Beruflich Dokumente
Kultur Dokumente
FOR EMPLOYEES
AND CONTRACTORS
..........................................................
Signature
(.......................................................)
Name
PTTEP
Contractor (Company)
.....................................
Date ........../..................../....................
Detach: Sign and return to corporate SSHE (TSH Secretary)
For more information, please visit PTTEP Intranet/Recommended Websites/SSHE Intranet
Or E-mail SSHE@pttep.com
..........................................................
Signature
(.......................................................)
Name
PTTEP
Contractor (Company)
.....................................
Date ........../..................../....................
Content
Page
10
12
4. SSHE Policy
14
18
30
42
42
44
44
19
20
20
20
22
23
26
46
50
Page
50
52
54
57
59
63
66
69
74
76
Objective
of
SSHE Handbook
This SSHE Handbook has been developed for
PTTEP staff and contractors to learn about their own duties
which are fundamental statutory rights. It also provides
safe working practice guidelines in E&P activities which are
considered high risk business that can cause loss of life
and property if there is no effective management system
in place. Therefore, it is required that all PTTEP staff and
contractors clearly understand and strictly comply with this
SSHE Handbook at all times.
Message
from
CEO
10
This PTTEP SSHE Handbook has been prepared
with the primary objective of providing safe working practice
guidelines in consistent with relevant SSHE laws and regulations.
Therefore, both PTTEP staff and contractors shall read,
understand and strictly comply with this handbook in order
to manage risks efficiently and to work safely. This is to
ensure that everyone returns home safely and nobody gets
hurt under PTTEP operations.
I need to emphasize that everyone has a Stop
Work Authority and shall never hesitate to use it when jobs
are considered unsafe. Moreover, it is everybodys responsibility
to immediately report any unsafe act and unsafe condition
to his/her line management.
Strong SSHE culture is a foundation to move
towards SSHE excellence. Hence, SSHE is everybodys
responsibility. Your commitment to SSHE, as well as social
responsibility, will pave the way for PTTEP to ultimately
achieve our SSHE aspiration to become Target Zero organization.
Tevin Vongvanich
President and Chief Executive Officer
July 2013
11
SSHE Vision
and
Missions
Vision
PTTEP will be an organization that strives to
achieve excellence and a position of leadership by being
an injury-free workplace, a leader in security and health
management whilst committed to demonstrate environmental
responsibility.
Missions
Eliminate all incidents and injuries through hazard
management and behavior-based safety.
Deliver reliable and secure supply of energy using
the latest technology and in parallel with responsibility
in sustainable development.
Create SSHE culture grounded in leadership at every
level of the organization including contractors where
everybody understands and uncompromisingly
12
13
SSHE Policy
14
To meet these commitments, PTTEP has in
place a SSHE Management System (SSHE MS) that
outlines the main principles and accountabilities to
drive for continuous improvement.
PTTEP shall:
Create a proactive and compliant SSHE culture
through visible leadership and commitment from
management and employee involvement.
Ensure that all employees and contractors are
accountable for their own safety and the safety of
those around them.
Meet or exceed compliance with all applicable SSHE
laws and regulations, and international standards in
all of our operations worldwide.
Ensure that all employees and contractors have been
assessed and maintain the required level of job and
SSHE competency.
Identify, eliminate or minimize, and manage SSHE
risks to be As Low As Reasonably Practicable (ALARP).
Reinforce to all employees and contractors that they
are responsible for and authorized to stop any work
they believe to be unsafe (Stop Work Authority, SWA).
Strive to achieve and maintain SSHE excellence by
setting measurable SSHE objectives and targets
15
Tevin Vongvanich
President and Chief Executive Officer
16
17
SSHE Management
Structure,
Roles and
Responsibilities
18
19
24
25
26
27
28
29
SSHE
Management
System
(SSHE MS)
PTTEP SSHE MS is the foundation for operational
and risk control which is essential for effective operation
of all SSHE and SSHE-related activities within the
organization. Effective implementation of SSHE MS will
lead to incident prevention, injury reduction and environmental
impact mitigation.
SSHE MS reflects company strategic direction
and serves as minimum requirements that shall be consistently
implemented and complied across PTTEP operations including
all support functions in order to ensure that SSHE risks
have been effectively managed. SSHE MS also outlines
our main principles and strategies in order to drive continual
SSHE improvement.
PTTEP SSHE MS was designed to be in line with
International Association of Oil and Gas Producers (OGP)
guidelines and other international standards such as
30
31
SSHE MS Element 1
SSHE MS Element 2
SSHE MS Element 3
34
SSHE MS Element 4
Evaluation and Risk Management
Summary : Identification and evaluation of
SSHE risks and development of risk reduction
measures
SSHE Risk Management Standard
(SSHE-106-STD-400)
Description: Ensure that the major hazards, to which people,
environment and asset are exposed, properly identified,
risks are evaluated and reduced to As Low As Reasonably
Practicable (ALARP).
Hazard and Effects Management Process Standard (HEMP)
(SSHE-106-STD-410)
Description: Define the processes required to identify and
assess SSHE hazards, implement control and recovery
measures and maintain a documented demonstration that
major SSHE risks have been reduced to ALARP.
Safety Case Standard
(SSHE-106-STD-420)
Description: Outline the requirements of safety case
development at each phase of facility life cycle, using HEMP,
in demonstrating that sufficient measures are in place to
prevent a Major Accident Event (MAE).
