Bridge Inspection Report

I65-175-05541 BNBL
I-65 NBL
over
WILDCAT CREEK

Inspection Date: 05/19/2015


Inspected By: Matt Ference
Inspection Type(s): Routine

TABLE OF CONTENTS
PAGE NUMBER
LOCATION MAP

NATIONAL BRIDGE INVENTORY

ELEMENTS

12

PICTURES

13

Inspector: Matt Ference

Asset Name:

Inspection Date: 05/19/2015

Facility Carried:
Bridge Inspection Report

Latitude: 40.44214
Longitude: -86.839874

Page 3 of 21

I65-175-05541
BNBL
I-65 NBL

Inspector: Matt Ference

Asset Name:

Inspection Date: 05/19/2015

Facility Carried:

I65-175-05541
BNBL
I-65 NBL

Bridge Inspection Report

The south approach slab has approximately 12 ft^2 of patching and the
north approach slab has approximately 47 ft^2 of patching. There are wide
transverse cracks in both approach slabs spaced greater than 3' apart.
The north transverse joint leaks, has loss of adhesion, and is filled with
debris. The south transverse joint is filled with debris (Matt Ference,
05-19-2015).
As per plans submitted, ratings for Rehab C have been performed.
Operating ratings are > 1.0. JLH 04/16/15

Page 4 of 21

HS20

Inspector: Matt Ference

Asset Name:

Inspection Date: 05/19/2015

Facility Carried:

I65-175-05541
BNBL
I-65 NBL

Bridge Inspection Report

IDENTIFICATION
(1) STATE CODE:

185 - Indiana

(12) BASE HIGHWAY NETWORK: 1

(8) STRUCTURE:

037640

(13A) INVENTORY ROUTE:

0000000001

(5 A-B-C-D-E) INV. ROUTE:


(2) HIGHWAY AGENCY
DISTRICT:
(3) COUNTY CODE:
(4) PLACE CODE:

1 - 1 - 1 - 00065 - 0
01 - Crawfordsville

(13B) SUBROUTE NUMBER:


(16) LATITUDE:

01

(17) LONGITUDE:

-86.839874

(6) FEATURES INTERSECTED:

WILDCAT CREEK

A) STATE NAME:

(7) FACILITY CARRIED:

I-65 NBL

B) PERCENT

(9) LOCATION:

01.04 S SR 25

(11) MILEPOINT:

0173.730

079 - TIPPECANOE
40788 - LAFAYETTE

40.44214

(98) BORDER

(99) BORDER BRIDGE STRUCT.


NO:

STRUCTURE TYPE AND MATERIAL


(43) STRUCTURE TYPE, MAIN:
A) KIND OF
MATERIAL/DESIGN:
B) TYPE OF DESIGN/CONSTR:
(44) STRUCTURE TYPE,
APPROACH SPANS:
A) KIND OF
MATERIAL/DESIGN:
B) TYPE OF DESIGN/CONSTR:

4 - Steel continuous
02 Stringer/Multi-beam or
Girder
0 - Other
00 - Other

(45) NUMBER OF SPANS IN MAIN 005


UNIT:
(46) NUMBER OF APPROACH
0000
SPANS:
(107) DECK STRUCTURE TYPE: 1 - Concrete
Cast-in-Place
(108) WEARING SURFACE/PROT
SYS:
A) WEARING SURFACE:
3 - Latex Concrete or
similar additive
B) DECK MEMBRANE:

0 - None

C) DECK PROTECTION:

0 - None

AGE OF SERVICE
(27) YEAR BUILT:

1969

(106) YEAR RECONSTRUCTED:

1988

(42) TYPE OF SERVICE:

(28) LANES:
A) ON BRIDGE:

02

B) UNDER BRIDGE:

00

(29) AVERAGE DAILY TRAFFIC: 017470

A) ON BRIDGE:

1 - Highway

B) UNDER BRIDGE:

5 - Waterway

(30) YEAR OF AVERAGE DAILY


TRAFFIC:
(109) AVERAGE DAILY TRUCK
TRAFFIC:
(19) BYPASS DETOUR LENGTH:

