DIVISION-1

General and Site Facilities

USD:

DIVISION-2

Main Bridge Work

USD:

DIVISION-3

Slope Protection Work

USD:

USD:

SUB-TOTAL-A:
B.

Add
Provisional Sum for Physical
Contingencies (5% of A)

USD:

SUB-TOTAL-B:

USD:

TOTAL (A+B) :

USD:

TOTAL TENDERED SUM :

USD:

Total USD (In Words).

ng River Kayibu

Project Title: Construction of 3 - Bridges 50m long River Kaya, 20m long River Koni and 20m long River Kayibu
DIVISION-1: GENERAL AND SITE FACILITIES
BoQ
Item
No.

Pay
Item
No.

USD:

Quantity

Contractor's Establishment on site: Establishing of all the facilities on or


adjacent to the Site that the Contractor deems necessary for fulfilment of all
his obligations under the Contract

LS

PS

PS

a) Relocation Cost

PS

108(1)

1.2

113(1)

113(1)
130.8(b)

130(15)
816(1)

USD:

Unit

108(1)

1.4

Amount

Description of work

1.1

1.3

Unit Rate

Reference
Specificati
on no.

The work of temporarily supporting and protecting public utility services


during execution of the Works for the Demolition and Rebuilding of Property as
instructed
Engineer Tests to be done elsewhere.
Special andbyAdditional
a) Special and Additional Tests

816

Relocation of Utilities as required and instructed by Engineer

1.5

131(1)

131(1)

Allow for providing and maintaining Project Sign Boards in the format
acceptable to the Engineer.

no.

1.6

133(1)

133

Providing and fixing Marble stone for foundation laying both end of the bridge
as per direction of Engineer

PS

1.7

132(1)

132

Allow for providing all necessary Insurances for workforce for all risks

L.S.

1.8

132(2)

132

Allow for providing all necessary bonds and securities as are required and
detailed in the Tender Documents, Conditions of Contract or this Specification
under this contract

L.S.

TOTAL (DIVISION-1)

Project Title: Construction of 3 - Bridges 50m long River Kaya, 20m long River Koni and 20m long River Kayibu
DIVISION-2: BRIDGE CONSTRUCTION WORKS
A. FOUNDATION WORKS
Reference
BoQ Item Pay Item
Specification
No.
No.
no.
2.1

201(1)

201

2.3

302(1),
302(2)

302.3

Description of work

All clearing and grubbing necessary for the performance of the work
Sq.m.
covered by the Contract in accordance with the Specifications.
a)

i)
b)
302(1),
302(2)

302
i)
b)

302(3)

Unit Quantity

302.3

Unit Rate

Amount

USD:

USD:

600

Excavation for foundations of piers, abutments and wing walls in


unclassified soil including leveling ramming of bottom
of the
excavation and backfill of structures with approved material as
mentioned
0 to 3.00m below:
depth

cu.m

250

Excavation for foundations of piers, abutments and wing walls in


weather/moderately hard rock inclusive all type of bolder up to 03m 3
size (if available at site) including leveling ramming of bottom of the
excavation and backfill of structures with approved material as
mentioned below:
0 to 3.00m depth

cu.m

40

sq.m

90

180

Preparation of base of foundation by the removal of the weather rock


including all type of bolder up to 3m3 size (if available at site), &
backfill with approved porous backfill material in layers not exceeding
150mm as per direction of Engineer i/c supply of all materials,
labours and equipments etc. complete.

