requirements of Rules of Practice and DEPARTMENT OF ENERGY new powerhouse and switchyard; (2)
Procedure, 18 CFR 385.210, .211, .214. two turbine/generator units with a
In determining the appropriate action to Federal Energy Regulatory combined installed capacity of 10
take, the Commission will consider all Commission megawatts; (3) a new 0.1-mile-long
protests or other comments filed, but [Project No. 12997–000] aboveground 25-kilovolt transmission
only those who file a motion to line extending from the switchyard to
intervene in accordance with the Kentucky Hydro 4, LLC; Notice of an interconnection point with the local
Commission’s Rules may become a Application Accepted for Filing and utility’s distribution system; and (4)
party to the proceeding. Any comments, Soliciting Motions To Intervene, appurtenant facilities. The proposed
Protests, and Comments Kentucky River Lock and Dam #4
protests, or motions to intervene must
Project would have an average annual
be received on or before the specified March 17, 2008. generation of 30 gigawatt-hours.
comment date for the particular Take notice that the following l. This filing is available for review at
application. hydroelectric application has been filed the Commission in the Public Reference
r. Filing and Service of Responsive with the Commission and is available Room or may be viewed on the
Documents—Any filings must bear in for public inspection: Commission’s Web site at http://
all capital letters the title a. Type of Application: Preliminary www.ferc.gov using the ‘‘eLibrary’’ link.
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT Permit. Enter the docket number excluding the
TO FILE COMPETING APPLICATION’’, b. Project No.: 12997–000. last three digits in the docket number
‘‘COMPETING APPLICATION’’, c. Date filed: September 10, 2007. field to access the document. For
d. Applicant: Kentucky Hydro 4, LLC. assistance, call toll-free 1–866–208–
‘‘PROTEST’’, and ‘‘MOTION TO
e. Name of Project: Kentucky River 3676 or e-mail
INTERVENE’’, as applicable, and the
Lock and Dam #4 Hydroelectric Project. FERCONLINESUPPORT@FERC.GOV.
Project Number of the particular f. Location: Kentucky River in For TTY, call (202) 502–8659. A copy is
application to which the filing refers. Franklin County, Kentucky. It would also available for inspection and
Any of the above-named documents use the U.S. Army Corps of Engineers’ reproduction at the address in item h
must be filed by providing the original Kentucky River Lock and Dam #4. above.
and the number of copies provided by g. Filed Pursuant to: Federal Power m. Competing Preliminary Permit—
the Commission’s regulations to: The Act, 16 U.S.C. 791(a)–825(r). Anyone desiring to file a competing
Secretary, Federal Energy Regulatory h. Applicant Contact: Mr. Brent L. application for preliminary permit for a
Commission, 888 First Street, NE., Smith, COO, Symbiotics, LLC, P.O. Box proposed project must submit the
Washington, DC 20426. An additional 535, Rigby, ID 83442, (208) 745–0834. competing application itself, or a notice
copy must be sent to Director, Division i. FERC Contact: Robert Bell, (202) of intent to file such an application, to
of Hydropower Administration and 502–4126. the Commission on or before the
Compliance, Federal Energy Regulatory j. Deadline for filing comments, specified comment date for the
Commission, at the above-mentioned protests, and motions to intervene: 60 particular application (see 18 CFR 4.36).
address. A copy of any notice of intent, days from the issuance date of this Submission of a timely notice of intent
competing application or motion to notice. allows an interested person to file the
intervene must also be served upon each All documents (original and eight competing preliminary permit
copies) should be filed with: Secretary, application no later than 30 days after
representative of the Applicant
Federal Energy Regulatory Commission, the specified comment date for the
specified in the particular application.
888 First Street, NE., Washington, DC particular application. A competing
s. Agency Comments—Federal, state, 20426. Comments, protests, and preliminary permit application must
and local agencies are invited to file interventions may be filed electronically conform with 18 CFR 4.30 and 4.36.
comments on the described application. via the Internet in lieu of paper; see 18 n. Competing Development
A copy of the application may be CFR 385.2001(a)(1)(iii) and the Application—Any qualified
obtained by agencies directly from the instructions on the Commission’s Web development applicant desiring to file a
Applicant. If an agency does not file site under the ‘‘e-Filing’’ link. The competing development application
comments within the time specified for Commission strongly encourages must submit to the Commission, on or
filing comments, it will be presumed to electronic filings. Please include the before a specified comment date for the
have no comments. One copy of an project number (P–12997–000) on any particular application, either a
agency’s comments must also be sent to comments or motions filed. competing development application or a
the Applicant’s representatives. The Commission’s Rules of Practice notice of intent to file such an
and Procedure require all intervenors application. Submission of a timely
Kimberly D. Bose, filing documents with the Commission notice of intent to file a development
Secretary. to serve a copy of that document on application allows an interested person
[FR Doc. E8–5841 Filed 3–21–08; 8:45 am] each person in the official service list to file the competing application no
BILLING CODE 6717–01–P
for the project. Further, if an intervenor later than 120 days after the specified
files comments or documents with the comment date for the particular
Commission relating to the merits of an application. A competing license
issue that may affect the responsibilities application must conform with 18 CFR
of a particular resource agency, they 4.30 and 4.36.
must also serve a copy of the document o. Notice of Intent—A notice of intent
mstockstill on PROD1PC66 with NOTICES

