agency received the request; or (3) j. This application is not ready for The Smith Mountain development
evidence of waiver of water quality environmental analysis at this time. operates as a peaking/load-following
certification. k. The Project Description: The facility, with generation occurring
existing Smith Mountain Project during peak demand periods and pump-
Kimberly D. Bose,
consists of two developments; one used back operation occurring during off-
Secretary.
for pumped storage operation and the peak periods. Under normal operations,
[FR Doc. E8–7913 Filed 4–14–08; 8:45 am] Smith Mountain Lake uses a 2-foot
BILLING CODE 6717–01–P
other conventional operation.
drawdown, which equates to a 13-foot
The upper, pumped storage fluctuation in Leesville Lake. Currently,
development, known as Smith Leesville is operated by auto-cycling the
DEPARTMENT OF ENERGY Mountain, consists of: (1) A 816-foot- units, to provide a minimum average
long, 235-foot-high concrete arch dam, daily flow of 650 cfs to the Roanoke
Federal Energy Regulatory with a crest elevation of 812.0 feet
Commission River downstream. Additional flow is
National Geodetic Vertical Datum provided during the spring spawning
[Project No.: 2210–169] (NGVD); (2) two ogee-crest overflow season for striped bass.
spillways, each 100 feet long and having
Appalachian Power Company; Notice Appalachian Power does not propose
a crest elevation of 595.0 feet NGVD
of Application Tendered for Filing With to modify existing operations, except as
[passing 25,000 cubic feet per second
the Commission and Establishing described in its proposed Water
(cfs)]; (3) a reservoir with a surface area
Procedural Schedule for Licensing and Management Plan. Appalachian also
of 20,260 acres at a normal operating
Deadline for Submission of Final proposes to implement numerous
level of 795.0 feet NGVD; (4) a pump
Amendments environmental enhancement measures
station/powerhouse containing five
that are contained in its proposed
April 9, 2008. generating units, with a total capacity of
resource-specific management plans.
Take notice that the following 586 megawatts (MW), a total hydraulic
capacity of 46,000 cfs, and an average l. Locations of the Application: A
hydroelectric application has been filed
annual generation of 476,640 MWh copy of the application is available for
with the Commission and is available
(three of the units, which have a review at the Commission in the Public
for public inspection.
a. Type of Application: New Major pumping capacity of 15,810 cfs, are Reference Room or may be viewed on
License. reversible for pumping water from the the Commission’s Web site at http://
b. Project No.: 2210–169. Leesville’s reservoir to Smith www.ferc.gov, using the ‘‘eLibrary’’ link.
c. Date Filed: March 27, 2008. Mountain’s reservoir); (5) a 600,000 Enter the docket number, excluding the
d. Applicant: Appalachian Power KVA substation and a double-circuit last three digits in the docket number
Company, dba American Electric Power. 138-kV tie-in line to American Electric field to access the document. For
e. Name of Project: Smith Mountain Power’s (AEP) interconnected system; assistance, contact FERC Online
Hydroelectric Project. and (6) appurtenant facilities. Support at
f. Location: On the headwaters of the FERCOnlineSupport@ferc.gov or toll-
Roanoke River in south-central Virginia, The lower, conventional free at 1–866–208–3676, or for TTY,
within the counties of Bedford, development, known as Leesville, (202) 502–8659. A copy is also available
Campbell, Franklin and Pittsylvania, consists of: (1) A 980-foot-long, 94 foot- for inspection and reproduction at the
and near the city of Roanoke, Virginia. high concrete gravity dam, with a crest address in item (h) above.
No federal lands are occupied by the elevation of 615.67 feet NGVD; (2) a
224-foot-long gated spillway section, m. You may also register online at
project works or otherwise located http://www.ferc.gov/esubscribenow.htm
within the project boundary. with (a) A crest elevation of 578.0 feet
NGVD, (b) four taintor gates, and (c) a to be notified via e-mail of new filings
g. Filed Pursuant to: Federal Power
hydraulic capacity of 175,100 cfs; (3) a and issuances related to this or other
Act 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Teresa P. reservoir with a surface area of 3,260 pending projects. For assistance, contact
Rogers, Environmental and Regulatory acres at an elevation of 613.0 feet FERC Online Support.
Affairs Supervisor, Appalachian Power NGVD; (4) a powerhouse containing two n. Procedural Schedule: The
Company, Hydro Generation, P.O. Box generating units, with a total capacity of application will be processed according
2021, Roanoke, VA 24022–2121; (540) 50 MW, a total hydraulic capacity of to the following Hydro Licensing
985–2441; tprogers@aep.com. 9,000 cfs, and an average annual Schedule. Revisions to the schedule
i. FERC Contact: Allan Creamer, generation of 59,376 MWh; (5) a 50,000 may be made as appropriate. For
Federal Energy Regulatory Commission, KVA substation and a double-circuit example, issuance of the Ready for
888 First Street, NE., Washington, DC 138-kV tie-in line to AEP’s Environmental Analysis Notice is based
20426; (202) 502–8365; interconnected system; and (6) on the assumption that there will be no
allan.creamer@ferc.gov. appurtenant facilities. additional information.

