Beruflich Dokumente
Kultur Dokumente
142/1 on NH 37
Ref : Based on Tender Rate
Item No.
Particulars/Description of item
Unit
A.
1/12.10
Total
Quantity
4
Rate in Rs.
In Figures
5
568.62
64.00
26.24
4,018.00
291.92
4,727.00
506.00
10,283.00
65.61
46,223.00
1,019.00
274.00
2/12.39
3/12.38
4/12.25
5/12.40
6/12.37
Cum
Cum
Cum
MT
Item No.
Total
Quantity
4
Rate in Rs.
In Figures
5
Cum
159.06
6,004.00
MT
37.70
46,272.00
Cm.
215,040.00
1.00
Cum
283.10
6,643.00
Com
14.74
7,014.00
MT
48.09
48,292.00
Sqm
421.74
374.00
Particulars/Description of item
Unit
1
Sub Structure
7/13.5
8/13.6(A)
Supplying, fitting and placing un-coated TMT CRS
(Fe-500) bar reinforcment in sub-structure complete
as per drawing and technical specification
9/13.14
10/14.1
Superstructure
Furnishing and placing Reinforced/ Prestressed
cement concrete in super structure as per drawing
and technical specification' cl. no. 1500, 1600 &
1700 including providing plasticiser (Masterplast PL1), air entraining and water reducing plasticiser
(Masterplast PAE) Conforming to IS-9103-1999 as
per specification and direction of Engineer in charge
B. RCC Grade M-25
Case : I Using Concrete mixer
For T Beam and Slab,
2) Hight above 10.0m
E. RCC Grade M-40 (for crash Barrier)
Case I : Using concrete mixer
For T Beam and Slab,
2) Hight upto 5.0m to 10.0m
11/14.2 (a) (a) Supplying, fitting and placing TMT CRS (Fe-500)
bar reinforcment in Super-structure including
splicing complete as per drawing and technical
specification
(a) TATA/SAIL
12/Ana
Bituminous wearing coat:- Providing Bituminous
wearing course comprising of tack coat with
bitumen emulsion as per APWD SOR item No. 5.2
& MOSRT&H specification no. 503;6mm thick
mastic Asphalt as per APWD SOR ITEM NO. 14.5 &
MOSRT&H specification no. 515&2702 and 2 layers
of 25mm thick Asphaltic concrete consisting of close
graded premix surfacing (CGPS) materials with
type-a aggregates as per APWD SOR (item no. 5.11
& MOSRT&H specification no. 512, including all
lead & lift complete as directed.
Total
Quantity
4
Rate in Rs.
In Figures
5
29.60
10,141.00
Rm
62.48
1,271.00
Nos
8.00
5,888.00
Cum
710.40
819.00
Cum
25.56
4,169.00
Nos
36.00
82.00
Cum
12.78
8,036.00
Sqm
147.94
26.00
Item No.
Particulars/Description of item
Unit
1
13/14.22
14/14.6
15/14.9
16/13.9
18/13.8
Providing
weep
holes
in
brick
masorny/plain/Reinforced concrete abutment, wing
wall/return wall with 100m dia AC pipe, extending
through the full width of the structure with slope of
1V:20H towards drrawing force, complete as per
approved drawing and technical specification clause
2706 & 2200 of MORTH Specification.
Item No.
1
26/Anna
Total
Quantity
4
Rate in Rs.
In Figures
5
Rm
61.28
1,347.00
Particulars/Description of item
Unit
2
Hand Rail
Providing and fixing hand rail over the crash barrier
consisting of MS base plate, embeded fastener and nuts,
MS vertical plates and pipe etc. as shown in the drawing
and as per specifications, All the railing components as
mantioned above to be hot dip galvanished with a zinc
coating of atleast 175gm/sqm the thickness the plates to
be as shown in the drawings and pipe to be 65NB heavy
class with a weight not less than 7.29Kg/m and
conforming to IS: 1161-1979. Item to include all incidental
works required to complete the work as directed by the
Engineer-in-charge. Management shall be made for the
length of the pipe only
Total = Rs.
Say Rs.
Amount
6
36,391.68
105,448.39
1,379,924.75
5,203,198.00
3,032,802.24
279,206.00
Amount
6
954,969.58
1,744,280.31
215,040.00
1,880,633.30
103,414.19
2,322,145.93
157,730.76
Amount
6
300,173.60
79,412.08
47,104.00
581,817.60
106,559.64
2,952.00
102,700.08
3,846.34
Amount
6
82,544.16
18,722,298.98
18,722,299
Absract Of Cost
Name of Work: Estimate for construction of Underpass on G.U Bypass to NH - 37
Sl.
