Beruflich Dokumente
Kultur Dokumente
1 of 3
https://us-mg5.mail.yahoo.com/neo/launch?retry_ssl=1#2120602728
Subject:
From:
To:
genks_81@yahoo.com;
Date:
5/13/2014 10:17 AM
2 of 3
https://us-mg5.mail.yahoo.com/neo/launch?retry_ssl=1#2120602728
type of cable and its method of installation is known. This, in turn, will depend on the installations
environment.
At the same time, we would need to know whether the supply was single or three-phase, what the
earthing arrangements (learn about this) were and so on.
Here then is our starting point and it is referred to in Part 3 of the IEE Regulations as Assessment of
General Characteristics.
Having ascertained all the necessary details, we can decide on an installation method, the type of
cable and how we will protect against electric shock and overcurrents. We would now be ready
to begin the calculation part of the design procedure.
Basically, there are eight stages in such a procedure. These are the same whatever the type of
installation, be it a cooker circuit or a steel wire armoured (SWA) cable feeding a remote garage.
8 steps
Here then are the 8 steps to begin basic circuit design in a simplified form:
1. Determine the design current Ib
2. Select the rating of the protection In.
3. Select the relevant rating factors (CFs).
4. Divide In by the relevant CFs to give tabulated cable current carrying capacity It.
5. Choose a cable size to suit It.
6. Check the voltage drop (Use MS Excel Spreadsheet to calculate).
7. Check for shock risk constraints.
8. Check for thermal constraints.
Reference: Electric Wiring: Domestic Brian Scaddan IEng, MIET