Main Projects in Qatar

PROJECTS IN QATAR
Here are some major projects in Qatar. Some projects have already started, other on
the way. It is important to remind that date mentioned in the projects publication is
not always respected.
PEOPLE MOVER SYSTEM IN QATAR EDUCATION CITY
Client: Qatar Foundation
Consultant:
Contractor: Habtoor Leighton Group
Project Value: $124 Million
Project Duration: 3 years
Status: Execution
HLG has been awarded responsibility for the design and construction of Qatars
US$412 million People Mover System in Education City, which is one of the
countrys first rail projects.
HLGs scope of works, valued at US$124 million, incorporates the design and
construction of track-work, tram-stops and a depot facility, which includes
maintenance workshops and administration buildings. HLG is part of the Siemens
Tram Consortium with Siemens WLL Doha and Siemens AG from Germany.
The People Mover System is located in Dohas Education City. Being built for Qatar
Foundation for Education, Science and Community Development, and is intended to
reduce the flow of traffic within Education City, by allowing students to park their cars
in purpose-built multi-storey car parks and travel free of charge on a battery-powered
tram system to their destination within Education City.
LUSAIL DEVELOPMENT FOR PRIMARY INFRASTRUCTURE
Client: Lusail Real Estate Development Company (LREDC)
Consultant: QPM
Contractor: MIDMAC YUKSEL JV
Project Value:
Project Duration: 3 years
Status: Execution
The Project comprises of Engineering, Procurement, Construction and
Commissioning of major parts of Road A1, A6, D11 & A10 at Lusail with Junctions
12, 13, and 14, Wadi Underpass, Tunnels T1 & T2, Southern and Marina
Interchanges including Underpass, Bridges, Arch, and Tunnel. The total length of the
roads is 7.5 km. The scope of works include design and construction of a 4.6 km
deep storm water tunnel of 2.4-3 m diameter with 15 shafts. Utilities, irrigation,
electrical substations, road lighting, traffic signals, district cooling and gas distribution
are also in the scope.
MESSAEEID
Client: Qatar Petroleum
Consultant: Iberdrola
Contractor: Seattle Contracting Company
Project Value:
Project Duration:
Status: Execution
Prepared by Mounif Kilani, ECC Kuwait

Page 1/8

Main Projects in Qatar


Construction of asphalt access road Car park, boundary walls, temporary and
permanent fencing Excavation and installation of electrical cable conduits including
electrical power line and supply and erection of perimeter lamp post. Work includes
supply of equipment material manpower and supervision.
SOUQ WAQIF UNDERGROUND CAR PARK
Client: Private Engineering Office (PEO)
Consultant: JAIN Sustainable Engineering Solutions & Parsons
Contractor: Arabian MEP Contracting
Project Value:
Project Duration: 18 months
Status: Execution
Arabian MEP Contacting, secured subcontract award from the project main
contractor UrbaCon to carry out full Mechanical, Electrical and Plumbing (MEP)
works for 3 levels of underground car park at Souq Waqif One of Dohas most
popular souqs.
The project overseeing full MEP work on 106,381.73 sqm underground car park and
will have the capacity of 2,400 cars. The project is scheduled for completion in 18
Months from award date.
NDIA EMIRI TERMINAL
Client: NDIA Steering Committee
Consultant: Overseas Bechtel Incorporated
Contractor: CDC
Project Value: QR 2.000.000.000
Project Duration:
Status: Execution
The NDIA (New Doha International Airport) Project is a Joint Venture of CDC and
Takenaka.
The components included in the works are as follows:
- Emiri / V.V.I.P. Terminal Building
- Passenger Terminal Parking Facilities
- Mosque and related facilities
The Emiri Terminal Architecturally elaborated building of reinforced concrete and
steel structure of approximately 8,000m in two levels. It is divided into three main
parts:
1. Emiri Terminal to accommodate ceremonial reception and departure of guest
of state, private terminal for Emir, His family and selected ministers.
2. Ministers Lounge to serve as a terminal lounge for ministers.
3. V.V.I.P Lounge to accommodate V.V.I.Ps, both those travelling via private
aircraft and those travelling by commercial airline flights.
Passenger Terminal Parking Facilities These facilities include three-level structures
to accommodate 50.000 square meters of public vehicle parking, a commercial
parking structure with shaded parking on the ground level and two at Grade Parking
Lots with a state of the art parking management system.
Mosque is a three-level circular concrete structure with glass exterior at the upper
two levels. The structure is approximately 47 meters in diameter and 13 meters in
height above the plaza level. The ground level accommodates storage areas,
elevator & mechanical room. The plaza level of the mosque accommodates
assembly, circulation, office and storage areas, including the mens prayer hall. The
Prepared by Mounif Kilani, ECC Kuwait

