5. TIME SCHEDULE
4. AREA STATEMENT
3.2 VIEWS
3.1 SITE
3.0 INTRODUCTION
3. PROJECT
1. ACKNOWLEDGEMNT
About Firm
Name : A Core Architectural Services Pvt. Ltd.
Established in 2007 by Managing Director Ashish Shrivastava.
Employees:
Accounting Management
Office Management
9
7
5
Technical Staff
Civil Engineers
Surveyors
Draftsman
Nos.
Designation
Scope of Services
SOIL INVESTIGATOR
STRUCTURAL DESIGN
CIVIL ENGINEERING PROJECT PREPARATION
ARCHITECTURAL DESIGN
Clients
National Buildings
Construction Corporation Ltd.
Hundustan Steelworks
Construction Ltd.
Projects handled by me
File/Docs
Site/other
drawings
Work Dynamics
Client
Feedback
Me
Feedback
Brief
Consult
CE/Handler
Surveyor
Final Handover
Project
1
H/O
Annapurna Bhattacharjee
Ramnagar
Road No.3
Gorakhpur
Option 1 GF Plan
Option 1 FF Plan
Option 2 GF Plan
Option 2 FF Plan
Final GF Plan
Final FF Plan
Final Elevation
Final Section
Project
2
H/O
Anuran Debnath
Road No.15
Raptinagar Phase-II
Gorakhpur
Site Plan
Options
Option1 GF Plan
Option1 Elevation
Option 1 Section
Final GF Plan
Final Elevation
Final Section
Septic Tank
NBC:
1.) 750 mm width min
2.) length to be 2 to 4 times width
3.) Min. depth is 1 m
Points:
1.) Effluent pipe lower than
inlet pipe
2.) Filters eg. Gravel filters
Baffle Wall
Project
3
H/O
Pranesh Das
Indranagar
Gorakhpur
Site Plan
Municipal App. GF
Municipal App. FF
Final GF Plan
Final FF Plan
Final Elevation
Final Section
Project
4
Toilets
Ramel Industries
GIDA (Gorakhpur Industrial Development Area)
Initial GF plan
Initial Section
Final GF plan
Final Elevation
Final Section 1
Final Section 2
Project
SITE
GF Plan
Front Elevation
SITE PLAN
SITE PLAN
I read across many regulation of the local body and learnt through my senior design
members how these issues are to be tackled through efficient designing. At this very
moment I would like to quote from Ar. Lim, We are architects and we dont design
things for just fun by this he meant that every single line we design has a reason
behind it, be it the vastu or functional or energy related physical phenomenon.
An architect has to be aware about everything.
The important challenges that I faced while designing were service cores, parking
areas along with meeting the fire requirements and other government by laws and
at the same time maintaining balance between the commercial wishes of the client
and an architecture that is socially and environmentally sound.
I also realized that a proper market survey and feasibility report is prepared prior to
such a large scale commercial project
On any functional site the architect is the top chain in command (superintendent
officer) and he issues orders and corrections if any to be done while the
construction process is still on.
I now understand that in any project architectural design is not a single entity
performed by architects but an integrated team of experts and consultants whose
job is to actually implement the ideas and solution on site what we architects have
perceived and envisioned.
I also got an idea how a design firm operates and works, its administrative structure
and office infrastructure.