Estimate for construction of Bridge No.

142/1 on NH 37
Ref : Based on Tender Rate
Item No.

Particulars/Description of item

Unit

A.
1/12.10

Total
Quantity
4

Rate in Rs.
In Figures
5

568.62

64.00

26.24

4,018.00

291.92

4,727.00

506.00

10,283.00

65.61

46,223.00

1,019.00

274.00

Bridge No. 142/1


Foundation
Excavation for Structures
Excavation for Structures (Earth work in
excavation of foundation of structures as per
drawing and technical specification, including
setting out, construction of shorting and bracing,
removal of stumps and other deleterious metter,
dressing of sides and bottom and backfilling with
approved material. as per MOSRT Clause No. 304
(I) Ordenary Soil
A. Manual means
i) Upto 3m depth (with dewatering )
ii) 3m to 6m depth (with dewatering )
iii) Above 6m depth (with dewatering )
Pile Foundation

2/12.39
3/12.38

4/12.25

5/12.40

6/12.37

Cum
Cum
Cum

Levelling course for pile capas per drawing and


Cum
tachnical specification MORTH no. 1100,& 1700
Cement concrete for Reinforced concrete in pile
cap complete as per drawing and technical
specifications of MORTH Clouse No. 1100,1600
Cum
& 1700 as per specification and direction of
engineer in charge.
Pile Cap
I) RCC M-35 grade
Case I : Using Concrete mixer
Bored cast-in-situ M35 Grade RCC pile excluding
reinforcement complete as per drawing and
technical specification cl. No. 1100 & 1700 and
removal of excavated earth with all lifts and lead
upto 1000m.as per specification and direction of
engineer in charge.
Metre
(Pile Dia= 1200mm)
(a) Supplying, fitting and placing un-coated TMT
CRS (Fe-500) bar reinforcment in foundation
complete as per drawing and technical specification MT
of MORTH section no 1600
Pile load test on single vertical pile in accordience
with IS: 219 (part-IV)
as per and technical
specification of MORTH section no 1100.
(a) Initial and Routine load test

MT

Item No.

Total
Quantity
4

Rate in Rs.
In Figures
5

Cum

159.06

6,004.00

MT

37.70

46,272.00

Cm.

215,040.00

1.00

Cum

283.10

6,643.00

Com

14.74

7,014.00

MT

48.09

48,292.00

Sqm

421.74

374.00

Particulars/Description of item

Unit

1
Sub Structure
7/13.5

Plain/Reinforced cement concrete in Sub-Structure


complete
as per drawing and
tachnical
specifications plasticiser (Masterplast PL-1) /
equvalent, air entraining and water reducing
plasticiser (Masterplast PAE)/equvalent conforming
to IS-9103-1999 and as per specification and
direction of Engineer in charge.
H) RCC Grade M35
I) High upto 5.0 m Case I : Using Concrete mixer
II) High upto 10m Case I : Using concrete mixer

8/13.6(A)
Supplying, fitting and placing un-coated TMT CRS
(Fe-500) bar reinforcment in sub-structure complete
as per drawing and technical specification
9/13.14

10/14.1

Supplying, fitting and fixing in position true to line


and level elastomeric bearing conforming to IRC:
83(pt- III) section IX and clause 2005 of MoHRT
specifications complete including all accessories
as per drawing and technical specification as per
MORTH section 2000,2200.

Superstructure
Furnishing and placing Reinforced/ Prestressed
cement concrete in super structure as per drawing
and technical specification' cl. no. 1500, 1600 &
1700 including providing plasticiser (Masterplast PL1), air entraining and water reducing plasticiser
(Masterplast PAE) Conforming to IS-9103-1999 as
per specification and direction of Engineer in charge
B. RCC Grade M-25
Case : I Using Concrete mixer
For T Beam and Slab,
2) Hight above 10.0m
E. RCC Grade M-40 (for crash Barrier)
Case I : Using concrete mixer
For T Beam and Slab,
2) Hight upto 5.0m to 10.0m

11/14.2 (a) (a) Supplying, fitting and placing TMT CRS (Fe-500)
bar reinforcment in Super-structure including
splicing complete as per drawing and technical
specification
(a) TATA/SAIL
12/Ana
Bituminous wearing coat:- Providing Bituminous
wearing course comprising of tack coat with
bitumen emulsion as per APWD SOR item No. 5.2
& MOSRT&H specification no. 503;6mm thick
mastic Asphalt as per APWD SOR ITEM NO. 14.5 &
MOSRT&H specification no. 515&2702 and 2 layers
of 25mm thick Asphaltic concrete consisting of close
graded premix surfacing (CGPS) materials with
type-a aggregates as per APWD SOR (item no. 5.11
& MOSRT&H specification no. 512, including all
lead & lift complete as directed.