Page 5 of 21

2010
37

001

MI

Inspector: Matt Ference

Asset Name:

Inspection Date: 05/19/2015

Facility Carried:

I65-175-05541
BNBL
I-65 NBL

Bridge Inspection Report

GEOMETRIC DATA
(48) LENGTH OF MAX SPAN:

0085.0

(35) STRUCTURE FLARED:

0 - No flare

(49) STRUCTURE LENGTH:

00394.0 FT

(10) INV RTE, MIN VERT


CLEARANCE:

99.99 FT

(47) TOT HORIZ CLEARANCE:

040.0 FT

(53) VERT CLEAR OVER BR RDWY:


(54) MIN VERTICAL
UNDERCLEARANCE:
A) REFERENCE FEATURE:
B) MIN VERT UNDERCLEAR:
(55) LATERAL UNDERCLEARANCE
RIGHT:
A) REFERENCE FEATURE:
B) MIN LATERAL UNDERCLEAR:

99.99 FT

DEG

(56) MIN LATERAL UNDERCLEAR


ON LEFT:

00.0

05/19/2015

(91) DESIGNATED INSPECTION


FREQUENCY:
(93) CRITICAL FEATURE
INSPECTION DATE:
A) FRACTURE CRITICAL DATE:

12 MONTHS

FT

(50) CURB/SIDEWALK WIDTHS:


A) LEFT

00.0

FT

B) RIGHT:

00.0

FT

040.0

FT

(51) BRDG RDWY WIDTH


CURB-TO-CURB:

(52) DECK WIDTH, OUT-TO-OUT: 043.0

FT

(32) APPROACH ROADWAY

038.0

FT

(33) BRIDGE MEDIAN:

0 - No median

(34) SKEW:

10

N
0

FT

N
000.0 FT
FT

INSPECTIONS
(90) INSPECTION DATE:
(92) CRITICAL FEATURE
INSPECTION:
A) FRACTURE CRITICAL
REQUIRED/FREQUENCY:

B) UNDERWATER INSPECTION
REQUIRED/FREQUENCY:
C) OTHER SPECIAL INSPECTION
REQUIRED/FREQUENCY:

Y 60

B) UNDERWATER INSP DATE:

05/03/2012

C) OTHER SPECIAL INSP DATE:

08/01/1995

CONDITION
(58) DECK:

6 - Satisfactory
Condition (minor
deterioration)

(60) SUBSTRUCTURE:

4 - Poor Condition
(advanced
deterioration)

(58.01) WEARING SURFACE:

5 - Fair Condition

(59) SUPERSTRUCTURE:

5 - Fair Condition
(minor section loss)

(61) CHANNEL/CHANNEL
PROTECTION:

5 - Bank eroded..
major damage

(62) CULVERTS:

N - Not Applicable

CONDITION COMMENTS
(58) DECK:

6 - Satisfactory Condition (minor deterioration)

Comments:
There are longitudinal and transverse cracks with white efflorescence in all spans. There are a few small spalls with no exposed
reinforcement throughout the deck underside (Matt Ference, 05-19-2015).

(58.01) WEARING SURFACE: 5 - Fair Condition


Comments:
I measured 505 ft^2 of patching & 10 ft^2 of spalling. There are transverse cracks, longitudinal cracks, and map cracks throughout
the wearing surface (Matt Ference, 05-19-2015).

Page 6 of 21

Inspector: Matt Ference

Asset Name:

Inspection Date: 05/19/2015

Facility Carried:

I65-175-05541
BNBL
I-65 NBL

Bridge Inspection Report

(59) SUPERSTRUCTURE:

5 - Fair Condition (minor section loss)

Comments:
All 6 of the steel beams in span E have minor section loss near the bent 6. In span A, beams 1 and 6 have minor section loss near bent
1. All of the steel beams and steel diaphragms light to moderate rust throughout all of the spans (Matt Ference, 05-19-2015).

(60) SUBSTRUCTURE:

4 - Poor Condition (advanced deterioration)

Comments:
There is undermining at the east end of bent 6, but no piles are exposed. In old reports it is documented that there has been settlement
at pier 3 which has caused an extreme tilt to the rocker bearings. The bearings are still in placed and tilted (Matt Ference,
05-19-2015).

