Sie sind auf Seite 1von 10

Dynamically Balanced Tank

BHA

01/2011/A

Win 7

PROJECT: jkl2

SUB: blaj2

Scale 1 : 125
30

11.00

14.3

40.0

50.0 kN/m2

30

45

5.45
5.00

Gamma = 10.0 kN/m3

3.00

8.75
11.75

geometry of tank
material: C 30/37 BSt 500 S(A)
-------------------------------------------------------------------ground plate d = 0.30 m
radius R = 8.75 m
foundation
d = 0.45 m
radius Ri = 8.75 m
radius Ra = 11.75 m
cylinder
d = 0.30 m
radius R = 11.15 m
height H = 5.00 m
eccentricity

groundplate /foundation

0.07 m

support of cylinder:
horizontal
twisting
-------------------------------------------------------------------cylinder head:
free
free
cylinder base:
fix
fix
material
-------------------------------------------------------------------soil
: bedding
C
= 40000.0
kN/m3
tank
: E -modulus
E
=
2827.5
kN/cm2
Poisson's ratio Nue =
0.200
REQUIREMENTS OF DURABILITY:
-------------------------------------------------------------------inside
outside
attack on reinforc. : XC2
XC2
attack on concrete : X0
X0
min. concrete class : C 16/20
C 16/20
long. reinforcement : ds
= 10.0 mm
ds
= 12.0 mm
Reproaching measure
:
c
= 1.5 cm
c
= 1.5 cm
reduced cmin
: Bk>MinBk+2 Fk
Bk>MinBk+2 Fk
longitudinal bars
: cmin,L = 1.5 cm
cmin,L = 1.5 cm
concrete coverage
: cnom,L = 3.0 cm
cnom,L = 3.0 cm
laying dist. link
: cv
> = 3.0 cm
cv
> = 3.0 cm
class of demand
: A userdefined
A userdefined
all. crack width
: wk
= 0.20 mm
wk
= 0.20 mm
CREEP COEFFICIENT AND SHRINKAGE STRAIN
-------------------------------------------------------------------air moisture
LU
=
60 %
cement 32.5R;42.5
load age
t0
=
28 days
t= infinitely
modulus of creep
(t0,t) = 1.87
shrinkage strain
cs(t) = -0.54 o/oo
Die Informationen zu den Expositionsklassen werden vom
Programm derzeit nicht weiter verarbeitet.

Dynamically Balanced Tank

BHA

01/2011/A

PROJECT: jkl2

Win 7
SUB: blaj2

reinforcement layer
-------------------------------------------------------------------plate
ring top
d = 4.0 cm
radial
top
d = 4.0 cm
below d = 4.0 cm
below d = 4.0 cm
foundation

ring top
d = 4.0 cm
below d = 4.0 cm

radial

cylinder

ring

vertical outs. d = 4.0 cm


inside d = 4.0 cm

inside d = 4.0 cm
outs. d = 4.0 cm

top
d = 4.0 cm
below d = 4.0 cm

Dynamically Balanced Tank

BHA

01/2011/A

Win 7

PROJECT: jkl2

SUB: blaj2

forces, moments lc no. 1


Gamma =

25.00 kN/m3

dead load + loads on top of cylinder


,

vertical
V
horisontal H
moment
M

=
=
=

10.00 kN/m
5.00 kN/m
-2.00 kNm/m

B o d e n p l a t t e
R
M-Ra
M-Ri
Q-Ra
N-Ra
N-Ri Pressure
(m)
(kNm/m)
(kNm/m)
(kN/m)
(kN/m)
(kN/m)
(kN/m2)
-------------------------------------------------------------------0.00
0.11
0.11
0.00
-14.10
-14.10
7.7
0.88
0.15
0.13
0.10
-14.10
-14.10
7.7
1.75
0.24
0.18
0.17
-14.10
-14.10
7.6
2.63
0.36
0.24
0.15
-14.10
-14.10
7.5
3.50
0.39
0.29
-0.04
-14.10
-14.10
7.1
4.38
0.16
0.25
-0.51
-14.10
-14.10
6.7
5.25
-0.57
0.04
-1.33
-14.10
-14.10
6.1
6.13
-2.02
-0.44
-2.37
-14.10
-14.10
5.9
7.00
-4.18
-1.23
-3.14
-14.10
-14.10
6.7
7.88
-6.39
-2.19
-2.52
-14.10
-14.10
9.3
8.75
-6.78
-2.81
1.33
-14.10
-14.10
14.8
f o u n d a t i o n