Driven of H Pile in all types of soil/Lime Stone/Boulder/rock (Pile toe to


be terminated at minimum Rock Quality Designation value 50%
(RQD) including labour, tools, plants, equipments etc. complete.
1004.5(A)(e)
Measurement shall be taken from the existing Ground level for
Abutment piles and from river bed level for Pier Piles for driven length
of pile.
250mm H pile
a)
Upto 20m depth
Mixing and pouring concrete Grade-30 (Cylinder strength) including metal,
1001 & 1004.5(A) Sand admixture/Retarded for RCC work in cast-in-situ piles with tremie pipe
i/c all labour, tools, plants, equipments etc. complete except supply of
(g)
Cement as per drawing and specification and direction of Engineer.
a)

2.5

1004(1)

2.5(1)
2.11

2.12
2.13

1001(1)

1002(1)
804(1)

1002
804

Weight of H Pile (fy = 35000 Psi) for Abutment Piling


Foundation treatment by 2m to 2.5 thick rabble packing with 1:6 Cement
Sand mortar as per specification and direction of Engineering in charge
SUB-TOTAL-A:

P.S
cu.m

P.S
cu.m

BoQ Item Pay Item


No.
No.

Reference
Specification
no.

Description of work

Unit Quantity

Unit Rate

Amount

USD:

USD:

B. SUB-STRUCTURE WORKS

2.14

1001(1)

1001

2.15

1001(1)

1001

2.16

2.18

1002(1)

1001(2)

1002

1001

Mixing and casting in-situ cement concrete Grade-30 (Cylinder Strength) for
RCC works in different components of the sub structure (including pile cap)
including metal, sand, preparing of formworks & fitting/fixing, scaffolding,
laying, vibrating, curing and finishing i/c all labour, tools, equipments,
plants, nails, reterder/admixture compounds, water/ice cubes etc. complete
in conformity with drawing and specification direction of the Engineer
except supply of cement, and formwork materials (black laminated ply
wood).
Mixing and casting in-situ cement concrete Grade-35 (Cylinder Strength) for
RCC works in Bearing seat of the sub structure including metal, sand,
formworks preparing & fitting/fixing, scaffolding, laying, vibrating, curing
and finishing i/c all labour, tools, equipemnts, plants, nails,
reterder/admixture compounds, water/ice cubes etc.complete in conformity
with drawing and specification direction of the Engineer except supply of
cement and formwork materials (black laminated plywood).

cu.m

120

cu.m

15

20

15

Fixing in position in different components of sub structures including pile


cap high yield deformed bars (fy = 460 MPa) specified reinforcement
including cleaning, cutting, bending, hooking, placing in position and tying
as per drawing and specification including the transporting from material tonne
yard to site, binding wires, nails, labours, tools, plants, equipments etc
complete except supply of reinforcement bars.
Mixing and casting in-situ cement concrete Grade-15 (Cylinder Strength) for
Blinding Concrete (150mm thickness) including metal, sand, formworks
preparing & fitting/fixing, scaffolding, laying, vibrating, curing and finishing
i/c all labour, tools, equipemnts, plants, nails, reterder/admixture
compounds, water/ice cubes etc.complete in conformity with drawing and
specification direction of the Engineer except supply of cement, and
formwork materials (black leminated plywood).
SUB-TOTAL-B:

cu.m

BoQ Item Pay Item


No.
No.

Reference
Specification
no.

Description of work

Unit Quantity

Unit Rate

Amount

USD:

USD:

C. SUPER-STRUCTURE WORKS

2.19

1002(1)

1002

2.20

1001(1)

1001

2.21

1003(1)

1003

2.25

1001(1)

1001

2.26

1010(1)