Total
Quantity
4

Rate in Rs.
In Figures
5

29.60

10,141.00

Rm

62.48

1,271.00

Providing Drainage Spouts complete as per


drawing and technical specifications clauses 2705
of MORTH specification of Roads and Bridge Works
for superstructure works.

Nos

8.00

5,888.00

Back Filling behind abutment, wing wall and retirn


wall complete as per drawing and clause no 2607
of MoSRT&H Specification
(A) Granular Material

Cum

710.40

819.00

17/14.10 Pcc M 15 Grade leveling course below approch


slab complete including all accessories as per
drawing and technical specifications as per
MOSRTH section 2700

Cum

25.56

4,169.00

Nos

36.00

82.00

19/14.11 RCC approch slab including reinforcement and


formwork complete as per drawing and technical
specifications clauses 1500, 1600, 1700 & 2704 of
MORTH specification of Roads and Bridge Works
for superstructure works.

Cum

12.78

8,036.00

20/14.16 Painting on Concrete surface (Proving and applying


2 coats of water based cement paint to unplastered
concrete surface after cleaning the surface of dirt,
dust, oil, grease, enfflorescence and applying paint
@ of 1 liter for 2 sq.m.)

Sqm

147.94

26.00

Item No.

Particulars/Description of item

Unit

1
13/14.22

14/14.6

15/14.9

16/13.9

18/13.8

Providing and laying of a Strip Seal Expansion


Joint catering to maximum horizontal movement
upto 70mm, complete as per approved drawing and
technical specifications clause No 2607to be metre
installed by the manufacturer/supplier or their
authorised representative ensuring compliance to
the manufacturers inrtructions for installation
Construction of pre cast RCC railling of M30 grade,
aggregate size not exceeding 12 mm, true line and
grade, tolerance of vertical RCC post not to exceed
1 in 500 center to center spacing between vertical
post not to exceed 2000mm leaving adequate
space between vertical post for expansion,
Complete as per drawing and technical
specifications clauses of section 2703, 1500, 1600
& 1700 of MoSRT&H specification of Roads and
Bridge Works for superstructure works.

Providing
weep
holes
in
brick
masorny/plain/Reinforced concrete abutment, wing
wall/return wall with 100m dia AC pipe, extending
through the full width of the structure with slope of
1V:20H towards drrawing force, complete as per
approved drawing and technical specification clause
2706 & 2200 of MORTH Specification.

Item No.
1
26/Anna

Total
Quantity
4

Rate in Rs.
In Figures
5

Rm

61.28

1,347.00

Particulars/Description of item

Unit

2
Hand Rail
Providing and fixing hand rail over the crash barrier
consisting of MS base plate, embeded fastener and nuts,
MS vertical plates and pipe etc. as shown in the drawing
and as per specifications, All the railing components as
mantioned above to be hot dip galvanished with a zinc
coating of atleast 175gm/sqm the thickness the plates to
be as shown in the drawings and pipe to be 65NB heavy
class with a weight not less than 7.29Kg/m and
conforming to IS: 1161-1979. Item to include all incidental
works required to complete the work as directed by the
Engineer-in-charge. Management shall be made for the
length of the pipe only

Total = Rs.
Say Rs.

Executive Engineer, PWD


Guwahati NH Division, Guwahati

Amount
6

36,391.68

105,448.39

1,379,924.75

5,203,198.00
3,032,802.24

279,206.00

Amount
6

954,969.58
1,744,280.31

215,040.00

1,880,633.30

103,414.19

2,322,145.93

157,730.76

Amount
6

300,173.60

79,412.08

47,104.00

581,817.60

106,559.64

2,952.00

102,700.08

3,846.34

Amount
6

82,544.16

18,722,298.98
18,722,299

ive Engineer, PWD


NH Division, Guwahati

Absract Of Cost
Name of Work: Estimate for construction of Underpass on G.U Bypass to NH - 37

Sl.
No.
A Foundation
1
2
3
4
5

Amount
(In Rs.)