radial

ring

R
M-Ra
M-Ri
Q-Ra
N-Ra
N-Ri Pressure
(m)
(kNm/m)
(kNm/m)
(kN/m)
(kN/m)
(kN/m)
(kN/m2)
-------------------------------------------------------------------8.75
-7.76
-6.45
1.33
-14.10
0.58
14.8
9.05
-7.14
-6.37
2.69
-13.62
0.10
17.2
9.35
-6.03
-6.16
4.74
-13.18
-0.33
19.8
9.65
-4.24
-5.77
7.49
-12.79
-0.72
22.4
9.95
-1.57
-5.15
10.95
-12.43
-1.08
25.1
10.25
2.18
-4.22
15.12
-12.10
-1.41
27.7
10.55
7.19
-2.94
19.96
-11.81
-1.71
30.4
10.85
13.64
-1.23
25.44
-11.53
-1.99
32.9
11.15
21.68
0.96
31.50
-11.28
-2.24
35.1
11.15
21.68
0.96
31.50
-11.28
-2.24
35.1
11.45
5.12
-2.35
-16.00
0.00
0.02
35.1
11.75
1.33
-2.93
-8.20
0.00
0.02
37.2
c y l i n d e r

vertical

ring

radial

Z
M-Ve
M-Ri
Q-Ve
N-Ve
N-Ri
V-Ra
(m)
(kNm/m)
(kNm/m)
(kN/m)
(kN/m)
(kN/m)
(mm)
-------------------------------------------------------------------0.00
16.56
3.31
-11.28
-47.50
-9.49
0.000
0.50
11.02
2.20
-10.51
-43.75
36.94
0.060
1.00
6.26
1.25
-8.44
-40.00
51.54
0.078
1.50
2.62
0.52
-6.16
-36.25
47.90
0.072
2.00
0.03
0.01
-4.26
-32.50
36.50
0.057
2.50
-1.73
-0.35
-2.89
-28.75
24.79
0.040
3.00
-2.93
-0.59
-1.96
-25.00
17.92
0.030
3.50
-3.71
-0.74
-1.16
-21.25
19.36
0.031
4.00
-4.04
-0.81
-0.06
-17.50
31.34
0.046
4.50
-3.64
-0.73
1.82
-13.75
54.75
0.076
5.00
-2.00
-0.40
5.00
-10.00
88.32
0.119
deflection

top

V-Ra =

0.11872 mm

Phi =

-0.09639 mm/m

Dynamically Balanced Tank

BHA

01/2011/A

Win 7

PROJECT: jkl2

SUB: blaj2

forces, moments lc no. 2


loadheight

5.00 m

internal pressure
,

Gamma =

10.00 kN/m3

B o d e n p l a t t e
R
M-Ra
M-Ri
Q-Ra
N-Ra
N-Ri Pressure
(m)
(kNm/m)
(kNm/m)
(kN/m)
(kN/m)
(kN/m)
(kN/m2)
-------------------------------------------------------------------0.00
-0.11
-0.11
0.00
51.13
51.13
49.9
0.88
-0.12
-0.12
-0.02
51.13
51.13
50.0
1.75
-0.14
-0.13
-0.02
51.13
51.13
50.0
2.63
-0.12
-0.13
0.06
51.13
51.13
50.2
3.50
-0.02
-0.10
0.23
51.13
51.13
50.3
4.38
0.26
0.00
0.50
51.13
51.13
50.5
5.25
0.77
0.19
0.83
51.13
51.13
50.5
6.13
1.48
0.48
1.02
51.13
51.13
50.2
7.00
2.13
0.80
0.68
51.13
51.13
49.2
7.88
2.03
0.96
-0.82
51.13
51.13
47.3
8.75
-0.03
0.60
-4.14
51.13
51.13
44.5
f o u n d a t i o n