1010

Fixing in position in different components of super structures high yield


deformed bars (fy = 460 MPa) specified reinforcement including cleaning,
cutting, bending, hooking, placing in position and tying as per drawing and tonne
specification inlcuding the transporting from material yard to site, binding
wires, nails, labours, tools, plants, equipments etc complete except supply
of reinforcement bars.
Mixing and casting in-situ cement concrete Grade-30 (Cylinder Strength)
for RCC works in different components of the super structure including
metal, sand, formworks preparing & fitting/fixing, scaffolding, laying,
vibrating, curing and finishing i/c all labour, tools, equipments, plants, nails, cu.m
reterder/admixture compounds, water/ice cubes etc. complete in conformity
with drawing and specification direction of the Engineer except supply of
cement, and formwork materials (black laminated plywood).
Weight of supplying, fabricating, fitting fixing placing of Steel I Girder (Fy=
50,000 Psi) including welding, Galvanized Paint, (including nut bolt Gusset
plate etc )in position as per direction of Engineering in Charge and as per
drawing and specification, including the preparation of working drawing for
approval from UNOPS/USAID
Mixing and casting in-situ cement concrete Grade-25 (Cylinder Strength)
for RCC works in Approach slab including mertal, sand, formworks
preparation & fitting/fixing, scaffloding, laying, vibrating, curing and
finishing i/c all labour, tools, equipemnts, plants, nails, reterder/admixture
compounds, water/ice cubes etc.complete in conformity with drawing and
specification direction of the Engineer except supply of cement, and
formwork materials (black laminated plywood).
Fitting, fixing and installation of Neoprene bearings in position i/c required
materials for fixing, labours, tools, equipments, plants etc. complete as per
drawing, specification and direction of the Engineer; except the supply of
Neoprene Bearing Pad.

22

110

tonne

85

cu.m

12

2.26(1)

a)

300x300x60

nos.

2.26(2)

b)

400x400x100

nos.

L.m.

23

L.m

25

2.27

1009(1)

1009

2.27(1)
2.29

Fitting, fixing and installation of Expansion Joints in Deck of the the Bridge
in accordance with the drawing, specification and direction of the Engineer
i/c all labours, tools, equipments, plants etc. complete except the supply of
Expansion joint steel angle and filler materials.
a)

706(1)

706

Open expansion joint

Fixing rain water down pipe in walkway area using pipes (75 mm dia. PVC)
to facilitate the drainage of any water collected at the walkway of the
superstructure, as given in the drawings or as directed by the Engineer, and
in accordance with these specifications except supply of 75mm PVC pipe.

SUB-TOTAL-C:

BoQ Item Pay Item


No.
No.

Reference
Specification
no.

Description of work
TOTAL (DIVISION-2)

Unit Quantity

Unit Rate

Amount

USD:

USD:

Project Title: Construction of 3 - Bridges 50m long River Kaya, 20m long River Koni and 20m long River Kayibu
DIVISION-3: SLOPE PROTECTION WORKS
BoQ Pay Reference
Item Item Specificati
No.
No.
on no.
3.1 804(1)

3.2

302(1
),
302(2
)

804

302.3

3.2(1)

3.3

302(1
),
302(2
)

3.4 805(1)

3.5 302(1)

302.3

805

302

Description of work
Supply and laying the Rip Rap (450mm thick) on geo textile for
embankment and slope protection and erosion control, furnished
and constructed in accordance with these specifications and in
conformity with lines grades and dimensions and at locations shown
on drawings or established by the Engineer i/c labour, tools, plants,
equipments etc. complete.
Excavation for foundations of piers, abutments and wing walls in
unclassified soil including leveling ramming of bottom of the
excavation and except supply of backfill materials of structures with
approved material as mentioned below:
a) 0 to 3.00m depth
Excavation for foundations of piers, abutments and wing walls in
weather rock including all type of bolder up to 3m3 size (if available
in site) including leveling of bottom of the excavation and except
supply of backfill materials of structures with approved material as
mentioned below:
Gabion wall for embankment and slope protection and erosion
control (for abutment protection), furnished and constructed in
accordance with these specifications and in conformity with lines
grades and dimensions and at locations shown on drawings or
established by the Engineer; i/c labour, tools, equipements, plants
etc. complete except supply of Gabion wires and stone blocks.
Earthwork in cutting/filling for Slope protection works.
TOTAL (DIVISION-3):

Unit Quantity

Unit Rate

Amount

USD:

USD:

cu.m

200

cu.m

50

cu.m

10

cu.m

75

cu.m

75

0