Construction Monitoring of a Gas Pipeline during


3 D Horizontal Directional Drilling
LI Su-zhen1 CHEN Jun2 XIE Qiang1
1 Department of Building EngineeringTongji UniversityShanghai 200092China
2 Department of Civil EngineeringShanghai Jiaotong UniversityShanghai 200240China
Abstract It is of great significance for municipal pipeline engineering construction to implement 3 D horizontal directional
drilling HDD In virtue of a practical projectthis work carries out the onsite monitoring of a gas pipeline during 3 D HDD
construction Based on gyroscopic position-detection system and a fiber optic sensing techniquean integrated scheme for the pipeline construction monitoring is designed and conducted The 3 D spatial coordinates of the overall pipeline are measured The
mechanic responses of the tested section running through the whole drilling track are obtained It testifies that the longitudinal
strains and the sectional moments are sharply increased as the tested pipe traverses with a rotation simultaneously on the horizontal and vertical planes The recorded data are informative for a further theoretical analysis and the monitoring strategy can provide
a reference for such similar projects
Key words gas pipeline 3 D HDD construction monitoring fiber optic sensor gyroscope

08PJ14097
2006BAJ16B02 01
2011 01 05
2011 06 22

40

Pipeline Technique and Equipment

Nov. 2011

300 mm 520

0. 4 MPa GB1

SS400 D325 8

4 m

300 mm

520

4 m 2 2 m

m 21. 4 m

2 300

2 2

m 220 m

350 mm 2

4 2

4 m

4 m

USB

2 300 m

220 m 8 50PM
10

30PM

00 30AM 01 50AM

3
1 Hz s 1

3 1 216

4

41

4
4 1

4 2

AutoCAD 3

4 4

ABC AC x
B x y
x' E

A B C
3

A = E A

a b a a

B = E B

C = E C

m
1 /3

4 3


1

2
4 3
AutoCAD


M N
A =

N My
N sin
+ h A = +
h A
A Iy
A
Iy

B =

N Mx
N cos
+ h B = +
h B
A Ix
A
Ix

C =

N My
N sin
h C =
h C
A Iy
A
Iy

A M x I x x
M y I y y h A h B h C
ABC

Ix = Iy =

R
1 r4 / R4
4

42

Pipeline Technique and Equipment


A = R2 r2

23 27

hA = hB = hC = r

R r

28 32

4 6
N=

33

A hC + C hA
A + C
2
2
A =
R r
hA + hC
2

10

4 5
3

M=

Nov. 2011

R
1 r4 / R4
4

36

N
A

) +(
2

N
A

11

2

3

1 GB 5025194

2 GB 5025103

3 Li SuzhenWu Zhishen Development of Distributed Long-

160 kN

gage Fiber Optic Sensing System for Structural Health Moni-

toring Structural Health Monitoring


2007
6 2 133 143



4 22

4
2009

1978