc.).
These Procedures and Practices forms the basis of the project specific
documents and forms that will be produced to identify and incorporate the
unique requirements of Company Project specific. General Purchase
Conditions and Instructions to Bidders are prepared by the project team
members in consultation with Department Heads, which also incorporate
the

Company

requirements

regarding

documentation,

inspection,

commissioning assistance, warranty and spares. These are included in the


RFP, which is sent to the vendors for submitting a quotation.
Technical questionnaires are sent to the vendors by the Procurement
File Name :

278075414.doc

This document is property of NAOC Ltd. Who lawfully reserves all rights. Any unauthorised attempt to reproduce it, in any form, is strictly
prohibited. NAOC will safeguard its rights according to the civil and penal provisions of the law

Company Identification

3201.11.DBPF.1001

Contractor Identification

4600016138/39/40

Rev. index.
Validity

Sheet of

Rev. No.

Sheets

Status
EX-DE

02

10 / 25

Projects Development, Engineering Division

department and a Technical Bid Analysis is prepared, based on these,


purchase orders are placed by procurement manager. Preference is given
to vendors with proven track record or in the vendors list issued by
Company Quality Control. Engineers from CONTRACTOR and Vendors also
firm up the detailed quality control plan (witness, hold and review stages).
Items procured from within Nigeria are inspected by CONTRACTORS QA
department. However, for majority of other imported items, external
inspection agencies are appointed to work with CONTRACTOR Internal
Quality Management team to ensure that all purchase specifications are
complied with. Only approved & certified TPI will be appointed for third
party inspection.
The import department of CONTRACTOR handles all commercial matters
related to the imports such as opening of letters of credit, payment to
suppliers, etc. The procurement Officer keeps in touch with the import
department to coordinate these activities. The procurement officer has a
single point responsibility for all the items purchased. He closely monitors
all the activities related to the procurement via floating enquiries, locating
the right vendor, technical evaluation, commercial negotiations, purchase
specification approval, drawing approval, expediting, inspection calls to
external inspection agencies and Companys inspectors, sea freight,
customs clearance and local transport; and closely liaises with all other
departments and consultants to remove any possible bottlenecks in the
timely delivery of goods.
6.0 EXPEDITING PROCESS
All RFPs
bids

are

issued

by the Procurement department

where technical

from vendors/suppliers are also received and analysed/ evaluated.

The technical discussions with the vendors are held with the Procurement
Officer and or Manager, and the commercial part of all procurement is
File Name :

278075414.doc

This document is property of NAOC Ltd. Who lawfully reserves all rights. Any unauthorised attempt to reproduce it, in any form, is strictly
prohibited. NAOC will safeguard its rights according to the civil and penal provisions of the law

Company Identification

3201.11.DBPF.1001

Rev. index.

Contractor Identification

4600016138/39/40

Validity

Sheet of

Rev. No.

Sheets

Status

EX-DE

11 / 25

02

Projects Development, Engineering Division

handled

by

the

procurement

team.

Priorities

will

be

given

to

Vendors/Suppliers who have agents in Nigeria. The scope of procurement


covers all permanent materials and equipment required by the project,
excluding Company furnished materials.
The scope of procurement and deliveries are maintained by employing
methods used by international Contractors for such jobs, such as:
Preparation for start of engineering prior to award, to

avoid delay after contract award;

Making commitments for critical materials

Using materials from stock yards at higher cost,


if necessary;

Air-freighting items when necessary,

Working round-the-clock, including weekends


and holidays.
Monitor / expedite deliveries by vendors and

deputing expeditors at each of such work centers.


This approach calls for operating flexibility and de-centralized decision making,
which CONTRACTOR shall adopt for the project. Familiarity with international
procurement procedures is essential. Refer to flow chart below for a

typical

expedited purchasing processes developed by CONTRACTOR.

File Name :

278075414.doc

This document is property of NAOC Ltd. Who lawfully reserves all rights. Any unauthorised attempt to reproduce it, in any form, is strictly
prohibited. NAOC will safeguard its rights according to the civil and penal provisions of the law

Company Identification

3201.11.DBPF.1001

Contractor Identification

4600016138/39/40

Rev. index.
Validity

Sheet of

Rev. No.