radial

ring

R
M-Ra
M-Ri
Q-Ra
N-Ra
N-Ri Pressure
(m)
(kNm/m)
(kNm/m)
(kN/m)
(kN/m)
(kN/m)
(kN/m2)
-------------------------------------------------------------------8.75
3.55
2.75
-4.14
51.13
63.13
44.5
9.05
2.06
2.46
-5.76
51.52
62.74
43.5
9.35
0.09
2.02
-7.65
51.88
62.39
42.5
9.65
-2.43
1.41
-9.79
52.20
62.07
41.4
9.95
-5.56
0.60
-12.18
52.49
61.77
40.4
10.25
-9.38
-0.43
-14.79
52.76
61.51
39.5
10.55
-13.93
-1.70
-17.57
53.01
61.26
38.8
10.85
-19.24
-3.24
-20.48
53.23
61.04
38.3
11.15
-25.33
-5.05
-23.44
53.44
60.83
38.1
11.15
-25.33
-5.05
-23.44
53.44
60.83
38.1
11.45
7.06
1.43
-23.44
-2.60
49.62
38.1
11.75
1.73
0.46
-11.55
-1.25
48.27
38.0
c y l i n d e r

vertical

ring

radial

Z
M-Ve
M-Ri
Q-Ve
N-Ve
N-Ri
V-Ra
(m)
(kNm/m)
(kNm/m)
(kN/m)
(kN/m)
(kN/m)
(mm)
-------------------------------------------------------------------0.00
-32.39
-6.48
56.04
0.00
33.43
0.044
0.50
-9.97
-1.99
34.34
0.00
67.56
0.089
1.00
2.78
0.56
17.54
0.00
132.62
0.174
1.50
8.48
1.70
6.13
0.00
191.40
0.252
2.00
9.68
1.94
-0.64
0.00
226.91
0.298
2.50
8.42
1.68
-3.93
0.00
235.23
0.309
3.00
6.13
1.23
-4.91
0.00
219.64
0.289
3.50
3.74
0.75
-4.50
0.00
186.47
0.245
4.00
1.76
0.35
-3.34
0.00
142.47
0.187
4.50
0.46
0.09
-1.80
0.00
93.27
0.123
5.00
0.00
0.00
0.00
0.00
42.55
0.056
deflection

top

V-Ra =

0.05593 mm

Phi =

0.13363 mm/m

Dynamically Balanced Tank

BHA

01/2011/A

Win 7

PROJECT: jkl2

SUB: blaj2

forces, moments lc no. 3


loadheight

2.30 m

external pressure
,

B o d e n p l a t t e

p top
=
p below =
p found.=

14.30 kN/m2
40.00 kN/m2
58.00 kN/m2

R
M-Ra
M-Ri
Q-Ra
N-Ra
N-Ri Pressure
(m)
(kNm/m)
(kNm/m)
(kN/m)
(kN/m)
(kN/m)
(kN/m2)
-------------------------------------------------------------------0.00
0.08
0.08
0.00
-42.68
-42.68
0.1
0.88
0.10
0.09
0.05
-42.68
-42.68
0.1
1.75
0.15
0.12
0.09
-42.68
-42.68
0.1
2.63
0.20
0.15
0.06
-42.68
-42.68
-0.1
3.50
0.19
0.16
-0.07
-42.68
-42.68
-0.3
4.38
0.02
0.12
-0.36
-42.68
-42.68
-0.5
5.25
-0.45
-0.02
-0.83
-42.68
-42.68
-0.8
6.13
-1.32
-0.32
-1.38
-42.68
-42.68
-0.8
7.00
-2.51
-0.78
-1.68
-42.68
-42.68
-0.2
7.88
-3.56
-1.28
-1.04
-42.68
-42.68
1.5
8.75
-3.28
-1.50
1.59
-42.68
-42.68
4.8
f o u n d a t i o n

