Sie sind auf Seite 1von 2

Federal Register / Vol. 73, No.

51 / Friday, March 14, 2008 / Notices 13885

inspection and reproduction at the Commission, at the above-mentioned days from the issuance date of this
Commission in the Public Reference address. A copy of any motion to notice.
Room, located at 888 First Street, NE., intervene must also be served upon each All documents (original and eight
Room 2A, Washington, DC 20426, or by representative of the Applicant copies) should be filed with: Kimberly
calling (202) 502–8371. This filing may specified in the particular application. D. Bose, Secretary, Federal Energy
also be viewed on the Commission’s Comments, protests and interventions Regulatory Commission, 888 First
Web site at http://www.ferc.gov using may be filed electronically via the Street, NE., Washington, DC 20426.
the ‘‘eLibrary’’ link. Enter the docket Internet in lieu of paper; see 18 CFR Comments, protests, and interventions
number excluding the last three digits in 385.2001(a)(1)(iii) and the instructions may be filed electronically via the
the docket number field to access the on the Commission’s Web site under the Internet in lieu of paper; see 18 CFR
document. For assistance, call toll-free ‘‘e-Filing’’ link. The Commission 385.2001(a)(1)(iii) and the instructions
1–866–208–3676 or e-mail strongly encourages electronic filings. on the Commission’s Web site under the
FERCOnlineSupport@ferc.gov. For TTY, r. Agency Comments: Federal, state, ‘‘e-Filing’’ link. The Commission
call (202) 502–8659. A copy is also and local agencies are invited to file strongly encourages electronic filings.
available for inspection and comments on the described application. Please include the project number (P–
reproduction at the address in item h A copy of the application may be 13120–000) on any comments or
above. obtained by agencies directly from the motions filed.
n. Individuals desiring to be included Applicant. If an agency does not file The Commission’s Rules of Practice
on the Commission’s mailing list should comments within the time specified for and Procedure require all intervenors
so indicate by writing to the Secretary filing comments, it will be presumed to filing documents with the Commission
of the Commission. have no comments. One copy of an to serve a copy of that document on
o. Proposed Scope of Studies under agency’s comments must also be sent to each person in the official service list
Permit: A preliminary permit, if issued, the Applicant’s representatives. for the project. Further, if an intervenor
does not authorize construction. The files comments or documents with the
term of the proposed preliminary permit Kimberly D. Bose,
Commission relating to the merits of an
would be 36 months. The work Secretary.
issue that may affect the responsibilities
proposed under the preliminary permit [FR Doc. E8–5114 Filed 3–13–08; 8:45 am]
of a particular resource agency, they
would include economic analysis, BILLING CODE 6717–01–P
must also serve a copy of the document
preparation of preliminary engineering
on that resource agency.
plans, and a study of environmental
impacts. Based on the results of these k. Competing Application: Project No.
DEPARTMENT OF ENERGY
studies, the Applicant would decide 12906–000, Date Filed: July 30, 2007,
whether to proceed with the preparation Federal Energy Regulatory Date Issued: November 26, 2007,
of a development application to Commission Competing Applications Deadline:
construct and operate the project. closed.
[Project No. 13120–000] l. Description of Project: The proposed
p. Comments, Protests, or Motions to
Intervene: Anyone may submit project, using the U.S. Army Corps of
Duquesne Light Company; Notice of
comments, a protest, or a motion to Engineers’ Monongahela Lock & Dam
Application Accepted for Filing and
intervene in accordance with the No. 4 and operated in a run-of-river
Soliciting Motions To Intervene,
requirements of Rules of Practice and mode, would consist of: (1) A new
Protests, and Comments
Procedure, 18 CFR 385.210, .211, .214. intake structure; (2) a new powerhouse
In determining the appropriate action to March 7, 2008. containing three generating units with a
take, the Commission will consider all Take notice that the following total installed capacity of 20 megawatts;
protests or other comments filed, but hydroelectric application has been filed (3) a new 5,500-foot long, 34 kilovolt
only those who file a motion to with the Commission and is available transmission line; and (4) appurtenant
intervene in accordance with the for public inspection: facilities. The proposed Monongahela
Commission’s Rules may become a a. Type of Application: Preliminary Lock & Dam No. 4 Project would have
party to the proceeding. Any comments, Permit. an average annual generation of 85
protests, or motions to intervene must b. Project No.: 13120–000. gigawatt-hours, which would be used to
be received on or before the specified c. Date filed: February 21, 2008. service its customers.
comment date for the particular d. Applicant: Duquesne Light m. Locations of Applications: A copy
application. Company. of the application is available for
q. Filing and Service of Responsive e. Name of Project: Monongahela Lock inspection and reproduction at the
Documents: Any filings must bear in all & Dam No. 4 Hydroelectric Project. Commission in the Public Reference
capital letters the title ‘‘COMMENTS’’, f. Location: Monongahela River in Room, located at 888 First Street, NE.,
‘‘PROTEST’’, or ‘‘MOTION TO Westmoreland County, Pennsylvania. It Room 2A, Washington, DC 20426, or by
INTERVENE’’, as applicable, and the would use the U.S. Army Corps of calling (202) 502–8371. This filing may
Project Number of the particular Engineers’ Monongahela Lock & Dam also be viewed on the Commission’s
application to which the filing refers. No. 4. Web site at http://www.ferc.gov using
Any of the above-named documents g. Filed Pursuant to: Federal Power the ‘‘eLibrary’’ link. Enter the docket
must be filed by providing the original Act, 16 U.S.C. 791(a)–825(r). number excluding the last three digits in
and the number of copies provided by h. Applicant Contact: Mr. Chris P. the docket number field to access the
the Commission’s regulations to: The McClain, Paul C. Rizzo Associates Inc., document. For assistance, call toll-free
Secretary, Federal Energy Regulatory 105 Mall Boulevard, Suite 270–E, 1–866–208–3676 or e-mail
rwilkins on PROD1PC63 with NOTICES