Page 2/8

Main Projects in Qatar


upper mezzanine level accommodates assembly and circular areas, including the
womens prayer hall. The mosque also accommodates an Imams residence and
Muesins residence.
Mosque Plaza and Minaret paved plaza above the commercial parking structure
complete with landscape lighting, planters, pools, walkways and bridges connecting
to the Vertical Circulation Node which provides access to the Passenger Terminal
Building and Minaret.
NEW DOHA INTERNATIONAL AIRPORT, QATAR
Client: Government of the State of Qatar
Consultant:
Contractor: Bechtel Corporation
Project Value:
Project Duration:
Status: Execution
Bechtel is providing engineering, project management, and construction
management services for the New Doha International Airport, now being built in
Qatar. It will replace an existing facility, increase passenger and cargo-handling
capacity, and accommodate the new Airbus A380 super jumbo jets.
When it opens, the new airport will accommodate 24 million passengers and 750,000
metric tons of cargo annually. It will feature two of the longest commercial runways in
the world, an 85 meter high control tower, a 510,000-square-meter passenger
terminal with 40 gates, a separate terminal for the Emir of Qatar, a general aviation
terminal, a cargo terminal, a 150,000 square meter aircraft maintenance center, one
of the worlds largest airport catering facilities, state-of-the art air traffic control
equipment and security systems, and other facilities.
LUSAIL ICONIC SOLAR STADIUM FIFA WORLD CUP STADIUMS
Client:
Consultant:
Contractor:
Project Value: $662 million
Project Duration:
Status: Planning
The project involves construction of a fully retractable cable net roofed stadium with
a crowd capacity of 86, 250. The dhow sail styled stadiums outer skin is a concave
structure incorporating louver system for ease and pleasure of the fans and players.
The stadium would be surrounded by a pool of water with its roof supported by
arching columns. The solar powered stadium which can be accessed by 6 bridges,
will have its own metro station and will be linked to highways and bus routes.
DOHA METRO
Client: Ministry of Communications and Transport
Consultant: Parsons Brinckerhoff
Contractor:
Project Value: 3bn USD
Project Duration: From Q1 2010 Estimated To Q1 2015 Estimated
Status: Bidding
Doha metro is an 85-KM railway network in Qatar. The railway will include an east
coast link, a high-speed link, a freight link and a light rail system. The railway will
Prepared by Mounif Kilani, ECC Kuwait

Page 3/8

Main Projects in Qatar


serve suburb of Doha and developments such as Lusail, Education city and West
Bay. Phase 1 of the Doha Metro, which includes a Red Line from the south of Doha
through the city toward Lusail.
BARWA FINANCIAL DISTRICT
Client: Barwa Real Estate
Consultant:
Contractor: Bouygues Construction
Project Value: 1.3bn USD
Project Duration: From Q1 2010 Actual To Q3 2013 Actual
Status: Execution
The Barwa Financial District is a giant project conceptualized to serve the global,
regional and local financial sector. The Financial District will house facilities attracting
regional and international banks seeking specialized infrastructure to benefit
from. The Barwa Financial District will be located in the new business city of Doha,
West Bay. The site for the Financial District has an approximate square area of 71,
600 plus sq. m and is situated along Majlis Al Taawon Street with secondary roads
surrounding the perimeter allowing access to it from multiple sides.
LUSAIL DEVELOPMENT LIGHT-RAIL-TRANSIT SYSTEM
Client: Diar Real Estate Development Company
Consultant:
Contractor:
Project Value: TBC
Project Duration: From: Q4 2011 Estimated To: Q1 2016 Estimated
Status: Bidding
The project calls for construction of Light-Rail-Transit System for Lusail
Development. The light-rail-transit system will cover 22 kilometres and include with
around 35 stations.
BARWA CITY DEVELOPMENT
Client: Barwa Real Estate Company (Barwa)
Consultant: Consult Maunsell
Contractor:
Project Value: 1.35bn USD
Project Duration: From Q2 2007 Estimated To Q1 2015 Estimated
Status: Execution
Barwa City will cover a 2.7 million square meter land in Musameer, just outside the
heart of Doha. The development offers its home owners and investors 128
apartment buildings, 6000 flats, and 1024 studio units. The city will also include
schools, a hospital, mosques, parks, shopping complexes, health facilities and all
other conceivable amenities. City capacity is 20,000 families. It will have its own
district cooling system and total wireless internet coverage.
LUSAIL LIGHT RAIL TRANSIT SYSTEM PHASE 1
Client: Qatar Railways Company (QRail)
Consultant:
Contractor: Qatari Diar Vinci Construction (QDVC)
Project Value: 5 b USD
Project Duration: From Q4 2012 To Q1 2015
Prepared by Mounif Kilani, ECC Kuwait