Items

Excavation for Structures


Leveling Course for pile cap
Cement concrete for Reinforced concrete in pile M-35 grade
Bored cast-in-situ M35 Grade RCC pile
Supplying fitting & placing TMT-CRS (Fe-500) Bar reinforcement
in foundation
Pile load test on single vertical pile

Sub-Structure

Plain/ Reinforce cement concrete in sub-structure with plastisiger

4
5

Supplying fitting & placing TMT-CRS (Fe-500) Bar


preinforcement in sub-structure
Supplying, fitting and fixing in position true to line and level
elastomeric bearing
Weep Hole in abutment, wing wall & return Wall
Back filling Behind wing wall & return Wall

Super-Structure

Furnishing and placing Reinforced/ Prestressed cement concrete


in super structure
Supplying fitting & placing TMT-CRS (Fe-500) Bar
preinforcement in super-structure
Bituminous Wearing Coat
Precast RCC Railling
Drainage Spout
PCC M15 Leveling course below approach slabe
RCC Approach Slabe
Providing and laying of a Strip Seal Expansion Joint

2
3
4
5
6
7
8

36391.68
105,448.39
1,379,924.75
5,203,198.00
3,032,802.24
279,206.00

954,969.58
1,744,280.31
215,040.00
2952.00
581817.60

1,984,047.49
2322145.93
157,730.76
79412.08
47104.00
106559.64
102700.08
300173.60
18635904.13

Road Appurtenances

1
2
3
4
5

Painting on Concrete surface


Crash Barrier
Sparkle Solar stud
Reflective Pavement marker
Direction & Place identification sign
(i) Upto 0.90 sqm Size
(ii) Over 0.90 sqm Size
Providing and fixing hand rail over the crash barrier

3846.34
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!

82544.16
#REF!

Cost of construction of Bridge No. 142/1


Say Rs. =

#REF!
19893424.00

Executive Engineer, PWD


Guwahati N.H Division

Executive Engineer, PWD


Guwahati N.H Division

Statement No. - 11
Statement of quantity of Br. No. 142/1

1. Earthwork in excavation
0.5*5.4*6.5*16.2=
0.5*5.4*6.5*16.2=
Total

284.31 Cum
284.31 Cum
568.62 Cum

Pile Foundation :
2. P.C.C. M-15
2*5.4*16.20*0.15=
Total

26.244 Cum
26.24 Cum

3. Pile Cap:
Description

Nos

Abutments

2.00

Width (m) Length (m)


5.10

Depth (m)

Vol (Cum)

1.8

291.924

15.9

Total
4. Pile : (1.20m dia)

291.924

R.C.C. M-35

Description

Nos

Pile nos at
each
location

Abutments

2.00

10.00

Length (m)

Vol (Cum)

25.3

506.00

Total

506.00

4. Reinforcement in Foundation (TMT CRS):


20 = 2*10*26.8*20=
10720.00
8 = 2*106*5.9=
1250.80
8 = 2*34*15.2=
1033.60
8 = 2*5*2*4.5*170=
15300.00
25 = 2*47*19.5=
1833.00
25 = 2*145*8.30=
2407.00
20 = 2*50*8.30=
830.00
20 = 2*133*19.5=
5187.00
20 = 2*42.50*6=
510.00

m
m
m
m
m
m
m
m
m

@
@
@
@
@
@
@
@
@

2.47
0.39
0.39
0.39
3.81
3.81
2.47
2.47
2.47

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
=

26478.40
487.81
403.10
5967.00
6983.73
9170.67
2050.10
12811.89
1259.70
65612.41
65.612

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
MT

6. Pile load test:


(Test-load corresponding to theoretically calculated pile load capacities)
Provisions for load testing of pile for vertical and lateral Load carrying capacities are made as
per stipulations of Cl. No. 709.2.2 of IRC : 78-2000, considering the theoretically estimated load
capacities.