Milestone Target Date

Tendering Notice ......................................................................................................................................................................... (April 2008).


Notice of Acceptance/Notice of Ready for Environmental Analysis ........................................................................................... (May 2008).
Filing of recommendations, preliminary terms and conditions, and fishway prescriptions ........................................................ (July 2008).
Commission issues Draft EA or EIS ........................................................................................................................................... (January 2009).
Comments on Draft EA or EIS .................................................................................................................................................... (March 2009).
Modified Terms and Conditions .................................................................................................................................................. (May 2009).
jlentini on PROD1PC65 with NOTICES

Commission Issues Final EA or EIS ........................................................................................................................................... (August 2009).

VerDate Aug<31>2005 17:31 Apr 14, 2008 Jkt 214001 PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 E:\FR\FM\15APN1.SGM 15APN1
Federal Register / Vol. 73, No. 73 / Tuesday, April 15, 2008 / Notices 20279

o. Final amendments to the this project. First, any person wishing to on the Commission’s Web site under the
application must be filed with the obtain legal status by becoming a party ‘‘e-Filing’’ link at http://www.ferc.gov.
Commission no later than 30 days from to the proceedings for this project The Commission strongly encourages
the issuance date of the notice of ready should, on or before the comment date intervenors to file electronically.
for environmental analysis. stated below, file with the Federal Persons unable to file electronically
Energy Regulatory Commission, 888 should submit an original and 14 copies
Kimberly D. Bose,
First Street, NE., Washington, DC 20426, of the protest or intervention to the
Secretary. a motion to intervene in accordance Federal Energy Regulatory Commission,
[FR Doc. E8–7955 Filed 4–14–08; 8:45 am] with the requirements of the 888 First Street, NE., Washington, DC
BILLING CODE 6717–01–P Commission’s Rules of Practice and 20426.
Procedure (18 CFR 385.214 or 385.211) Comment Date: April 30, 2008.
and the Regulations under the NGA (18
DEPARTMENT OF ENERGY CFR 157.10). A person obtaining party Kimberly D. Bose,
status will be placed on the service list Secretary.
Federal Energy Regulatory maintained by the Secretary of the [FR Doc. E8–7957 Filed 4–14–08; 8:45 am]
Commission Commission and will receive copies of BILLING CODE 6717–01–P
[Docket No. CP08–110–000] all documents filed by the applicant and
by all other parties. A party must submit
Gulf South Pipeline Company, LP; 14 copies of filings made with the DEPARTMENT OF ENERGY
Notice of Application Commission and must mail a copy to
the applicant and to every other party in Federal Energy Regulatory
April 9, 2008. Commission
the proceeding. Only parties to the
Take notice that on April 4, 2008,
proceeding can ask for court review of
Gulf South Pipeline Company, LP (Gulf
Commission orders in the proceeding. [Docket No. CP08–114–000]
South), 9 Greenway Plaza, Houston, However, a person does not have to
Texas 77046, filed in Docket No. CP08– intervene in order to have comments Natural Gas Pipeline Company of
110–000 an application pursuant to considered. The second way to America LLC; Notice of Application
section 7(b) of the Natural Gas Act participate is by filing with the
(NGA) requesting permission and April 9, 2008.
Secretary of the Commission, as soon as
approval to abandon by sale to Energy possible, an original and two copies of Take notice that on April 7, 2008,
Partners, LTD. Approximately 11.8 comments in support of or in opposition Natural Gas Pipeline Company of