radial

ring

R
M-Ra
M-Ri
Q-Ra
N-Ra
N-Ri Pressure
(m)
(kNm/m)
(kNm/m)
(kN/m)
(kN/m)
(kN/m)
(kN/m2)
-------------------------------------------------------------------8.75
-6.26
-4.09
1.59
-42.68
-47.98
4.8
9.05
-5.50
-4.01
3.15
-42.85
-47.81
6.2
9.35
-4.24
-3.80
5.11
-43.01
-47.65
7.7
9.65
-2.37
-3.42
7.45
-43.15
-47.51
9.3
9.95
0.21
-2.83
10.21
-43.28
-47.38
10.9
10.25
3.60
-2.00
13.36
-43.40
-47.26
12.5
10.55
7.93
-0.88
16.89
-43.51
-47.15
14.0
10.85
13.27
0.54
20.76
-43.61
-47.05
15.3
11.15
19.70
2.32
24.92
-43.70
-46.96
16.5
11.15
19.70
2.32
24.92
-43.70
-46.96
16.5
11.45
-7.36
-3.09
24.92
1.98
-37.83
16.5
11.75
-1.77
-2.03
12.13
0.95
-36.80
17.5
c y l i n d e r

vertical

ring

radial

Z
M-Ve
M-Ri
Q-Ve
N-Ve
N-Ri
V-Ra
(m)
(kNm/m)
(kNm/m)
(kN/m)
(kN/m)
(kN/m)
(mm)
-------------------------------------------------------------------0.00
27.06
5.41
-45.68
0.00
-25.48
-0.033
0.50
8.77
1.75
-27.97
0.00
-22.51
-0.030
1.00
-1.48
-0.30
-13.68
0.00
-46.62
-0.061
1.50
-5.56
-1.11
-3.27
0.00
-67.95
-0.089
2.00
-5.33
-1.07
3.70
0.00
-74.33
-0.098
2.50
-2.59
-0.52
5.30
0.00
-66.07
-0.087
3.00
-0.63
-0.13
2.68
0.00
-50.07
-0.066
3.50
0.22
0.04
0.84
0.00
-32.01
-0.042
4.00
0.35
0.07
-0.20
0.00
-14.40
-0.019
4.50
0.15
0.03
-0.47
0.00
2.29
0.003
5.00
0.00
0.00
0.00
0.00
18.55
0.024
deflection

top

V-Ra =

0.02439 mm

Phi =

-0.04264 mm/m

Dynamically Balanced Tank

BHA

01/2011/A

Win 7

PROJECT: jkl2

SUB: blaj2

forces, moments lc no. 4


loadheight

5.00 m

homogenous temperature
,

B o d e n p l a t t e

T top
=
T below =
T found.=

40.00 degree
40.00 degree
25.00 degree

R
M-Ra
M-Ri
Q-Ra
N-Ra
N-Ri Pressure
(m)
(kNm/m)
(kNm/m)
(kN/m)
(kN/m)
(kN/m)
(kN/m2)
-------------------------------------------------------------------0.00
-0.31
-0.31
0.00
101.48
101.48
0.3
0.88
-0.26
-0.28
0.16
101.48
101.48
0.4
1.75
-0.06
-0.19
0.39
101.48
101.48
0.5
2.63
0.33
-0.01
0.72
101.48
101.48
0.7
3.50
0.98
0.29
1.09
101.48
101.48
0.7
4.38
1.84
0.71
1.26
101.48
101.48
0.2
5.25
2.56
1.14
0.76
101.48
101.48
-1.1
6.13
2.33
1.33
-1.12
101.48
101.48
-3.4
7.00
-0.26
0.84
-5.14
101.48
101.48
-6.7
7.88
-6.99
-0.96
-11.45
101.48
101.48
-9.6
8.75
-19.10
-4.64
-18.47
101.48
101.48
-9.1
f o u n d a t i o n

