Station
Location
Hub, Balochistan
Karachi, Sindh
Karachi, Sindh
Guddu, Kashmore,Sind
Jamshoro District,Sindh
Nasirabad District,Balochistan
Kabirwala, Punjab
Gujranwala, Punjab
Muzaffargarh, Punjab
Lalpir Limited
Muzaffargarh, Punjab
Sheikhupura, Punjab
Rawalpindi, Punjab
Ghotki, Sindh
Kabirwala, Punjab
Daharki, Sindh
Daharki, Sindh
Gul Ahmed
Karachi, Sindh
Sheikhupura, Punjab
Narowal, Punjab
Faisalabad, Punjab
Lahore, Punjab
Lahore, Punjab
Sahiwal, Punjab
Muridke, Sheikhupura
District, Punjab
Farooqabad,Sheikhupura, Punj
ab
Raiwind, Lahore
Karachi, Sindh
Quetta, Balochistan
Raiwind, Punjab
Lahore, Punjab
Jaranwala, Faisalabad,Punjab
Total Capacity
Location
Arifwala, Punjab
Karachi, Sindh
Tharparkar,Sindh
Sukkur, Sindh
Gadani,Balochistan
Gadani,Balochistan
Tharparkar,Sindh
Total Capacity
Power Stations
Capacity (
Notes
n or Proposed
Capacity (
Status
Under construction,[5] Gas-Thermal Power
404 Generation,[6] to be operational by December 2014.
152 Under construction, furnace oil combine cycle power plant, to be operational by October 20
134 Under construction, UAEs Al-Ghurair Group is setting up 134MW Gas-Thermal power projec
660 Under construction[9]
1200 Under construction[10]
120 Proposed, LOI issued.[11]
issued China
a Letter will
of Intent
to the
Proposed,
install
10Joint
coalVenture
powerof plants of 660MW each that will cost $14 billion.[1
6600 PPIB
M/s Al Mirqab Capital of Qatar and Sinohydro
Ciner
Group
of development
Turkey hasofagreed to immediately start work on a 660 MW power
Resources Ltd
of China
for the
660 Proposed,
2x660MW power coal-fired project at Port Qasim,
1320 Karachi.[14]
660 Proposed
11910 MW
Gas-Thermal power project, to be completed by July 2016 and expected to cost $100 million.[8]
In service
Station
Tarbela Dam
Ghazi-Barotha Hydropower Project
Mangla Dam
Warsak Dam
Chashma Barrage
Allai Khwar Hydropower Project
New Bong Escape
Khan Khwar Hydropower Project
Duber Khwar hydropower project
Jinnah hydropower project
Gomal Zam Dam
NeelumJhelum Hydropower Plant
Satpara Dam
Rasul Barrage Hydropower Project
Jabban (Malakand-I) Dam
Dargai (Malakand-II) Dam
Malakand-III Hydropower Project
Shadiwal Dam
Chichoki Malian Hydel Dam
Nandipur Dam
Naltar-I, Nalter-II Dams
Naltar-IV Dam
Kuram Garhi Dam
Renala Khurd HPP
Darawat Dam
Golen Gol project
Patrind Dam
Machai Dam
PAEC Chashma Hydel Dam
Kathai Dam
Kundal Shahi Dam
Leepa Dam
Jari Dam
Jagran-I Dam
Chitral Dam
Singul Dam
Pion Dam
Sermik Dam
Basho-I Dam
Tormik-I Dam
Haramosh Dam
Bubind Dam
Gilgit Dam
Skardu-I Dam
Skardu-II, III Dams
Chilas-I Dam
Hunza Dam
Shyok Dam
Astore Dam
Kachura-II Dam
Ghizar Dam
Thak Dam
Phandar Dam
Bordas Dam
Kharmang Dam
Yasin Dam
Bunnar Chilas Dam
Roundu Dam
Kar Gah-I, II, III, IV, V, VI, VII Dams
Hisper-I Dam