on that resource agency. must specify the exact name, business


k. Description of Project: The address, and telephone number of the
proposed project using the U.S. Army prospective applicant, and must include
Corps of Engineers’ Kentucky River an unequivocal statement of intent to
Lock and Dam #4 and operated in a run- submit, if such an application may be
of-river mode would consist of: (1) A filed, either a preliminary permit

VerDate Aug<31>2005 16:33 Mar 21, 2008 Jkt 214001 PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 E:\FR\FM\24MRN1.SGM 24MRN1
15506 Federal Register / Vol. 73, No. 57 / Monday, March 24, 2008 / Notices

application or a development filing comments, it will be presumed to files comments or documents with the
application (specify which type of have no comments. One copy of an Commission relating to the merits of an
application). A notice of intent must be agency’s comments must also be sent to issue that may affect the responsibilities
served on the applicant(s) named in this the Applicant’s representatives. of a particular resource agency, they
public notice. must also serve a copy of the document
p. Proposed Scope of Studies Under Kimberly D. Bose,
on that resource agency.
Permit—A preliminary permit, if issued, Secretary. k. Description of Project: The
does not authorize construction. The [FR Doc. E8–5843 Filed 3–21–08; 8:45 am] proposed project using the U.S. Army
term of the proposed preliminary permit BILLING CODE 6717–01–P Corps of Engineers’ Kentucky River
would be 36 months. The work Lock and Dam #8 and operated in a run-
proposed under the preliminary permit of-river mode would consist of: (1) A
would include economic analysis, DEPARTMENT OF ENERGY new powerhouse and switchyard; (2)
preparation of preliminary engineering two turbine/generator units with a
plans, and a study of environmental Federal Energy Regulatory combined installed capacity of 14
impacts. Based on the results of these Commission megawatts; (3) a new 0.14-mile-long
studies, the Applicant would decide [Project No. 12998–000] above ground 25-kilovolt transmission
whether to proceed with the preparation line extending from the switchyard to
of a development application to Kentucky Hydro 8, LLC; Notice of an interconnection point with the local
construct and operate the project. Application Accepted for Filing and utility’s distribution system; and (4)
q. Comments, Protests, or Motions to Soliciting Motions To Intervene, appurtenant facilities. The proposed
Intervene—Anyone may submit Protests, and Comments Kentucky River Lock and Dam #8
comments, a protest, or a motion to Project would have an average annual
intervene in accordance with the March 17, 2008.
generation of 44 gigawatt-hours.
requirements of Rules of Practice and Take notice that the following l. This filing is available for review at
Procedure, 18 CFR 385.210, .211, .214. hydroelectric application has been filed the Commission in the Public Reference
In determining the appropriate action to with the Commission and is available Room or may be viewed on the
take, the Commission will consider all for public inspection: Commission’s Web site at http://
protests or other comments filed, but a. Type of Application: Preliminary www.ferc.gov using the ‘‘eLibrary’’ link.
only those who file a motion to Permit. Enter the docket number excluding the
intervene in accordance with the b. Project No.: 12998–000. last three digits in the docket number
Commission’s Rules may become a c. Date filed: September 10, 2007. field to access the document. For
party to the proceeding. Any comments, d. Applicant: Kentucky Hydro 8, LLC. assistance, call toll-free 1–866–208–
protests, or motions to intervene must e. Name of Project: Kentucky River 3676 or e-mail
be received on or before the specified Lock and Dam #8 Hydroelectric Project. FERCONLINESUPPORT@FERC.GOV.