Sheets

Status

EX-DE

02

12 / 25

Projects Development, Engineering Division

Purchase
Goods/Servi
ces

Identity
Requiremen
t

PM/CM raise
purchase
order

Purchasing
Manager Logs
Request

Purchasing Manager Reveiws


Requirement to know the level of
local and foreign procurement

File Name :

278075414.doc

Only Local
Purchases

This document is property of NAOC Ltd. Who lawfully reserves all rights. Any unauthorised attempt to reproduce it, in any form, is strictly

Required

prohibited. NAOC will safeguard its rights according to the civil and penal provisions of the law

Company Identification

3201.11.DBPF.1001

Rev. index.

Contractor Identification

4600016138/39/40

Validity

Sheet of

Rev. No.

Sheets

Status

EX-DE

13 / 25

02

Projects Development, Engineering Division

Yes
Check

for

No

Suitable

Forward

instructions

to

Approved Suppliers in

Corporate office in PHC to

Company Listing

arrange Purchase

No
Source

Purchasing carried out per


corporate office QA procedure
for purchasing

suitable
suppliers

Formally
review and
approve new

Yes
Select suppliers
from which to
obtain prices

Analyze Bids
(Prepare Analysis

Arrange

Shipment

Where Applicable

of Options)

Negotiate with Suppliers


and Settle any Bid

Transport From Port To

Anormalies

Required Delivery
Point

Final Selection of
Supplier

Prepare PO and get PO


Approved

No
P.O.
Approved?

Yes
File Name :

278075414.doc
Place Purchase

Orderof NAOC Ltd. Who lawfully reserves all rights. Any unauthorised attempt to reproduce it, in any form, is strictly
This document is property
prohibited. NAOC will safeguard its rights according to the civil and penal provisions of the law

Company Identification

3201.11.DBPF.1001

Rev. index.

Contractor Identification

4600016138/39/40

Validity

Sheet of

Rev. No.

Sheets

Status

EX-DE

02

14 / 25

Projects Development, Engineering Division

Monitor
Manufacturing /
Supplier Process

Ensure Any required


Inspection Test Plan is
Carried out

Transport from Supplier


to Required Delivery
Point
Check Purchased Item on Delivery at Required
Delivery Point, Clients Inspection as Required

No

Item
satisfact
ory?

Yes

Yes

No

Purchase
by

site

office
Advice

supplier

of

Advice PHC office with regards to

problem

problem

Purchasing

manager

will

up

follow

PHC office to follow up matter with


supplier and resolve

with

supplier and resolve


problems

No
Problem
Resolve

No
No

d?
File Name :

278075414.doc

This document is property of NAOC Ltd. Who lawfully reserves all rights. Any unauthorised attempt to reproduce it, in any form, is strictly
prohibited. NAOC will safeguard its rights according to the civil and penal provisions of the law

Company Identification

3201.11.DBPF.1001

Rev. index.

Contractor Identification

4600016138/39/40

Validity

Sheet of
Sheets

Rev. No.

Status

EX-DE

15 / 25

02

Projects Development, Engineering Division

yes

Item satisfactory inspection by

yes

Client if Required

yes
Purchased

by

Office?
Outstanding payments are

Formally advise PHC office

made to supplier and PO

that

closed

completed satisfactorily

in

Purchasing

the

PO

has

been

system
Review

suppliers

Outstanding payments are

performance and take any

made to supplier and PO

action

closed

necessary

with

regards to supplier status


Purchasing

7.0

in

Purchasing

system

PURCHASE PLANNING

process

completed

The Procurement Department and the Project Management and the Quality
Department is responsible, for planning and monitoring of purchases. The
supply system must be put in place to make it possible for availability of
products

and

reliable

suppliers

and

ensure

the

fulfillment

of

the

requirements ofs service.

Supplies planning
When planning supply, quality management and examination of
product, the following topics should be discussed:
Development of supply
Requirements to be applied to various types of
supply
Planning of supply
Qualification of new suppliers of products /
services
Renewal of the qualification of suppliers

File Name :

278075414.doc

This document is property of NAOC Ltd. Who lawfully reserves all rights. Any unauthorised attempt to reproduce it, in any form, is strictly
prohibited. NAOC will safeguard its rights according to the civil and penal provisions of the law

Company Identification

Rev. index.

Contractor Identification

3201.11.DBPF.1001

4600016138/39/40

Validity

Sheet of
Sheets

Rev. No.

