Automation in the banking sector has resulted in ATMs which same the
banks a huge amount customer satisfaction. Automation is ideas when
the service provided or the product manufactured is highly standardized.
The machines have sensing and control devices that enable them to
operate automobile. The simplest of them called machine attachments
replace human effort. They guide, locate, move and achieve revise
position by means of came, optical sensing. Load sensing mechanisms
and activate the controls to remove human intention.
Automated guided vehicle systems- AGVS – are pallet trucks and unit
load carriers follow embedded guide wires or paint strips to destinations
as programmed.
About the automated flow lines we can say it is a machine which is linked
by a transfer system which moves the parts by using handling machines
which are also automated, we have an automated flow line.
In automated assembly lines the moving pallets move the materials from
station to station and moving arms pick up parts, place them at specified
place and system them by perusing, riveting, & crewing or even welding.
Sensors will keep track of there activities and move the assembles to the
next stage.
Exert influence over the project and its results players or also called
“stake holders’’ of the project
Project manager- the individual responsible for managing the project.
Customer- the individual or organization that will use the product- the
end result of the project.
The project team is responsible for ensuring that the project upon
completion shall deliver the gain in the business for which it is intended
for.
-the project team has to properly co-ordinate with each other working on
different aspects of the project.
-the team members are responsible for the completion of the project as
per the plans of the project.
The analysis charts can be used to monitor, control, track and execute a
project. Typical PERT/ CPM exercise of a project are worked out at the
end of this sub unit- 9.2. The various steps involved in monitoring and
controlling a project from start to end are as follows-
Along with we create status report, create flash reports, project status
reports etc.
7. Approvals - lastly, project sage reviews and the decisions taken and
actions planned need to be approved by the top management. The goals
of such review are to improve quality by finding defects and to improve
productivity by finding defects in a cost effective manner. The group
review progress includes several stage like planning, preparation and
overview, a group review meeting and rework recommendation and
follow-up.
Reduction of inventory
A relatively new SCM option involves web based software with a browser
interface. Several electronic marketplaces for buying and selling goods
and materials.