radial

ring

R
M-Ra
M-Ri
Q-Ra
N-Ra
N-Ri Pressure
(m)
(kNm/m)
(kNm/m)
(kN/m)
(kN/m)
(kN/m)
(kN/m2)
-------------------------------------------------------------------8.75
-12.00
-5.15
-18.47
101.48
153.48
-9.1
9.05
-17.53
-6.61
-20.32
103.17
151.78
-7.6
9.35
-23.42
-8.30
-21.66
104.71
150.25
-5.9
9.65
-29.50
-10.17
-22.43
106.10
148.85
-3.8
9.95
-35.61
-12.18
-22.51
107.37
147.58
-1.3
10.25
-41.52
-14.26
-21.78
108.53
146.42
1.9
10.55
-46.99
-16.36
-20.07
109.59
145.36
5.6
10.85
-51.71
-18.38
-17.21
110.57
144.39
10.1
11.15
-55.34
-20.23
-12.99
111.46
143.49
15.4
11.15
-55.34
-20.23
-12.99
111.46
143.49
15.4
11.45
4.74
-8.22
-12.99
-6.28
119.94
15.4
11.75
1.36
-8.53
-7.25
-3.02
116.68
21.0
c y l i n d e r

vertical

ring

radial

Z
M-Ve
M-Ri
Q-Ve
N-Ve
N-Ri
V-Ra
(m)
(kNm/m)
(kNm/m)
(kN/m)
(kN/m)
(kN/m)
(mm)
-------------------------------------------------------------------0.00
-60.08
-12.02
117.75
0.00 -1191.58
2.894
0.50
-13.76
-2.75
69.37
0.00
-949.43
3.212
1.00
11.36
2.27
33.23
0.00
-662.72
3.589
1.50
21.55
4.31
9.48
0.00
-405.03
3.928
2.00
22.55
4.51
-4.00
0.00
-207.02
4.188
2.50
18.79
3.76
-10.04
0.00
-72.61
4.365
3.00
13.30
2.66
-11.31
0.00
8.28
4.471
3.50
7.92
1.58
-9.87
0.00
50.97
4.527
4.00
3.65
0.73
-7.09
0.00
70.65
4.553
4.50
0.93
0.19
-3.70
0.00
79.49
4.564
5.00
0.00
0.00
0.00
0.00
85.22
4.572
deflection

top

V-Ra =

4.57202 mm

Phi =

-0.01447 mm/m

Dynamically Balanced Tank

BHA

01/2011/A

Win 7

PROJECT: jkl2

SUB: blaj2

forces, moments lc no. 5


loadheight

5.00 m

inhomogenous temperature
,

B o d e n p l a t t e

T top
= -15.00 degree
T below = -10.00 degree
T found.= -15.00 degree

R
M-Ra
M-Ri
Q-Ra
N-Ra
N-Ri Pressure
(m)
(kNm/m)
(kNm/m)
(kN/m)
(kN/m)
(kN/m)
(kN/m2)
-------------------------------------------------------------------0.00
-39.60
-39.60
0.00
27.32
27.32
0.1
0.88
-39.59
-39.59
0.03
27.32
27.32
0.0
1.75
-39.57
-39.58
0.01
27.32
27.32
-0.1
2.63
-39.61
-39.59
-0.10
27.32
27.32
-0.2
3.50
-39.77
-39.64
-0.34
27.32
27.32
-0.5
4.38
-40.17
-39.79
-0.72
27.32
27.32
-0.7
5.25
-40.88
-40.06
-1.15
27.32
27.32
-0.7
6.13
-41.84
-40.45
-1.34
27.32
27.32
-0.1
7.00
-42.62
-40.86
-0.75
27.32
27.32
1.3
7.88
-42.26
-41.02
1.47
27.32
27.32
4.0
8.75
-39.10
-40.42
6.16
27.32
27.32
7.7
f o u n d a t i o n