Status

EX-DE

16 / 25

02

Projects Development, Engineering Division

Information

required

for

planning

and

monitoring

of

purchases
The need for new products / services and the planning of purchases are
regulated by
Contract/QA dept. through:
Market research
Processing and analysis of data related to customers
Analysis of non-compliance

8.0

USE AND MANAGEMENT OF SUPPLIERS


Suppliers to be used
The Vendors/Suppliers to be used are those indicated in the Companys
approved Vendors list. The use of new Vendors/Suppliers shall be in
accordance with process of evaluation, qualification and approval

Documents governing the relationship of supply


The documents governing the relationship of supply are:
Specific orders
Contracts
Letters of intent

Purchase of goods or services


Procurement / Quality dept is responsible for defining requirements,
terms and conditions contents to be applied in the supply of products
and services. When it may be necessary to use a new supplier, the name
must be reported to Quality dept. with all the information necessary for
its qualification.

File Name :

278075414.doc

This document is property of NAOC Ltd. Who lawfully reserves all rights. Any unauthorised attempt to reproduce it, in any form, is strictly
prohibited. NAOC will safeguard its rights according to the civil and penal provisions of the law

Company Identification

Rev. index.

Contractor Identification

3201.11.DBPF.1001

4600016138/39/40

Validity

Sheet of

Rev. No.

Sheets

Status

EX-DE

02

17 / 25

Projects Development, Engineering Division

9.0

ISSUANCE AND DISTRIBUTION


Issuance of RFP (Request for Proposal)
The purchase request is issued in written form by the Procurement officer
and must indicate:
The type of goods or services
The quality requirements to which must respond
The quantity
Delivery time

Order Issue
The purchase order shall be signed after the Company and Contractor
have agreed on the RFQ before sending to suppliers/vendors.

10.0

ISSUANCE AND DISTRIBUTION OF ORDERS


The purchase order must be signed by Project Director, Project Manager
and the Procurement Manager

or persons designated by them before

sending to suppliers.

Contents of purchase orders


The order must necessarily include the following:
Purchase order number and date of order
Sender
Job number (optional)
The recipient: Name, Name of Supplier (optional address and
phone)
Name, of the person to whom to refer (i.e. attention of Mr
xxx ... in case of prior agreements)
The

object

(material

or

description

of

service

required)
File Name :

278075414.doc

This document is property of NAOC Ltd. Who lawfully reserves all rights. Any unauthorised attempt to reproduce it, in any form, is strictly
prohibited. NAOC will safeguard its rights according to the civil and penal provisions of the law

Company Identification

3201.11.DBPF.1001

Rev. index.

Contractor Identification

4600016138/39/40

Validity

Sheet of

Rev. No.

Sheets

Status

EX-DE

02

18 / 25

Projects Development, Engineering Division

Quantity and product number (if any)


Precise description (for catalog products copy description
from the catalog itself)
Price (from list or catalog, or from agreed offer)
Any discounts or special conditions agreed
In the case of an offer by telephone, return the phrase "as in
telephone talks with your Mr. xxxxxx ... .. the price of ... .... (list
conditions agreed).
Time of delivery and payment
Mode of transport and in charge of whom ("transport by
courier" ... .. "Port assigned" or "free port", etc..)
OBLIGATORY signature of Project Director, Project Manager and
the Procurement Manager.

Order transmission
Purchase orders are made in written form and sent to suppliers by mail, by
courier or fax. Any purchase orders by telephone, are always confirmed in
writing (except for particular circumstances and urgent need) and
transmitted to suppliers in the above rules, or by written order
confirmation of the supplier.

Order Confirmation by suppliers


In the case where suppliers have a continuous relationship, it is considered
that the confirmation of acceptance of an order is implied. In other cases,
after a certain time without having received confirmation, PD/PM will have
to activate and obtain it.
This approach calls for operating flexibility and de-centralized decision
making, which CONTRACTOR is equipped with, as a professionally
managed

File Name :

company.

It

also

calls

for

familiarity

with

international

278075414.doc

This document is property of NAOC Ltd. Who lawfully reserves all rights. Any unauthorised attempt to reproduce it, in any form, is strictly
prohibited. NAOC will safeguard its rights according to the civil and penal provisions of the law

Company Identification

3201.11.DBPF.1001

Contractor Identification

4600016138/39/40

Rev. index.
Validity

Sheet of

Rev. No.

Sheets

Status
EX-DE

02

19 / 25

Projects Development, Engineering Division

procurement procedures.

Purchasing Organization
Refer to Project Organizational Charts in the Project Execution Plan
3208.20.GBPG.00001 as attachment 1

11.0

Material Control

11.1

Tracking of Materials
A material control chart (a Microsoft work sheet program) is prepared which
contains all the necessary information about the procurement of goods
from Purchase Order data covering through the period of shipment and
arrival date. This work sheet is available in Contractors created Dropbox
account and is periodically updated.