Naz Bar Dam
Jaglot-I, II Dams
Chalt Dam
Khyber-I, II Dams
Shigar Dam
Shirting Dam
Sher Qila Dam
Parishing/Louse
Darel-I,II Dams
Bunner Dam
Tangir Dam
Boladas-I Dam
Khunjerab Dam
Gol Dam
Harpo-I, Harchu, Dainyor, Gurikot, Kayo, Dango Da
Manthoka, Astore, Gulmit, Tolti-I, Khaplu-I, KachuraKhaibar-I, II, Mushki, Rattu, Misgar, Ghandus, Kiris-I
Tangir-I, Chillas-II, Hayul, Khaplu-I, Sumayar-I, Me
Jaglot Sai, Sermik-I, Olding-I, Thore, Minapin-I, Ahm
Jalalabad Dam
Hasanabad-I, II, III, IV, V Dams
Dumsum Dam
Balagond Dam
Ishkuman-I, II Dams
Reshun
Ashuran Dam
Thall Dam
Shishi, Karora, Kalam, Keyal, Kaghan, Duber, Jalkot
In service
Community
Capacity (MW)
3,478
1,450
1,120
Peshawar,Kabul River,KPK
243
184
121
84
72
130
96
17.4
969
Skardu,Satpara River
17.3
22
22
20
81
Gujrat District,Punjab
13.5
13.2
13.8
2.28
18
4
1.1
0.45
106
150
1.2
3.2
Neelam Valley,GB
Leepa Valley,Muzaffarabad,AJK
Chitral
Gilgit
30.4
1
1.2
Gah
Skardu
Skardu
Roundu Valley,GB
Gilgit
Astore
Gilgit
0.64
10.63
Skardu
6.96
Skardu
1.64
Chilas
5.62
Hunza Valley,GB
5.13
Shyok Valley,GB
4.85
Astore
3.11
Skardu
Ghizer District,GB
Chilas
Ghizer District,GB
Ghanche
Kharmang Valley, GB
1.89
Ghizer District,GB
1.61
Diamer District,GB
1.5
Roundu Valley,GB
1.52
Gilgit
13.34
Hunza Valley
Yasin Valley
Jaglot
1.32
Nagar Valley
Gilgit
Skardu
Skardu
Gilgit
Astore
Ghanche
1.11
1
1.2
Chilas
Chilas
Hunza Valley,GB
0.64
Gujrab River
0.59
Skardu
0.4
1.5
1.85
1.5
GB
Gilgit
Hunza Valley
Gah
1.5
Gah
1.5
Ishkuman
2.38
Chitral
4.5
0.4
0.4
2.1
Total Capacity
8,603
Capacity (MW)
969
106
148
4,500
128
4.2
14.4
16
4,320
26
120
4.4
840
83.4
5.8
1100
3600
100
Astore District,Gilgit-Baltistan
7,100[56]
Ghizer District,Gilgit-Baltistan
81
28
69
34.5
740
600
Katzarah,Gilgit-Baltistan
15,000
665
Kohistan, KPK
373
Kohistan, KPK
160
2,800
2,800
25.5
350
132
Chitral, KPK
80
Chitral, KPK
58
590
Chilas
Haveli District
Kotli District
Bhimber District
1.7
Hattian District
6.4
Kashmore,Sindh
33
640
650
53
130
Muzaffarabad,AJK,
500
48
115
Swat, KPK,Swat River
157
215
197
101
458
548
132
144
500
3.6
3000
520
2200
Skardu
1600
960
960
32
15
84
100
0.3
3.5
0.3
0.3
0.75
Ghabir River
0.15
0.2
54786.4
Operational since 1960. Dam completely silted up; Power generation byRun of the river. Extension is
Operational since 1971
Operational.[35]
Operational.[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Under
construction. 17,000
MW
Under
Construction.
Cost
acres of
land has been
estimate
million. EIB
acquired 240
by WAPDA.
and
KfW signed
Preliminary
work loan
i.e.
agreements
construction to
of provide
Wapda
100
million
and 97 million
offices,
residential
Status facilities,
Under
construction.
To
respectively
for
the project.
Under
Construction.
Tobe
be
roads
and
other
Under
construction.
