Beruflich Dokumente
Kultur Dokumente
EPN
NDICE
OPCIN 1........................................................................................... 4
3.2
OPCIN 2........................................................................................... 6
3.3
OPCIN 3........................................................................................... 6
4. RESULTADOS...........................................................................7
4.1
OPCIN 1........................................................................................... 7
4.2
OPCIN 2........................................................................................... 8
4.3
OPCIN 3........................................................................................... 9
4.4
RESUMEN TOTAL.............................................................................. 10
5. ANEXOS................................................................................11
5.1
FMULAS EMPLEADAS.....................................................................11
5.2
TOPOGRAFA ENTREGADA...............................................................11
DATOS
Q (m3/seg)
1,5
0,016
Espesor de
paredes (m)
0,1
0,6
I /
Costo
de
excava
cin /
m3 ($)
4
Costo de
Costo de
Revestimi
Desalojo
ento / m3
/ m3 ($)
($)
150
RADIO MNIMO
Hasta 10 m3/s
3 * ancho de la base
De 10 a 14 m3/s
4 * ancho de la base
De 14 a 17 m3/s
5 * ancho de la base
De 17 a 20 m3/s
6 * ancho de la base
De 20 m3/s a mayor
7 * ancho de la base
Los radios mnimos deben ser redondeados hasta el prximo metro superior
TALUD (horizontal :
vertical)
Prcticamente vertical
0.25 : 1
1:1
1.5 : 1
2:1
3:1
3. METODOLOGA
3.1 OPCIN 1
siguientes: topogrficos,
hidrulicos, entre otros.
geolgicos,
geotcnicos,
hidrolgicos,
SECCIN PTIMA
3.2 OPCIN 2
Para la realizacin de la segunda opcin designada de canal, donde
solo se disee un elemento con corte, es necesario trasladar el eje de
ensamble diseado en el programa computacional CivilCad 2014, a la
posicin mostrada en la siguiente figura, siendo esta el resultado de
la geometra pedida para el clculo de volmenes.
4. RESULTADOS
7
4.1 OPCIN 1
Zona de corte
Volumen
de Corte
(m3)
Total (m3)
Inversin ($)
Volumen
de Relleno
(m3)
1204947,68 768414,27
$
$
4.819.790,7 3.073.657,0
2
8
Volumen
necesario
de
relleno
(m3)
Volumen
neto de
desalojo
(m3)
547179,46 110646,05
436533,41
Volumen
de
Desalojo
(m3)
$
1.309.600,23
$
10.568.427,2
1
$ 528.421,36
V(m/seg)
Revestimient
o Canal
$ 1.365.379,18
1,14
4.2 OPCIN 2
Cuadros de resumen de inversin y obra, para canal trapezoidal con
alternativa de utilizacin del recurso de corte de material, sin utilizacin
de relleno, son mostrados a continuacin:
Zona de corte
Volumen
de Corte
(m3)
Volumen
de
Relleno
(m3)
Volumen
de
Desalojo
(m3)
Volumen
necesario
de relleno
(m3)
Volumen
neto de
desalojo
(m3)
Total
(m3)
1790720,46
1790720,46
1790720,46
Inversin
($)
$
7.162.881,8
4
$ 0,00
$
5.372.161,3
8
$
13.900.422,4
0
$ 695.021,12
V(m/seg)
Revestimien
to Canal