(61) CHANNEL/CHANNEL
PROTECTION

5 - Bank eroded.. major damage

Comments:
There is approximately 300 ft^3 of debris at the east end of pier 4. There is erosion on both banks of the channel both upstream and
downstream from the bridge (Matt Ference, 05-19-2015).

(62) CULVERTS:

N - Not Applicable

Comments:

LOAD RATING AND POSTING


(31) DESIGN LOAD:

6 - HS 20+Mod

(66) INVENTORY RATING:

(70) BRIDGE POSTING

5 - Equal to or above
legal loads

(65) INVENTORY RATING METHOD: 1 - Load Factor (LF)

(41) STRUCTURE
OPEN/POSTED/CLOSED:

A - Open

(66D) DATE POSTED/CLOSED:

(64) OPERATING RATING:

74

(63) OPERATING RATING


METHOD:

1 - Load Factor (LF)

(66B) INVENTORY RATING (H):

44

25

APPRAISAL
SUFFICIENCY RATING:

68.6

STATUS:

(67) STRUCTURAL EVALUATION: 4

(36) TRAFFIC SAFETY FEATURE:


36A) BRIDGE RAILINGS:

36B) TRANSITIONS:

(68) DECK GEOMETRY:

36C) APPROACH GUARDRAIL:

(69) UNDERCLEARANCES,
VERTICAL & HORIZONTAL:

36D) APPROACH GUARDRAIL


ENDS:

(71) WATERWAY ADEQUACY:


Comments:

7 - Slight Chance of Overtopping Bridge

(72) APPROACH ROADWAY ALIGNMENT:


Comments:

8 - Equal to present desirable criteria

Page 7 of 21

Inspector: Matt Ference

Asset Name:

Inspection Date: 05/19/2015

Facility Carried:

I65-175-05541
BNBL
I-65 NBL

Bridge Inspection Report

(113) SCOUR CRITICAL BRIDGES:


5 - Scour within limits of footing or piles
Comments:
05/18/2007 Underwater Insp. - Timber debris at Pier 3 and 4. Scour depression at Pier 3.Coded as a '5'. This bridge is
considered as MODERATE Risk for Vulnerability for Scour. This is based on the foundations being set on Spread Footing, set
on Clay.
The 1969 Flow Line elv.
= 526.20'
The 2002 Flow Line elv.
= 526.70'
The 2007 Flow Line elv.
= 524.30'
The Q-100 Flow Line elv.
= 547.25'
The Q-100 Scour Depth elv. = 503.70'
A Scour Calculation Letter, (dated: 6/2

CLASSIFICATION
(20) TOLL:

3 - On Free Road

(22) OWNER:

01 - State Highway
Agency

(21) MAINT. RESPONSIBILITY:

01 - State Highway
Agency

(26) FUNCTIONAL CLASS OF


INVENTORY RTE:

11 - Urban - Principal
Arterial - Interstate

(100) STRAHNET HIGHWAY:


(102) DIRECTION OF TRAFFIC:

Is on an Interstate
STRAHNET route
1-way traffic
1 - Structure/Route is on
NHS

(37) HISTORICAL SIGNIFICANCE: 5 - Not eligible


(101) PARALLEL STRUCTURE:
(103) TEMPORARY STRUCTURE:

R - Right structure
(North or East)

(105) FEDERAL LANDS


HIGHWAYS:

0-Not Applicable

(104) HIGHWAY SYSTEM OF


INVENTORY ROUTE:

(112) NBIS BRIDGE LENGTH:

Yes

(110) DESIGNATED NATIONAL Inventory route on


NETWORK:
National Truck Network

NAVIGATION DATA
(38) NAVIGATION CONTROL:

0 - No navigation
control on waterway
(bridge permit not
required)

(111) PIER OR ABUTMENT


PROTECTION:

(39) NAVIGATION VERTICAL CLEAR: 000.0

FT

(116) MINIMUM NAVIGATION VERT.