Commission, 888 First Street, NE., Monroeville, PA 15146, (412) 856–9700. FERCOnlineSupport@ferc.gov. For TTY,
Washington, DC 20426. Any additional i. FERC Contact: Robert Bell, (202) call (202) 502–8659. A copy is also
copy must be sent to Director, Division 502–4126. available for inspection and
of Hydropower Administration and j. Deadline for filing motions to reproduction at the address in item h
Compliance, Federal Energy Regulatory intervene, protests and comments: 60 above.

VerDate Aug<31>2005 19:17 Mar 13, 2008 Jkt 214001 PO 00000 Frm 00059 Fmt 4703 Sfmt 4703 E:\FR\FM\14MRN1.SGM 14MRN1
13886 Federal Register / Vol. 73, No. 51 / Friday, March 14, 2008 / Notices

n. Individuals desiring to be included Applicant. If an agency does not file filing documents with the Commission
on the Commission’s mailing list should comments within the time specified for to serve a copy of that document on
so indicate by writing to the Secretary filing comments, it will be presumed to each person in the official service list
of the Commission. have no comments. One copy of an for the project. Further, if an intervenor
o. Proposed Scope of Studies under agency’s comments must also be sent to files comments or documents with the
Permit: A preliminary permit, if issued, the Applicant’s representatives. Commission relating to the merits of an
does not authorize construction. The issue that may affect the responsibilities
term of the proposed preliminary permit Kimberly D. Bose,
of a particular resource agency, they
would be 36 months. The work Secretary. must also serve a copy of the document
proposed under the preliminary permit [FR Doc. E8–5115 Filed 3–13–08; 8:45 am] on that resource agency.
would include economic analysis, BILLING CODE 6717–01–P k. Competing Application: Project No.
preparation of preliminary engineering 12905–000, Date Filed: July 30, 2007,
plans, and a study of environmental Date Issued: November 26, 2007,
impacts. Based on the results of these DEPARTMENT OF ENERGY Competing Applications Deadline:
studies, the Applicant would decide closed.
whether to proceed with the preparation Federal Energy Regulatory l. Description of Project: The proposed
of a development application to Commission project, using the U.S. Army Corps of
construct and operate the project. [Project No. 13121–000] Engineers’ Emsworth Lock & Dam and
p. Comments, Protests, or Motions to operated in a run-of-river mode, would
Intervene: Anyone may submit Duquesne Light Company; Notice of consist of: (1) A new intake structure;
comments, a protest, or a motion to Application Accepted for Filing and (2) a new powerhouse containing three
intervene in accordance with the Soliciting Motions To Intervene, generating units with a total installed
requirements of Rules of Practice and Protests, and Comments capacity of 35 megawatts; (3) a new
Procedure, 18 CFR 385.210, .211, .214. 11,000-foot long, 34 kilovolt
March 7, 2008.
In determining the appropriate action to transmission line; and (4) appurtenant
take, the Commission will consider all Take notice that the following facilities. The proposed Emsworth Lock
protests or other comments filed, but hydroelectric application has been filed & Dam Project would have an average
only those who file a motion to with the Commission and is available annual generation of 145 gigawatt-
intervene in accordance with the for public inspection: hours, which would be used to service
a. Type of Application: Preliminary its customers.
Commission’s Rules may become a
Permit m. Locations of Applications: A copy
party to the proceeding. Any comments, b. Project No.: 13121–000
protests, or motions to intervene must of the application is available for
c. Date filed: February 21, 2008
be received on or before the specified d. Applicant: Duquesne Light inspection and reproduction at the