radial

ring

R
M-Ra
M-Ri
Q-Ra
N-Ra
N-Ri Pressure
(m)
(kNm/m)
(kNm/m)
(kN/m)
(kN/m)
(kN/m)
(kN/m2)
-------------------------------------------------------------------8.75
-37.19
-81.66
6.16
27.32
49.24
7.7
9.05
-36.49
-79.75
8.37
28.03
48.53
8.5
9.35
-35.04
-77.78
10.64
28.68
47.88
8.5
9.65
-32.87
-75.73
12.73
29.27
47.29
7.7
9.95
-30.11
-73.59
14.38
29.80
46.76
5.9
10.25
-26.94
-71.39
15.33
30.29
46.27
3.2
10.55
-23.61
-69.16
15.32
30.74
45.82
-0.5
10.85
-20.46
-66.98
14.08
31.15
45.41
-5.2
11.15
-17.89
-64.94
11.33
31.53
45.03
-11.0
11.15
-17.89
-64.94
11.33
31.53
45.03
-11.0
11.45
-0.71
-61.50
11.33
-2.01
38.32
-11.0
11.75
0.45
-59.35
6.75
-0.96
37.28
-18.1
c y l i n d e r

vertical

ring

radial

Z
M-Ve
M-Ri
Q-Ve
N-Ve
N-Ri
V-Ra
(m)
(kNm/m)
(kNm/m)
(kN/m)
(kN/m)
(kN/m)
(mm)
-------------------------------------------------------------------0.00
-17.18
17.77
33.53
0.00
25.82
0.034
0.50
-0.77
22.11
31.02
0.00
-120.56
-0.158
1.00
13.10
25.95
23.95
0.00
-184.24
-0.242
1.50
22.92
28.97
15.20
0.00
-200.83
-0.264
2.00
28.27
31.10
6.28
0.00
-194.64
-0.256
2.50
29.28
32.36
-2.10
0.00
-177.25
-0.233
3.00
26.34
32.84
-9.45
0.00
-147.86
-0.194
3.50
20.13
32.65
-15.00
0.00
-94.39
-0.124
4.00
11.89
32.07
-17.24
0.00
4.51
0.006
4.50
3.88
31.53
-13.52
0.00
175.74
0.231
5.00
0.00
31.81
0.00
0.00
445.19
0.585
deflection

top

V-Ra =

0.58519 mm

Phi =

-0.85399 mm/m

Dynamically Balanced Tank

BHA

01/2011/A

Win 7

PROJECT: jkl2

SUB: blaj2

Actions:
No Cl Name
0
1
2

-------------------------------------------------------------------g
Dead loads
1.00 1.00 1.00 1.35
L 5 Temperature (non-fire)
0.60 0.50 0.00 1.50
N 8 Unusual loads
0.80 0.70 0.50 1.50
BEMESSUNG: DIN 1045-1:2001
Mindestbewehrung im Zylinder nach
erf as = 2.3 cm2/m
je Seite

DIN 1045-1

Mindestbewehrung im Fundament nach


DIN 1045-1
Mindestmomente
fctm = 2.90 N/mm2
Mcr = 97.76 kNm/m
erf as = 5.30 cm2/m
Mcr = 97.76 kNm/m
erf as = 5.30 cm2/m
Mindestbewehrung in der Bodenplatte nach
Mcr = 43.45 kNm/m
erf as = 3.71 cm2/m
Mcr = 43.45 kNm/m
erf as = 2.35 cm2/m

13.7.1
13.1.1 (1)

DIN 1045-1

13.1.1 (1)

superposition: decisive for dimensioning is superposition no.