CLEARANCE, VERT. LIFT BRIDGE:

FT

(40) NAV HORIZONTAL CLEARANCE: 0000.0 FT

PROPOSED IMPROVEMENTS
(75A) TYPE OF WORK:

37 - Deck Replacement Some Widening

(95) ROADWAY IMPROVEMENT COST: $ 000000

(75B) WORK DONE BY:

1 - Work to be done by
contract

(96) TOTAL PROJECT COST:

$ 002122

(97) YR OF IMPROVEMENT COST EST: 2013

(76) LENGTH OF IMPROVEMENT: 000394 FT

(114) FUTURE AVG DAILY TRAFFIC:

034800

(94) BRIDGE IMPROVEMENT


COST:

(115) YR OF FUTURE ADT:

2030

$ 002122

Page 8 of 21

Inspector: Matt Ference

Asset Name:

Inspection Date: 05/19/2015

Facility Carried:

I65-175-05541
BNBL
I-65 NBL

Bridge Inspection Report

12 - Reinforced Concrete Deck

Environment

Total
Quantity

Units

2 - Low

17028

sq. ft.

Condition Condition Condition Condition


State 1
State 2
State 3
State 4
16202

430

396

The deck underside has many areas with cracking and white
efflorescence leaching through. The deck wearing surface has many
patches and a few spalls. Most of the patches are in good condition
(Matt Ference, 05-19-2015).
510 - Wearing Surfaces

107 - Steel Open Girder/Beam

2 - Low

15840

sq. ft.

15265

505

70

2340

ft.

1536

768

36

Beam lines 1 and 6 in all of the spans has medium to heavy rusting
with little to section loss. All 6 of the beam ends at bent 6 has heavy
rusting with some section loss (Matt Ference, 05-19-2015).
515 - Steel Protective Coating

210 - Reinforced Concrete Pier Wall


215 - Reinforced Concrete Abutment
234 - Reinforced Concrete Pier Cap
300 - Strip Seal Expansion Joint
302 - Compression Joint Seal
311 - Movable Bearing
313 - Fixed Bearing
321 - Reinforced Concrete Approach Slab

20513

sq. ft.

17700

2485

2 - Low

106

ft.

104

2 - Low

85

ft.

75

2 - Low

173

ft.

165

2 - Low

44

ft.

2 - Low

44

ft.

2 - Low

30

each

23

2 - Low

each

2 - Low

1086

sq. ft.

1005

328

44
44
1

51

30

The south approach slab has approximately 12 ft^2 of patching and


the north approach slab has approximately 47 ft^2 of patching. There
are wide transverse cracks in both approach slabs spaced greater
than 3' apart (Matt Ference, 05-19-2015).

331 - Reinforced Concrete Bridge Railing

2 - Low

792

Page 9 of 21

ft.

792

Inspector: Matt Ference

Asset Name:

Inspection Date: 05/19/2015

Facility Carried:
Bridge Inspection Report

PHOTO 1
Description

(05-19-2015) str# I65-175-05541 BNBL, Approach slab at the north end of the bridge looking
northwest

PHOTO 2
Description

(05-19-2015) str# I65-175-05541 BNBL, Approach slab at the south end of the bridge looking
southwest

Page 10 of 21

I65-175-05541
BNBL
I-65 NBL

Inspector: Matt Ference

Asset Name:

Inspection Date: 05/19/2015

Facility Carried:
Bridge Inspection Report

PHOTO 3
Description

(05-19-2015) str# I65-175-05541 BNBL, Bent 1 backwall in span A looking southeast

PHOTO 4
Description

(05-19-2015) str# I65-175-05541 BNBL, Bent 6 backwall in span E looking northeast

Page 11 of 21

I65-175-05541
BNBL
I-65 NBL

Inspector: Matt Ference

Asset Name:

Inspection Date: 05/19/2015

Facility Carried:
Bridge Inspection Report

PHOTO 5
Description

(05-19-2015) str# I65-175-05541 BNBL, Debris at pier 4 in span D looking east

PHOTO 6
Description

(05-19-2015) str# I65-175-05541 BNBL, Debris at pier 4 in span D looking southeast