comment date for the particular Company Commission in the Public Reference
application. e. Name of Project: Emsworth Lock & Room, located at 888 First Street, NE,
q. Filing and Service of Responsive Dam Hydroelectric Project Room 2A, Washington DC 20426, or by
Documents: Any filings must bear in all f. Location: Ohio River in Allegheny calling (202) 502–8371. This filing may
capital letters the title ‘‘COMMENTS’’, County, Pennsylvania. It would use the also be viewed on the Commission’s
‘‘PROTEST’’, or ‘‘MOTION TO U.S. Army Corps of Engineers’ website at http://www.ferc.gov using the
INTERVENE’’, as applicable, and the Emsworth Lock & Dam. ‘‘eLibrary’’ link. Enter the docket
Project Number of the particular g. Filed Pursuant to: Federal Power number excluding the last three digits in
application to which the filing refers. Act, 16 U.S.C. 791(a)—825(r). the docket number field to access the
Any of the above-named documents h. Applicant Contact: Mr. Chris P. document. For assistance, call toll-free
must be filed by providing the original McClain, Paul C. Rizzo Associates Inc., 1–866–208–3676 or e-mail
and the number of copies provided by 105 Mall Boulevard, Suite 270–E, FERCOnlineSupport@ferc.gov. For TTY,
the Commission’s regulations to: The Monroeville, PA 15146, (412) 856–9700. call (202) 502–8659. A copy is also
Secretary, Federal Energy Regulatory i. FERC Contact: Robert Bell, (202) available for inspection and
Commission, 888 First Street, NE., 502–4126. reproduction at the address in item h
Washington, DC 20426. An additional j. Deadline for filing motions to above.
copy must be sent to Director, Division intervene, protests and comments: 60 n. Individuals desiring to be included
of Hydropower Administration and days from the issuance date of this on the Commission’s mailing list should
Compliance, Federal Energy Regulatory notice. so indicate by writing to the Secretary
Commission, at the above-mentioned All documents (original and eight of the Commission.
address. A copy of any motion to copies) should be filed with: Kimberly o. Proposed Scope of Studies under
intervene must also be served upon each D. Bose, Secretary, Federal Energy Permit: A preliminary permit, if issued,
representative of the Applicant Regulatory Commission, 888 First does not authorize construction. The
specified in the particular application. Street, NE., Washington, DC 20426. term of the proposed preliminary permit
Comments, protests and interventions Comments, protests, and interventions would be 36 months. The work
may be filed electronically via the may be filed electronically via the proposed under the preliminary permit
Internet in lieu of paper; see 18 CFR Internet in lieu of paper; see 18 CFR would include economic analysis,
385.2001(a)(1)(iii) and the instructions 385.2001(a)(1)(iii) and the instructions preparation of preliminary engineering
on the Commission’s Web site under the on the Commission’s web site under the plans, and a study of environmental
‘‘e-Filing’’ link. The Commission ‘‘e-Filing’’ link. The Commission impacts. Based on the results of these
strongly encourages electronic filings. strongly encourages electronic filings. studies, the Applicant would decide
rwilkins on PROD1PC63 with NOTICES

r. Agency Comments: Federal, state, Please include the project number (P– whether to proceed with the preparation
and local agencies are invited to file 13121–000) on any comments or of a development application to
comments on the described application. motions filed. construct and operate the project.
A copy of the application may be The Commission’s Rules of Practice p. Comments, Protests, or Motions to
obtained by agencies directly from the and Procedure require all intervenors Intervene: Anyone may submit

VerDate Aug<31>2005 19:17 Mar 13, 2008 Jkt 214001 PO 00000 Frm 00060 Fmt 4703 Sfmt 4703 E:\FR\FM\14MRN1.SGM 14MRN1

Das könnte Ihnen auch gefallen