-------------------------------------------------------------------no. 1
:
lc
1
5
no. 2
:
lc
1
4
ground plate:

radial direction

ring direction

R
Md
Nd as-ob as-un
Md
Nd as-ob as-un
(m)
(kNm/m)(kN/m)
(cm2/m)
(kNm/m)(kN/m)
(cm2/m)
-------------------------------------------------------------------0.00
-0.3
133
5.4
1.4
-0.3
133
5.4
1.4
0.88
-0.2
133
5.4
1.4
-0.3
133
5.4
1.4
1.75
0.2
133
5.4
1.5
0.0
133
5.4
1.4
2.63
1.0
133
5.3
1.5
0.3
133
5.4
1.5
3.50
2.0
133
5.4
1.6
0.8
133
5.4
1.5
4.38
3.0
133
5.4
1.7
1.4
133
5.4
1.6
5.25
3.1
133
5.6
1.8
1.8
133
5.4
1.6
6.13
0.8
133
5.9
1.5
1.4
133
5.5
1.6
7.00
-6.0
133
6.3
0.9
-0.4
133
5.7
1.4
7.88
-72.0
22
6.5
0.0
-4.4
133
5.8
1.0
8.75
-67.8
22
6.1
0.0
-10.7
133
5.8
0.4
foundation:

radial direction

ring direction

R
Md
Nd
as-ob as-un
Md
Nd
as-ob as-un
(m)
(kNm/m)(kN/m)
(cm2/m)
(kNm/m)(kN/m)
(cm2/m)
-------------------------------------------------------------------8.75
-28.5
133
7.4
0.0
-131.2
75
8.0
1.5
-16.4
231
9.05
-35.9
136
7.5
0.0
-18.5
228
8.9
1.4
9.35
-43.3
139
7.5
0.0
-20.8
225
8.9
1.2
9.65
-50.0
142
7.6
0.0
-23.0
222
8.8
1.1
9.95
-55.5
144
7.6
0.0
-25.2
220
8.8
0.9
10.25
-59.3
146
7.6
0.0
-27.1
218
8.8
0.8
10.55
-60.8
148
7.7
0.0
-28.5
216
8.7
0.7
10.85
-59.2
150
7.7
0.0
-29.2
214
8.7
0.6
11.15
-53.7
152
7.7
5.8
-29.1
212
8.7
0.6
2.4
32
11.15
-53.7
152
7.7
5.8
-29.1
212
8.7
0.6
2.4
32
11.45
14.0
-9
0.0
5.3
-15.5
180
8.2
1.0
11.75
3.8
-5
0.0
5.3
-16.8
175
8.1
0.9

Dynamically Balanced Tank

BHA

PROJECT: jkl2
cylinder :

01/2011/A

Win 7
SUB: blaj2

vertical direction

ring direction

Z
Md
Nd
as-in as-au
Md
Nd
as-in as-au
(m)
(kNm/m)(kN/m)
(cm2/m)
(kNm/m)(kN/m)
(cm2/m)
-------------------------------------------------------------------0.00
-67.8
-64
5.1
0.0
31.1
26
0.0
4.1
0.50
-5.8
-59
3.7
3.7
36.1 -131
0.0
3.7
13.7
-59
1.00
25.5
-54
0.0
3.7
40.6 -207
0.0
3.7
1.50
35.9
-49
0.0
3.7
44.2 -237
0.0
3.7
2.00
33.9
-44
0.0
3.7
46.7 -243
0.0
3.7
2.50
25.8
-39
0.0
3.7
5.2
-75
0.0
3.7
3.00
16.0
-34
0.0
3.7
3.2
37
0.1
4.3
3.50
6.9
-29
0.0
3.7
1.4
103
1.0
3.7
48.0 -115
4.00
12.4
-24
0.0
3.7
0.0
148
1.6
4.6
47.0
49
4.50
-3.5
-19
3.7
0.0
-0.7
193
2.2
9.0
46.3
338
5.00
-2.7
-14
3.7
0.0
47.2
787
3.9 16.1

Dynamically Balanced Tank


PROJECT: jkl2

BHA

01/2011/A

Win 7
SUB: blaj2

Das könnte Ihnen auch gefallen