miles of 12-inch diameter pipeline to this project. The Commission will America LLC (Natural), 747 East 22nd
facilities and related appurtenances consider these comments in Street, Lombard, Illinois 60148, filed an
located in federal and state waters determining the appropriate action to be application pursuant to section 7(c) of
offshore in the Gulf of Mexico. In taken, but the filing of a comment alone the Natural Gas Act for a certificate of
addition, Gulf South is requesting a will not serve to make the filer a party public convenience and necessity to
determination that upon abandonment, to the proceeding. The Commission’s construct and operate certain facilities,
Energy Partners ownership and rules require that persons filing located in Cameron Parish, Louisiana,
operation of the facilities will be exempt comments in opposition to the project all as more fully set forth in the
from Commission jurisdiction under provide copies of their protests only to application which is on file with the
1(b) of the NGA, all as more fully set the party or parties directly involved in Commission and open for public
forth in the application which is on file the protest. inspection. This filing is available for
with the Commission and open to Persons who wish to comment only review at the Commission in the Public
public inspection. This filing is on the environmental review of this Reference Room or may be viewed on
accessible on-line at http:// project should submit an original and the Commission’s Web site at http://
www.ferc.gov, using the ‘‘eLibrary’’ link two copies of their comments to the www.ferc.gov using the ‘‘eLibrary’’ link.
and is available for review in the Secretary of the Commission. Enter the docket number excluding the
Commission’s Public Reference Room in Environmental commentors will be last three digits in the docket number
Washington, DC. There is an placed on the Commission’s field to access the document. For
‘‘eSubscription’’ link on the Web site environmental mailing list, will receive assistance, please contact FERC Online
that enables subscribers to receive e- copies of the environmental documents, Support at
mail notification when a document is and will be notified of meetings FERCOnlineSupport@ferc.gov or toll
added to a subscribed docket(s). For associated with the Commission’s free at (866) 208–3676, or for TTY,
assistance with any FERC Online environmental review process. contact (202) 502–8659.
service, please e-mail Environmental commentors will not be Specifically, Natural proposes to
FERCOnlineSupport@ferc.gov, or call required to serve copies of filed construct and operate approximately
(866) 208–3676 (toll free). For TTY, call documents on all other parties. 900 feet of 16-inch diameter pipeline
(202) 502–8659. However, the non-party commentors and operate an already constructed
Any questions regarding this will not receive copies of all documents meter, consisting of ultrasonic meter
application should be directed to J. Kyle filed by other parties or issued by the runs, flow control valve, gas quality
Stephens, Vice President, Regulatory Commission (except for the mailing of monitoring devices, and Electronic flow
Affairs, Gulf South Pipeline South environmental documents issued by the Measurement facilities. Natural states
Pipeline Company, LP, 9 Greenway Commission) and will not have the right that the facilities are necessary to
Plaza, Houston, Texas 77046, or call to seek court review of the receive up to 300 MDth/day of re-
jlentini on PROD1PC65 with NOTICES

(713) 479–8033, by fax (713) 479–1846, Commission’s final order. vaporized liquefied natural gas from the
or by e-mail to Comments, protests and interventions Sabine Pass Segment of the Cheniere
kyle.stephens@bwpmlp.com. may be filed electronically via the Creole Trail Pipeline (Cheniere), located
There are two ways to become Internet in lieu of paper. See 18 CFR in Cameron Parish, Louisiana. Natural
involved in the Commission’s review of 385.2001(a)(1)(iii) and the instructions estimates the cost of construction to be

VerDate Aug<31>2005 17:31 Apr 14, 2008 Jkt 214001 PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 E:\FR\FM\15APN1.SGM 15APN1

Das könnte Ihnen auch gefallen