Page 4/8

Main Projects in Qatar


Status: Execution
Pase 1 covers civil engineering works in seven underground stations, construction of
a viaduct over the highway between Doha and the northern part of the country and
preliminary work for the LRT depot and maintenance workshop.
The Lusail LRT project entails four lines covering a distance of 30km, with ten
underground stations and 25 at grade stations, being developed in several phases.
The entire project is executed in several engineering study and construction phases,
where the next and final phase will include rolling stock and systems.
Integrated into 19 mixed-use districts, the project will transport 200,000 people and
around 400,000 visitors a day in the new city of Lusail and is being developed on a
37km waterfront site 15km north of Doha.
DOHA FESTIVAL CITY
Client: Bawabat Al Shamal Real Estate Company WLL (BASREC)
Consultant:
Contractor: Qatar Islamic Bank (QIB), DP Architects, Arab Engineering Bureau
(AEB) (Project Architect), Mace International (Project Manager)
Project Value: QAR 6 billion
Project Duration: From Q1 2011 Estimated To Q1 2014 Estimated
Status: Execution
The total area of Doha Festival City is 433,847m2 and located 15km north of
downtown Doha on Al Shamal Road. The plot will include 260,000sqm gross
leasable area of retail space offering over 500 retail units which will include a large
number of new brands to Qatar. In addition, the project will boast the first Ikea store
in Qatar, and will feature an entertainment and leisure complex, automotive
showrooms, international hotels and convention centre.
UMM SALAL STADIUM
Client: Qatar Football Association
Consultant: Albert Speer & Partner
Contractor: CH2M Hill
Project Value: 251m USD
Project Duration: 2012 to 2015
Status: Execution
Umm Slal Stadium will have 45,120 seats. The design is a modern interpretation of
traditional Arab forts. After the FIFA World Cup, seating capacity will be reduced to
25,500.
LUSAIL LIGHT RAIL TRANSIT SYSTEM
Client: Qatar Railway Development Company
Consultant: Turner and Townsend
Contractor: Qatari Diar, Vinci Construction
Project Value: 1.8bn USD
Project Duration: 2011 to 2016
Status: Execution
The network is composed of four main tram lines extending over 30.5 kms
underground and over ground and 36 passenger stations.
In the southern part of the city, a 5.5 kilometre underground railway is under
construction. Joining various residential districts across the city and serving the
Marina, Energy City and Qatar Entertainment City.
Prepared by Mounif Kilani, ECC Kuwait

