Reviewed for general conformance with Contract
drawings and specifications.
ACTION :

1 Approved
2

Approved except as
noted. Forward final
drawing.
Approved except as
noted. Resubmission
required.

Disapproved.

For information/reference
only.

Information category with


comments. Resubmission
required.

Approval of Contract documents by the Consultant shall


not relieve the Seller of his responsibility for any errors
and fulfilment of Contract requirements.

Digitally signed by Santanu


Chakraborty
DN: cn=Santanu Chakraborty,
o=DCPL, ou=Power Cell-B,
email=santanuc@in.dclgroup.com,
c=IN
Date: 2015.03.24 16:26:01 +05'30'

It should be Remote Trip Circuit-1 & Trip


Circuit-2

General Comment:
1. Please indicate individual kiosk (i.e Operating mechanism
box which is per pole) & common kiosk (common for 3 single
phase) terminals properly in the scheme drawing.
In BOQ part also indicate location of each component.
2. Terminals which are to be used for Owner's use (Remote
close/Trip/Alarm/Indication etc) shall be marked up clearly in the
scheme/ wiring diagram for easy access.
3. Page reference for all the contacts need to be furnished.
4. Wiring between individual kiosk & common kiosk in BGR's
scope. BGR to confirm the same & necessary coordination with
sub vendor/s as required shall be done by BGR.
5. This scheme drawing shall be generally revised if required as
per comments on circuit breaker GA drawing (Rev-0).

Please check & revise drawing no.

It is noted that contact


of 63GLX is used in
closing circuit of
breaker. Hence,
please clarify when
this gas density
switches will operate &
reset.

Please clarify when this gas


density switches will operate &
reset.

Please clarify when this switches


will operate & reset.

BGR to note that as per contract specification Vol. IIF2/S-IX/Cl


no. 4.01.14 i), breaker shall be in trip position before locked
pressure of SF6 gas occurs. Please ensure the same & indicate
in the scheme.
Closing of breaker also to be blocked during low SF6 gas
pressure.
Pls clarify.

Please mention what indications


are provided i.e Breaker On/OFF,
Spring Charging indication etc.

Remote alarm & indication to be provided for


following minimum conditions:
1. Gas Pressure low alarm
2. Gas Pressure Trip Lockout
3. Pole Discrepancy Operated
4. Spring Charging Indication
5. Breaker On/Off status Indication
6. DC Supply -1 Fail
7. DC Supply -2 Fail
8. AC supply Fail/ Spring Charge Motor Fail
9. Spring Charge fail
Please indicate the same in the scheme drawing
mentioning "For Remote Use".

Operation of this switch is not


understood. Please clarify how it
will operate.

Not legible. Please furnish properly with


each contact destination details (i.e
wherever it is used through out the
scheme) . Spare contacts (10NO
+10NC) need to be specified clearly.

Please furnish location of each component (i.e


whether it is in Operating Mechanism or in
Common Marshalling Box.)

Please clarify what is SPR.

Not understood. Please furnish clarifications


as asked in sheet 2 of scheme drawing in this
regard.

It might be Spring charge


indication. Please check &
revise properly.

Clarify whether in common marshalling box or


individual.

Clarify whether in common marshalling box or


individual.