Page 12 of 21

I65-175-05541
BNBL
I-65 NBL

Inspector: Matt Ference

Asset Name:

Inspection Date: 05/19/2015

Facility Carried:
Bridge Inspection Report

PHOTO 7
Description

(05-19-2015) str# I65-175-05541 BNBL, Deck underside in span A looking south

PHOTO 8
Description

(05-19-2015) str# I65-175-05541 BNBL, Deck underside in span B looking north

Page 13 of 21

I65-175-05541
BNBL
I-65 NBL

Inspector: Matt Ference

Asset Name:

Inspection Date: 05/19/2015

Facility Carried:
Bridge Inspection Report

PHOTO 9
Description

(05-19-2015) str# I65-175-05541 BNBL, Deck underside in span C looking southwest

PHOTO 10
Description

(05-19-2015) str# I65-175-05541 BNBL, Deck underside in span D looking south

Page 14 of 21

I65-175-05541
BNBL
I-65 NBL

Inspector: Matt Ference

Asset Name:

Inspection Date: 05/19/2015

Facility Carried:
Bridge Inspection Report

PHOTO 11
Description

(05-19-2015) str# I65-175-05541 BNBL, Deck underside in span E looking north

PHOTO 12
Description

(05-19-2015) str# I65-175-05541 BNBL, Deck wearing surface cracking looking west typical

Page 15 of 21

I65-175-05541
BNBL
I-65 NBL

Inspector: Matt Ference

Asset Name:

Inspection Date: 05/19/2015

Facility Carried:
Bridge Inspection Report

PHOTO 13
Description

(05-19-2015) str# I65-175-05541 BNBL, Deck wearing surface looking north pic 1

PHOTO 14
Description

(05-19-2015) str# I65-175-05541 BNBL, Deck wearing surface looking north pic 2

Page 16 of 21

I65-175-05541
BNBL
I-65 NBL

Inspector: Matt Ference

Asset Name:

Inspection Date: 05/19/2015

Facility Carried:
Bridge Inspection Report

PHOTO 15
Description

(05-19-2015) str# I65-175-05541 BNBL, Diaphragm at bent 6 in span E looking north

PHOTO 16
Description

(05-19-2015) str# I65-175-05541 BNBL, Erosion at bent 6 in span E looking northeast

Page 17 of 21

I65-175-05541
BNBL
I-65 NBL

Inspector: Matt Ference

Asset Name:

Inspection Date: 05/19/2015

Facility Carried:
Bridge Inspection Report

PHOTO 17
Description

(05-19-2015) str# I65-175-05541 BNBL, North alignment looking north

PHOTO 18
Description

(05-19-2015) str# I65-175-05541 BNBL, Outter beam line in span A looking south

Page 18 of 21

I65-175-05541
BNBL
I-65 NBL

Inspector: Matt Ference

Asset Name:

Inspection Date: 05/19/2015

Facility Carried:
Bridge Inspection Report

PHOTO 19
Description

(05-19-2015) str# I65-175-05541 BNBL, Pier 3 in span B looking north

PHOTO 20
Description

(05-19-2015) str# I65-175-05541 BNBL, Pier 3 in span C looking southwest

Page 19 of 21

I65-175-05541
BNBL
I-65 NBL

Inspector: Matt Ference

Asset Name:

Inspection Date: 05/19/2015

Facility Carried:

I65-175-05541
BNBL
I-65 NBL

Bridge Inspection Report

PHOTO 21
Description

(05-19-2015) str# I65-175-05541 BNBL, Spall in the deck wearing surface looking west

PHOTO 22
Description

(05-19-2015) str# I65-175-05541 BNBL, Transverse joint at the north end of the bridge looking
west

Page 20 of 21

Inspector: Matt Ference

Asset Name:

Inspection Date: 05/19/2015

Facility Carried:

I65-175-05541
BNBL
I-65 NBL

Bridge Inspection Report

PHOTO 23
Description

(05-19-2015) str# I65-175-05541 BNBL, Transverse joint at the south end of the bridge looking
west

PHOTO 24
Description

(05-19-2015) str# I65-175-05541 BNBL, West profile looking north

Page 21 of 21