Page 5/8

Main Projects in Qatar


The northern sector of Lusail City will have 24 stations at grade to serve the areas of
Fox Hills district, the Northern Residential district, the Medical and Educational
districts, the Golf district and to Lusail Citys plaza at the heart of the city.
In the near future, the rail network will connect to Dohas metro network at a network
interchange located on Khor highway.
BARAHA MOTOR CITY
Client: Barwa Real Estate
Consultant:
Contractor:
Project Value: 533m USD
Project Duration: 2012 to 2017
Status: FEED (front end engineering design)
Motor City will be located next to Qatar Racing Club and will cover almost 2mn
sqm. Baraha Motor City will create a self-contained integrated community to attract
motorists seeking a broad range of automotive related services.
AL KHOR STADIUM
Client: Qatar Football Association
Consultant: Albert Speer & Partner, CH2M Hill
Contractor:
Project Value: 250m USD
Project Duration: 2015 to 2019
Status: Planning
Al-Khor is a 45,330-capacity stadium with a seashell motif and a flexible roof. The
permanent lower tier seats 25,500 and the modular upper tier seats 19,830. The
stadium offers spectators a view of the Arabian Gulf from their seats and will be
located in a sports and recreation zone.
FOUR STAR HOTEL PROJECT
Client: Qatar Airways
Consultant:
Contractor: Gulf Contracting Company
Project Value:
Project Duration:
Status: Execution
The 4 Star Airport Hotel, is a 400 Room Hotel, is located near the existing Doha
Airport. Approximate Gross Built-Up Area is 43,135 M2 and the development
consists of Basement, Ground and First Floor plus two 6-Storey towers (B+G+7).
Basement (7048 M2) is for Car Park & Plant Room
The Ground Floor to include Front Office, Foyer, Lobby Lounge, Retail, Shops,
Restaurants, Administration,Loading Dock & Back of Houses.
The First Floor is to include Restaurant, Lounge, Meeting Rooms, Business Centre,
Health Club and Swimming Pool.
Above First Floor there are 6 Floors dedicated to the Guest Rooms (400 Rooms).
MUSHEIREB DEVELOPMENT
Client: Dohaland
Consultant: Adjaye Associates, Allies & Morrison, John McAslan & Partners,
Mossessian & Partners,
Prepared by Mounif Kilani, ECC Kuwait

Page 6/8

Main Projects in Qatar


Contractor: Bauer International, Drake & Skull International
Project Value: 5bn USD
Project Duration: From Q1 2010 Estimated To Q1 2016 Estimated
Status: Execution
The development covers an area of 750,000 square metres and will be divided into
several districts, including a residential and mixed-use quarter, a retail quarter, a
heritage quarter and a commercial area called the Headquarters Gateway. It will also
include a shopping mall, hotels and entertainment area.
Surgery Hospital
Area: Al Sadd
Sector: Health
Total Cost: 900,000,000 Q.R.
Status: In progress
Type: Buildings
Start Date: 01 May 2013
Expected completion date: Second quarter of 2015
Construction company: MIDMAC
Consulting company: KEO Consultants
Roads projects
East-West Corridor
Area
Industrial Area
Sector
Expressway Programme Projects
Total Cost
3,900,000,000 Q.R.
Status
In progress
Type
Roads
Start Date
01 September 2013
Expected completion date
Second quarter of 2017
Construction company Contractor:
- East Corridor: China Harbour Engineering Company
- West Corridor: Joannou & Paraskevaides (Overseas) Limited/J&P Avax S.A.
(JV)
Consulting company
Design Consultant: Parsons International
Supervision Consultant:
CH2M Hill Halcrow Ltd
Dukhan Highway East
Area
Sector
Total Cost
Status
Type
Start Date
Expected completion date
Construction company
Consulting company
Supervision Consultant:

Multiple Areas
Expressway Programme Projects
3,700,000,000 Q.R.
In progress
Roads
01 October 2011
Second quarter of 2017
QD/SBG Group
Design Consultant 1: Parsons International
Design Consultant 2: Dar Al Handasah
Parsons International

Prepared by Mounif Kilani, ECC Kuwait

Page 7/8

Main Projects in Qatar

Lusail Expressway
Area
Sector
Total Cost
Status
Type
Start Date
Expected completion date
Construction company
Consulting company
Supervision consultant:
Programme Manager:

Multiple Areas
Expressway Programme Projects
3,500,000,000 Q.R.
In progress
Roads
17 November 2012
Second quarter of 2017
Hyundai Engineering and Construction
Design Consultant: AECOM Middle East Ltd
CDM Smith
KBR

AlMuntazah Street
Area
Sector
Total Cost
Status
Type
Start Date
Expected completion date
Construction company
Consulting company
Supervision Consultant:

Multiple Areas
Expressway Programme Projects
2,300,000,000 Q.R.
In progress
Roads
01 July 2012
Fourth quarter of 2016
Al Jaber Transport & General Contracting LLC
Design Consultant: AECOM Middle East Ltd.
Parsons International

Prepared by Mounif Kilani, ECC Kuwait