comment date for the particular f. Location: Kentucky River in For TTY, call (202) 502–8659. A copy is
application. Jessamine County, Kentucky. It would also available for inspection and
r. Filing and Service of Responsive use the U.S. Army Corps of Engineers’ reproduction at the address in item h
Documents—Any filings must bear in Kentucky River Lock and Dam #8. above.
all capital letters the title g. Filed Pursuant to: Federal Power m. Competing Preliminary Permit—
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT Act, 16 U.S.C. 791(a)–825(r). Anyone desiring to file a competing
TO FILE COMPETING APPLICATION’’, h. Applicant Contact: Mr. Brent L. application for preliminary permit for a
‘‘COMPETING APPLICATION’’, Smith, COO, Symbiotics, LLC, P.O. Box proposed project must submit the
‘‘PROTEST’’, and ‘‘MOTION TO 535, Rigby, ID 83442, (208) 745–0834. competing application itself, or a notice
INTERVENE’’, as applicable, and the i. FERC Contact: Robert Bell, (202) of intent to file such an application, to
Project Number of the particular 502–4126. the Commission on or before the
application to which the filing refers. j. Deadline for filing comments, specified comment date for the
Any of the above-named documents protests, and motions to intervene: 60 particular application (see 18 CFR 4.36).
must be filed by providing the original days from the issuance date of this Submission of a timely notice of intent
and the number of copies provided by notice. allows an interested person to file the
the Commission’s regulations to: The All documents (original and eight competing preliminary permit
Secretary, Federal Energy Regulatory copies) should be filed with: Secretary, application no later than 30 days after
Commission, 888 First Street, NE., Federal Energy Regulatory Commission, the specified comment date for the
Washington, DC 20426. An additional 888 First Street, NE., Washington, DC particular application. A competing
copy must be sent to Director, Division 20426. Comments, protests, and preliminary permit application must
of Hydropower Administration and interventions may be filed electronically conform with 18 CFR 4.30 and 4.36.
Compliance, Federal Energy Regulatory via the Internet in lieu of paper; see 18 n. Competing Development
Commission, at the above-mentioned CFR 385.2001(a)(1)(iii) and the Application—Any qualified
address. A copy of any notice of intent, instructions on the Commission’s Web development applicant desiring to file a
competing application or motion to site under the ‘‘e-Filing’’ link. The competing development application
intervene must also be served upon each Commission strongly encourages must submit to the Commission, on or
representative of the Applicant electronic filings. Please include the before a specified comment date for the
specified in the particular application. project number (P–12998–000) on any particular application, either a
s. Agency Comments—Federal, state, comments or motions filed. competing development application or a
mstockstill on PROD1PC66 with NOTICES

and local agencies are invited to file The Commission’s Rules of Practice notice of intent to file such an
comments on the described application. and Procedure require all intervenors application. Submission of a timely
A copy of the application may be filing documents with the Commission notice of intent to file a development
obtained by agencies directly from the to serve a copy of that document on application allows an interested person
Applicant. If an agency does not file each person in the official service list to file the competing application no
comments within the time specified for for the project. Further, if an intervenor later than 120 days after the specified

VerDate Aug<31>2005 16:33 Mar 21, 2008 Jkt 214001 PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 E:\FR\FM\24MRN1.SGM 24MRN1

Das könnte Ihnen auch gefallen