35
SSHE MS Element 5
38
39
SSHE MS Element 6
Implementation and Monitoring
Summary : Effective SSHE MS implementation and SSHE performance monitoring
to ensure that SSHE MS requirements are
strictly complied with
Incident Management Standard
(SSHE-106-STD-600)
Description: Define minimum requirements for incident
reporting, classification, investigation and corrective actions
identification including communicating the lessons learned to
prevent recurrences.
SSHE KPIs and Performance Management Standard
(SSHE-106-STD-610)
Description: Define a framework for setting SSHE KPIs, both
leading and lagging, as a mechanism for measuring how well
SSHE MS is being implemented and for continuous
improvement.
Behavior-Based Safety Standard (BBS)
(SSHE-106-STD-620)
Description: Define principles of BBS applied to PTTEP staff and
contractors.
40
SSHE MS Element 7
Audit and Review
Summary : Periodic assessments of SSHE MS
performance to ensure SSHE MS compliance
and periodic review for its effectiveness
Audit and Review Standard
(SSHE-106-STD-700)
Description: Define minimum requirements for SSHE MS
audits including auditor qualification, audit frequencies, terms
of reference, audit report and audit findings close out to
ensure SSHE compliance with legal and company SSHE MS
requirements. SSHE MS review is also identified to ensure its
effectiveness and continuous improvement.
41
Minimum
SSHE
Requirements
43
44
45
Seat belt
No phone and
obey speed limits
Journey
management plan
No drugs
or alcohol
Do not smoke
Work permit
Working at height
Verify isolation
46
Dropped
objects
Position in
a safe zone
Lift plan
System override
Confined space
Gas tests
Authorization before
excavation
Personal
floatation device
In case life saving program does not cover
warning signs and safety signs, worksite safety signs are
to be applied.
47
48
49
51
52
Anchorage
Lanyard with
shock absorber
53
General requirements:
Permit to work is required for confined space entry.
Barricade the confined space entry point with warning
signs. Record all entries and exits of the confined
space.
Isolate all potential hazardous energy, e.g. electricity,
pressure, chemicals, etc.
Test and record atmospheric hazards, e.g. oxygen,
combustible gases and vapours, and toxic gases
and vapours before and during working in confined
space. Suitable level of working in the confined space
for the atmospheric oxygen concentration is between
19.5 to 23.5%, whilst the flammable gas, vapour,
or mist concentration is no greater than 10% of its
lower flammable limit (LEL).
55
56
a ^kdbo
General requirements:
Permit to work is required for working with electricity.
Isolate all potential hazardous energy and apply
proper lockout/tagout (LOTO) by trained and competent
person. The isolation of hazardous energy (or LOTO)
shall be tested prior to beginning work.
Select appropriate electrical tools and equipment to
match the voltage levels of the load.
Install electrical safety equipment that is suitable
for its intended use and working conditions in which
it is operated, e.g. insulation sheets, electrical wire
insulation, porcelain insulators, etc.
57
58
59
60
61
64
65
General requirements:
All chemicals used in the workplace shall be registered
in the chemical inventory. For new chemical, it shall
be approved by corporate SSHE prior to issuing
a purchase order.
Chemical hazards shall be identified and communicated
through the Safety Data Sheet (SDS) and labels
following the Globally Harmonized System of Classification
and Labelling of Chemicals (GHS) and the NFPA
704: Standard System for the Identification of the
Hazards of Materials for Emergency Response.
The land, sea and air transport of all chemicals
shall comply with the requirements of the United
Nations Recommendations for the Transport of
Dangerous Goods (UNRTDG).
Persons working with chemicals shall clearly understand
and follow all information outlined in the SDS. Proper
PPE shall be applied.
Emergency preparedness and response plan shall
be in place and regularly exercised among those
working with chemicals, i.e. warehouse and logistics
personnel, and chemical users. This includes the
adequacy and readiness of fire extinguishers and first
aid equipment.
67
BENZENE
Danger
Ingredients:
benzene, 71-43-2, 99.9
Hazard Statements:
H225 - Highly flammable liquid and vapour
H315 - Causes skin irritation
H319 - Causes serious eye irritation
H340 - May cause genetic defects
H350 - May cause cancer
H336 - May cause drowsiness or dizziness
H372 - Causes damage to organs through
prolonged or repeated exposure
H304 - May be fatal if swallowed and enters
airways
Class: 3
Subrisk:
HAZCHEM: 3WE
Packing group: II
Precautionary Statements:
Obtain special instructions before use.; Keep away
from heat, hot surfaces, sparks, open flames and
other ignition sources. No smoking.; Do not breathe
dust/fume/gas/mist/vapours/spray.; Use only outdoors
or in a well-ventilated area.; Wear protective
gloves/protective clothing/eye protection/face
protection.; Do not eat, drink or smoke when using
this product.; Ground/bond container and receiving
equipment.; Use explosion-proof electrical/ventilating
/lighting/intrinsically safe equipment.; Use only
non-sparking tools.; Take precautionary measures
against static discharge.
UN number: 1114*
Proper Shipping Name
BENZENE
Batch Number:null
Expiry Date:null
Qty: X L/kg
Contact Details:Company
details
69
Reporting authority:
Contact No:
Telephone number
Place of incident:
70
71
C
SO
72
This 6-step is also applied to the HRC report
where the observation of unsafe acts/conditions is unplanned.
C
R
H
73
75
76
77
78