To
be
completed
in
2016;
Expected
to
be
completed
completed
by
the
end
of
infrastructure
Thor and
completed
by at
2015.
Privately
owned
[26][26][40][41]
by
October
2016
and
2015.
cost
Shatial
bypass
underway.
[23]
hydropower
plant.
Project
[39]
contract
for
civil
work
has
estimate
$130
million
[43]
Estimated
to cost
around
is
being
financed
by
IFC,
already
been
awarded.
$14
billion
andBank.
be [14] The
ADB,
K-Exim
preliminary
works
completed
in abouti.e.
12
Under
Construction,
construction
of offices,
years
i.e.
2025
Progress
23%
untilare
Dec
colony and
roads
[48]
Under
construction.
2013.
Estimated
to [44][45]
cost
already
in
progress
[49]
Feasibility
study
and
$332
million and
completed
[39][46]
detailed
engineering
by June 2015
Under
designsconstruction,
of the $7.5 billion
Under
Construction,
estimated
to been
cost up to expected to cost PKR 3.84 billion and would be completed in 2016 with Chinese c
project have
Rs4,843.726
million.
80%
completed.
WB
will be
theexpected to cost Rs1,372 million.[37]
Under
Construction,
of
the
cost
is
being
Under
construction.
major source
of finance for
provided
bystudy
ADBand
and EIB,
[50]
Feasibility
the project.
scheduled
to
be
completed
detailed engineering
design
[51][52]
by
March
2018.
of the
Project
completed in
2009.[46] construction,
The $377 million[31]
Under
to cost Rs26 billion, to be completed in four years.[53]
Ready
to is
bescheduled to expected
[39]
project
be
constructed,
completed byRun-of-theJune 2015.
river project. Feasibility
studies completed.[54]
Proposed[62]
Proposed
Proposed[62]
Proposed
Proposed, China has shown its keen interest in the development of a project near Kotli.[14]
Proposed
Proposed
Proposed; Run-of-the-river;
Proposed
[63]
France has promised to
fund
part the construction.
Proposed
Construction expected to
start in 2015.[63]
Proposed
Proposed; Feasibility study, detailed engineering designs studies and tender document completed in 2
Proposed, cost estimate
$21 million [31][39]
Proposed, cost estimate
$20 million[39][65]
ted in 2016;[23]
ear Kotli.[14]
In Service
Station
Community
Karachi, Sindh
Khushab,Punjab
Total Capacity
Community
Karachi
Karachi
Hub, Balochistan
Total Capacity
ervice
Capacity (MW)
325
325
125
200
Status
Operational since June 2000
Operational
sinceatMarch
2011[66]
Partially Operational
100MWh
since 2002
upon exceeding its design life; To be
decommissioned in 2019
Operational since 1998.
975 MW
tion or Proposed
Capacity (MW)
340
Status
Under construction, to
be completed by 2017,
estimated cost of Chashnupp 3 and 4 is around
[68]
Under
construction,
will be completed
completed
$1.9 billion.
PAEC has recently
the by 2016.[67]
Dom Placement at Chashma-3 and Chashma4.[69]
1000
Proposed
1000
Proposed
340
1000
2200
Under
Construction since 26 November 2013,
Proposed
to be completed by 2020. Project to cost around
$10 billion.
5880 MW
Station
Community
Capacity (MW)
Jhimpir, Sindh
56.4
Jhimpir, Sindh
50.4
Sindh
150
Thatta, Sindh
35
First Solar
Punjab
AM Pak Energy
Punjab
50
Sindh
50
Taxila, Punjab
Punjab
10
CWE Solar
Cholistan
50
Kasur
10
Lodhran
20
Bahawalpur
1000
Total capcity 106.8
Status
Operational since 2009; Pakistan's firstwind power
station
LOI issued[71]
LOI issued[71]
LOI issued[71]
LOI issued [71][72]
LOI issued[71]
LOI issued[71]
LOI issued[71]
LOI issued[71]
LOI issued[71]
Planned[73]
MW
Power Generation
Thermal
13,116 MW
Hydro
8603 MW
Nuclear
Renewables
Total Generation
975 MW
106.8 MW
22,801 MW