Recording of receipts for goods


Receive and inspect goods for damage during transport and complete the
Good reciept Inspection Report (GRIR). This GRIR is transmitted to
procurement specialists for action based on findings, if required.

Custom Clearance
In coordination with CONTRACTOR team, only approved companies who
are based in Nigeria shall handle all customs clearance and forwarding.

Traceability of goods upon receipt


The traceability of goods upon receipt is followed as per stores procedures
for receipt and issue.

Storage of goods

File Name :

278075414.doc

This document is property of NAOC Ltd. Who lawfully reserves all rights. Any unauthorised attempt to reproduce it, in any form, is strictly
prohibited. NAOC will safeguard its rights according to the civil and penal provisions of the law

Company Identification

Rev. index.

Contractor Identification

4600016138/39/40

3201.11.DBPF.1001

Validity

Sheet of

Rev. No.

Sheets

Status

EX-DE

02

20 / 25

Projects Development, Engineering Division

Adequate space will be provided at the port & site facilities to store
goods in line with Manufacturers recommendations

Stock/inventory control
The stock and inventory are controlled as per stores procedure for
receipt, storage & issue.

Inspection and expediting


Inspection shall be carried out as per the approved quality plan of the
project with expediting being done on a regular basis.

10.0

Materials Receiving (Local Purchased)


All

locally

purchased

materials

are

delivered

to

the

warehouse,

accompanied with original local purchase order(LPO), original delivery


note, three invoices (one original and two copies); and received by the
warehouse supervisor or his designated representative. The warehouse
supervisor will inspect the material to ensure that the quantity and price
(if applicable), match the LPO. Additionally, he will ensure that the quality
of items meet the QC requirements, when items delivered to the
warehouse does not meet the requirements, the warehouse supervisor
rejects the materials and inform the local purchase office. When items are
accepted,

the

warehouse

supervisor

signs

the

vendors

delivery

note/waybill. The vendor will provide the warehouse supervisor with


original delivery note or original local purchase order. The warehouse
supervisor will forward these documents to the local purchase office and
copy the Construction Manager.
The Project manager will review the price, description of goods received by
signing on the

delivery note/waybill. He will also initial his name on the

LPO and invoice, and then forward the documents to the warehouse
File Name :

278075414.doc

This document is property of NAOC Ltd. Who lawfully reserves all rights. Any unauthorised attempt to reproduce it, in any form, is strictly
prohibited. NAOC will safeguard its rights according to the civil and penal provisions of the law

Company Identification

3201.11.DBPF.1001

Rev. index.

Contractor Identification

4600016138/39/40

Validity

Sheet of

Rev. No.

Sheets

Status

EX-DE

02

21 / 25

Projects Development, Engineering Division

administrative department.
12.0

FORMS

BGS FORM-PP-001 - Over Short and Damaged Report

BGS FORM-PP-002 - Materials Receiving Report

BGS FORM-PP-003 - Supply Issue Voucher

BGS FORM-PP-004 - Non-Conformance Report

BGS FORM-PP-001 Job No:

OVER, SHORT, DAMAGE REPORT


Ref No: BGS FORM-PP-

O.S & D.No:

001

Client:
Shipper:
Date Prep:
Port of Origin:
Rec. Point:
P.O. No:
Del:
Truck No:
D.M.I. No:
Way Bill No:
Date Recd:
M.I.V. No:
ABOVE SHIPMENT RECIEVED IN FOLLOWING CONDITION
Overage
Shortage in packing

or Substitution
package in apparent good order but

contents short
Shortage in delivery
File Name :

No of pcs. On W B

No of

278075414.doc

This document is property of NAOC Ltd. Who lawfully reserves all rights. Any unauthorised attempt to reproduce it, in any form, is strictly
prohibited. NAOC will safeguard its rights according to the civil and penal provisions of the law

Company Identification

3201.11.DBPF.1001

Rev. index.

Contractor Identification

4600016138/39/40

Validity

Sheet of
Sheets

Rev. No.

Status

EX-DE

22 / 25

02

Projects Development, Engineering Division

pcs. recd
Shortage in shipment

package damaged.

Appears

opened on repacked
Content short Damaged

visible damage to material.

Any damaged goods recieved notify QA/QC Dept. For Inspection.


Damaged concealed damage package in apparent good order
P.O. Item No.

Recommendation:

Quantity

Quantity

Ordered

Recieved

Repair in Field

Unit

Description

Return to shipper/vendor Replace

Estimated cost of repair damage or replace:


Project Engineer notified on:

Action By

Deliver Document Attached?