Test load for vertical Load


(a) Initial load test for ultimate load =
(b) Routine load test for allowalable load =

Load (t)
708.00
311.00

98

Nos
1.00
1.00

Total load (t)


708.00
311.00

Total

99

1019.00

7. Sub Structure (R.C.C. m-35):


a Abutment Shaft : (R.C.C. m-35) = 2*(1.5+1.0)/2*3.388*14.80=
b Abutment Cap : (R.C.C. m-35) = 2*1.0*0.25*14.80 =

125.356 m3
7.40 m3

c Dirt Wall : (R.C.C. m-35) = 2*2.562*14.80*0.3 =

22.75 m3

d Return Wall : (R.C.C. m-35) = 2*(0.6+2.6)/2*3*0.325=

3.12 m3

e Stiffening Column : (R.C.C. m-35) = 2*0.3*0.275*2.6=

0.43 m3

Grand Total =
8. Reinforcement in Sub structure (TMT CRS)
(a) Abutment Shaft:
32 = 2*2*112*7.15 =
3203.20
32 = 2*2*8*7.18 =
229.76
12 = 2*23*32.80 =
1508.80
12 = 2*23*112*2.0 =
10304.00
(b) Abutment Cap
12 = 2*2*6*15.30 =
10 = 2*2.6*99 =

m
m
m
m

@
@
@
@

6.31
6.31
0.89
0.89

kg/m
kg/m
kg/m
kg/m

159.06 m3

20212.192
1449.79
1342.832
9170.56
32175.37

Kg
Kg
Kg
Kg
Kg

367.20 m @
514.80 m @

0.89 kg/m
0.62 kg/m

326.81 Kg
319.18 Kg
645.98 Kg

Return Wall
20 = 2*2*4*4.6 =
20 = 2*2*2*5.5 =
16 = 2*2*2.9*13 =
10 = 2*2*2.9*18 =
10 = 2*2*2*2.5*20 =

73.60
44.00
150.80
208.80
400.00

m
m
m
m
m

@
@
@
@
@

2.47
2.47
1.58
0.62
0.62

181.79
108.68
238.26
129.46
248.00
906.19

Kg
Kg
Kg
Kg
Kg
Kg

Dirt Wall
16 = 2*123*3.90 =
12 = 2*26*15.40 =
12 = 2*148*3.90 =
12 = 2*26*15.4 =

959.40
800.80
1154.40
800.80

m
m
m
m

@
@
@
@

1515.85
712.71
1027.42
712.71
3968.69
37696.24
37.70

Kg
Kg
Kg
Kg
Kg
Kg
MT

100

kg/m
kg/m
kg/m
kg/m
kg/m

1.58 kg/m
0.89 kg/m
0.89 kg/m
0.89 kg/m
Total =
Grand Total =

9. Elastomeric Bearing
2*5*56*40*9.6 =

215040.00 Cum

10. super structure (R.C.C. - M-25)


1*283.10 =

283.10 Cum

11. Reinforcement bar in super structure (TMT CRS):


1*44.47 =
44.47 MT
(For Crash Barrier)
12 = 2*30.64*0.017 =
1.04 MT
12 = 2*30.64*0.042 =
2.57 MT
Total =
48.09 MT
12. Wearing coat (Mastic Asphalt):
Span
Width (m)
Over all Langth (m)
Nos
1
13.50
31.24
13. Expantion Joint:
Nos
Width (m)
2
14.80
14. RCC. Railing
Sl
Nos of sides
1
2.00

Area (Sqm)
421.74

Total Langth (m)


29.60

Over all Langth (m) Total Langth (m)


31.24
62.48

15. Back fill Behind Abutment:


2*8*3.0*14.80 =
16. Levelling course: (m-15) (Below approach slab)
Nos
width (m)
Length (m)
Depth (m)
2
14.2
3
0.3
17. Weep holes:
Total Nos
36
18. Drainage spout:
Span
Nos per span
Nos
1
8

Total Langth (m)


8.00

100

710.40 Cum

Vol (Cum)
25.56

19. Approach slab: (m-25):


Nos
width (m)
Length (m)
2
14.2
3

20. Painting on raling & Kerbs:


2*24*2.477 =
3*4*2.42 =

Depth (m)
0.15

Vol (Cum)
12.78

118.896
29.04
147.936 sqm

21. Crash Barrier:


4x15

60.0 m

22. Solar stud

4.0 m

23. RMP

80.0 Nos

24. Sign board


2*1.2*1.8 =
2*1.3*0.65 =

4.32 Sqm
1.69 Sqm

25. Concrete for Crash Barrier


2*0.2406*30.64=

14.74 Cum

26. Hand Rail for Crash Barrier


2*30.64 =

61.28 Rm

Executive Engineer, PWD


Guwahati NH Division, Guwahati