No.
A Foundation
1
2
3
4
5
Amount
(In Rs.)
Items
Sub-Structure
4
5
Super-Structure
2
3
4
5
6
7
8
36391.68
105,448.39
1,379,924.75
5,203,198.00
3,032,802.24
279,206.00
954,969.58
1,744,280.31
215,040.00
2952.00
581817.60
1,984,047.49
2322145.93
157,730.76
79412.08
47104.00
106559.64
102700.08
300173.60
18635904.13
Road Appurtenances
1
2
3
4
5
3846.34
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
82544.16
#REF!
#REF!
19893424.00
Statement No. - 11
Statement of quantity of Br. No. 142/1
1. Earthwork in excavation
0.5*5.4*6.5*16.2=
0.5*5.4*6.5*16.2=
Total
284.31 Cum
284.31 Cum
568.62 Cum
Pile Foundation :
2. P.C.C. M-15
2*5.4*16.20*0.15=
Total
26.244 Cum
26.24 Cum
3. Pile Cap:
Description
Nos
Abutments
2.00
Depth (m)
Vol (Cum)
1.8
291.924
15.9
Total
4. Pile : (1.20m dia)
291.924
R.C.C. M-35
Description
Nos
Pile nos at
each
location
Abutments
2.00
10.00
Length (m)
Vol (Cum)
25.3
506.00
Total
506.00
m
m
m
m
m
m
m
m
m
@
@
@
@
@
@
@
@
@
2.47
0.39
0.39
0.39
3.81
3.81
2.47
2.47
2.47
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
=
26478.40
487.81
403.10
5967.00
6983.73
9170.67
2050.10
12811.89
1259.70
65612.41
65.612
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
MT
Load (t)
708.00
311.00
98
Nos
1.00
1.00
Total
99
1019.00
125.356 m3
7.40 m3
22.75 m3
3.12 m3
0.43 m3
Grand Total =
8. Reinforcement in Sub structure (TMT CRS)
(a) Abutment Shaft:
32 = 2*2*112*7.15 =
3203.20
32 = 2*2*8*7.18 =
229.76
12 = 2*23*32.80 =
1508.80
12 = 2*23*112*2.0 =
10304.00
(b) Abutment Cap
12 = 2*2*6*15.30 =
10 = 2*2.6*99 =
m
m
m
m
@
@
@
@
6.31
6.31
0.89
0.89
kg/m
kg/m
kg/m
kg/m
159.06 m3
20212.192
1449.79
1342.832
9170.56
32175.37
Kg
Kg
Kg
Kg
Kg
367.20 m @
514.80 m @
0.89 kg/m
0.62 kg/m
326.81 Kg
319.18 Kg
645.98 Kg
Return Wall
20 = 2*2*4*4.6 =
20 = 2*2*2*5.5 =
16 = 2*2*2.9*13 =
10 = 2*2*2.9*18 =
10 = 2*2*2*2.5*20 =
73.60
44.00
150.80
208.80
400.00
m
m
m
m
m
@
@
@
@
@
2.47
2.47
1.58
0.62
0.62
181.79
108.68
238.26
129.46
248.00
906.19
Kg
Kg
Kg
Kg
Kg
Kg
Dirt Wall
16 = 2*123*3.90 =
12 = 2*26*15.40 =
12 = 2*148*3.90 =
12 = 2*26*15.4 =
959.40
800.80
1154.40
800.80
m
m
m
m
@
@
@
@
1515.85
712.71
1027.42
712.71
3968.69
37696.24
37.70
Kg
Kg
Kg
Kg
Kg
Kg
MT
100
kg/m
kg/m
kg/m
kg/m
kg/m
1.58 kg/m
0.89 kg/m
0.89 kg/m
0.89 kg/m
Total =
Grand Total =
9. Elastomeric Bearing
2*5*56*40*9.6 =
215040.00 Cum
283.10 Cum
Area (Sqm)
421.74
100
710.40 Cum
Vol (Cum)
25.56
Depth (m)
0.15
Vol (Cum)
12.78
118.896
29.04
147.936 sqm
60.0 m
4.0 m
23. RMP
80.0 Nos
4.32 Sqm
1.69 Sqm
14.74 Cum
61.28 Rm
101