Yes

Recieving Report attached

Yes
No
Was damage or loss due to poor packing: Lack of precautionary packs? Other
reason?
Explain.......................................................................................................................
......................
Prepared By:
Approved By:
BGS FORM-PP-002 - MATERIALS RECIEVING REPORT
Project:

No.

Delivery
Number

order Shi
p

Recievin
g

Report

No.
Client:
Contract Number:
Job Number: BGS FORM-PP002
Date
File Name :

278075414.doc

This document is property of NAOC Ltd. Who lawfully reserves all rights. Any unauthorised attempt to reproduce it, in any form, is strictly
prohibited. NAOC will safeguard its rights according to the civil and penal provisions of the law

Company Identification

Rev. index.

Contractor Identification

4600016138/39/40

3201.11.DBPF.1001

Validity

Sheet of
Sheets

Rev. No.

Status

EX-DE

23 / 25

02

Projects Development, Engineering Division

Remarks:
Part
Item#

Qty. U/M

Numbe

Description

O.S.D

Report

Key:
O- over S- Short D- Damaged
Signed:

Date

Prepared/recieved by:

Date

(QA/QC) Rep.
BGS FORM-PP-003 - SUPPLY ISSUE VOUCHER
FROM:
REQ:
JOB NO: BGS FORM-PP-003

TO:
EQUIP NO.
ITEM

File Name :

QTY

U/M

PART NO.

DESCRIPTION

IMPORT

LOCAL

278075414.doc

This document is property of NAOC Ltd. Who lawfully reserves all rights. Any unauthorised attempt to reproduce it, in any form, is strictly
prohibited. NAOC will safeguard its rights according to the civil and penal provisions of the law

Company Identification

Rev. index.

Contractor Identification

3201.11.DBPF.1001

4600016138/39/40

Validity

Sheet of

Rev. No.

Sheets

Status

EX-DE

24 / 25

02

Projects Development, Engineering Division

TOTAL

ISSUED BY:
W/H MGR

RECIEVED BY:

CONFIRMATION

W/H SUPERVISOR

WHITE: WAREHOUSE NUMERICAL FILE

BLUE: MECHANICAL DEPARTMENT

PINK: WAREHOUSE SECURITY + REQUISITIONER

GREEN: WAREHOUSE REFERENCE COPY

BGS FORM-PP-004 - NON CONFORMANCE REPORT


(1) LOCATION

(2) NCR NO:

BGS FORM-

PP-004
(3) CONTRACT/JOB
(5) RESPONSIBLE PARTY

(4) DATE:
(6)

AUDIT

NO:

(IF

APPLICABLE)
(7) REFERNCE, SPECIFICATION/PROCEDURE
(8) DESCRIPTION OF NON-CONFORMANCE:
Block 1 to 8 completed by Initiator of NCR
(9) PROBABLE CAUSE OF NON-CONFORMANCE
Block 9 completed by QA/QC Manager or Designee
File Name :

278075414.doc

This document is property of NAOC Ltd. Who lawfully reserves all rights. Any unauthorised attempt to reproduce it, in any form, is strictly
prohibited. NAOC will safeguard its rights according to the civil and penal provisions of the law

Company Identification

3201.11.DBPF.1001

Rev. index.

Contractor Identification

4600016138/39/40

Validity

Sheet of
Sheets

Rev. No.

Status

EX-DE

25 / 25

02

Projects Development, Engineering Division

(10) SUGGESTED

(Engineering decision requires

date & signature in this block)


CORRECTIVE ACTION:
USE-AS-IS ( ) REWORK ( ) REPAIR ( ) REJECT ( ) SCRAP ( ) OTHER ( ) {DEFINE BELOW}
Block 10 Completed by Project Manager or Designee
(11) QA/QC Manager:
Sign:

Date:

(12) CORRECTIVE ACTION TAKEN


Block 12 Completed by Project Manager
(13) VERIFICATION OF CORRECTIVE ACTION:

(14) DISTRIBUTION TO:


PROJECT DIRECTOR [
PROJECT MANAGER

Completed by QA/QC Manager


or QA/QC Engineer

Date:

]
[

QA MANAGER

PROJECT ENGINEER

NCR LOCATION

FILE

Representative
Completed

by

QA/QC

Mgr

or

Designee

File Name :

278075414.doc

This document is property of NAOC Ltd. Who lawfully reserves all rights. Any unauthorised attempt to reproduce it, in any form, is strictly
prohibited. NAOC will safeguard its rights according to the civil and penal provisions of the law