$
1.365.379,18
1,14
4.3 OPCIN 3
Sif
n
Longit
ud
(m)
Volum
en de
Corte
(m3)
Costo
($)
Volume
n de
Relleno
(m3)
Costo
($)
Volumen
de
Desalojo
(m3)
Costo
($)
361,71 1961,77
$7.847
1531,27
$5.359
430,50
$1.291
363,71 1972,61
$7.890
1539,74
$5.389
432,88
$1.299
366,71 1988,88
$7.956
1552,44
$5.434
436,45
$1.309
450,61 2443,90
$9.776
1907,60
$6.677
536,30
$1.609
213,51 1157,99
$4.632
903,88
$3.164
254,11
$762
456,77 2477,32
$9.909
1933,69
$6.768
543,63
$1.631
1021,09
$3.063
1476,47
$4.429
718,68
$2.156
1586,37
$4.759
1593,71
$4.781
8
9
10
11
Precio
Corte
$164.602
Relleno
$112.421
Desalojo
$27.091
Tubera
$9.638.224
Total
$
9.942.337
Costo
Costo
Tubera
Total ($)
($)
$272.88 $287.37
1
9
$114.13 $128.71
9
7
$243.85 $258.55
2
0
$376.73 $394.80
9
0
$115.98 $124.54
4
2
$391.54 $409.85
9
7
$1.147.6 $1.182.0
61
48
$2.398.2 $2.447.9
11
34
$658.26 $682.46
4
7
$762.60 $816.02
2
7
$2.852.2 $2.905.9
30
02
10
Volumen de
Corte (m3)
Volumen de
Relleno (m3)
Volumen de
Desalojo
(m3)
Total (m3)
297773,5
11641,85
286131,6521
Inversin ($)
$ 1.191.094,00
$ 46.567,39
$ 858.394,96
$
12.038.393,3
9
$ 601.919,67
Costo
tubera ($)
$
9.942.337,05
$
10.568.427,2
1
$
13.900.422,4
0
$
12.038.393,3
9
11
5. ANEXOS
5.1FMULAS EMPLEADAS
5.2TOPOGRAFA ENTREGADA
12
DATOS
Q (m3/seg)
Espesor de
paredes (m)
I /
1,5
0,016
0,1
0,6
13
Costo
de
excava
cin /
m3 ($)
4
b
(m)
y
(m)
s
(m)
0,2
0,5
1
1,5
2
2,5
3
3,5
4
1,36
1,13
0,87
0,70
0,58
0,51
0,45
0,41
0,38
0,40
0,40
0,40
0,40
0,40
0,40
0,40
0,40
0,40
150
rea
v
Hidruli (m/se
ca (m2)
g)
1,38
1,34
1,32
1,33
1,37
1,43
1,48
1,54
1,60
rea
rea
Interior Revestimi
(m2)
ento (m2)
2,31
2,27
2,30
2,43
2,61
2,82
3,05
3,28
3,52
Costo de
Costo de
Revestimi
Desalojo
ento / m3
/ m3 ($)
($)
1,09
1,12
1,14
1,12
1,09
1,05
1,01
0,97
0,94
Costo
Total /
metro
lineal ($)
93,62
89,05
86,21
87,98
b1
(m)
0,40
0,70
1,20
1,70
2,20
2,70
3,20
3,70
4,20
rea de
desalojo
(m3/m)
0,50
0,47
0,46
0,46
0,48
0,51
0,55
0,59
0,63
rea de
excavac
B (m) h (m) H (m)
in
(m2)
2,63
2,66
2,84
3,13
3,50
3,91
4,34
4,79
5,25
1,76
1,53
1,27
1,10
0,98
0,91
0,85
0,81
0,78
Costo
Costo
de
Revestimi
excavac
ento ($)
in ($)
2,31
2,27
2,30
2,43
2,61
2,82
3,05
3,28
3,52
11,25
10,99
11,03
11,56
12,37
13,34
14,39
15,48
16,60
75,44
71,24
68,27
69,13
72,30
76,86
82,19
88,04
94,24
Costo Total
($) /Km
b (m)
H (m)
0,2
0,5
1
1,5
1,9
1,6
1,4
1,2
$
$
$
$
93.623,51
89.049,38
86.212,43
87.981,75
1,9
1,6
1,4
1,2
1,1
1,0
1,0
0,9
0,9
2,81
2,75
2,76
2,89
3,09
3,34
3,60
3,87
4,15
Costo
Desalojo
($)
6,93
6,82
6,91
7,29
7,83
8,47
9,15
9,85
10,57
14
92,50
98,67
105,72
113,37
121,41
$ 92.500,63
$ 98.666,79
$ 105.721,71
$ 113.370,99
$ 121.410,64
2
2,5
3
3,5
4
1,1
1,0
1,0
0,9
0,9
15
PIZOMETRICA
TERRENO
16
SIFON #2
PIZOMETRICA
TERRENO
SIFON #3
PIZOMETRICA
TERRENO
17
SIFON #4
PIZOMETRICA
TERRENO
SIFON #5
PIZOMETRICA
TERRENO
SIFON #6
18
PIZOMETRICA
TERRENO
SIFON #7
PIZOMETRICA
TERRENO
SIFON #8
19
PIZOMETRICA
TERRENO
SIFON #9
PIZOMETRICA
TERRENO
20
SIFON #10
PIZOMETRICA
TERRENO
SIFON #11
PIZOMETRICA
TERRENO
21