Sie sind auf Seite 1von 2

Federal Register / Vol. 73, No.

38 / Tuesday, February 26, 2008 / Notices 10237

whole organization rather than any one www.ferc.gov under the ‘‘e-Filing’’ link. l. Location of Application: A copy of
particular function or activity. Please include the project number (P– the application is available for
Comments are invited on the accuracy 1490–046) on any comments or motions inspection and reproduction at the
of the agency’s burden estimate of the filed. Commission’s Public Reference Room,
proposed information collection, k. Description of Application: The located at 888 First Street, NE., Room
including the validity of the Authority filed a request for approval of 2A, Washington, DC 20426, or by calling
methodology and assumptions used to a Facility Use Agreement (the (202) 502–8371. This filing may also be
calculate the reporting burden; and Agreement) between the Authority and viewed on the Commission’s Web site at
ways to enhance the quality, utility and the Brazos Electric Power Cooperative, http://www.ferc.gov using the
clarity of the information to be Inc. (the Cooperative). The Authority ‘‘eLibrary’’ link. Enter the docket
collected. seeks approval of the Agreement under number excluding the last three digits in
the requirements of standard Article 5 of the docket number field to access the
Nathaniel J. Davis, Sr., document. You may also register online
the Authority’s license issued
Deputy Secretary. at http://www.ferc.gov/docs-filing/
September 14, 1989 (48 FERC ¶ 62,190)
[FR Doc. E8–3566 Filed 2–25–08; 8:45 am] and section 22 of the Federal Power Act esubscription.asp to be notified via e-
BILLING CODE 6717–01–P (FPA), 16 U.S.C. 815 (2000), as a mail of new filings and issuances
contract for the sale of project power related to this or other pending projects.
extending beyond the term of the project For assistance, call 1–866–208–3676 or
DEPARTMENT OF ENERGY e-mail FERCOnlineSupport@ferc.gov,
license. The license expires on August
31, 2019. for TTY, call (202) 502–8659. A copy is
Federal Energy Regulatory also available for inspection and
Commission Under license Article 5, the Authority
is required to obtain and retain title in reproduction at the address in item (h)
[Project No. 1490–046] fee in, or the right to use in perpetuity, above.
project property necessary to fulfill m. Individuals desiring to be included
Brazos River Authority; Notice of on the Commission’s mailing list should
project purposes, and the disposal of
Amendment of License and Soliciting so indicate by writing to the Secretary
project property rights once acquired is
Comments, Motions To Intervene, and of the Commission.
subject to Commission approval. n. Comments, Protests, or Motions To
Protests
Section 22 of the FPA provides that Intervene: Anyone may submit
February 5, 2008. contracts for the sale and delivery of comments, a protest, or a motion to
Take notice that the following power for periods extending beyond the intervene in accordance with the
application has been filed with the termination date of a license may be requirements of Rules of Practice and
Commission and is available for public entered into upon the joint approval of Procedure, 18 CFR 385.210, .211, .214.
inspection: the Commission and the appropriate In determining the appropriate action to
a. Application Type: Approval of state public service Commission or take, the Commission will consider all
Contract for Use of Project Facilities and other similar authority in the state in protests or other comments filed, but
for the Sale of Project Power for a Period which the sale or delivery of power is only those who file a motion to
Extending Beyond the Term of License. made. intervene in accordance with the
b. Project No: 1490–046. Under the Agreement, the Cooperative Commission’s Rules may become a
c. Date Filed: December 6, 2007, would be given the right and the party to the proceeding. Any comments,
supplemented January 22, 2008. responsibility, at its own cost, to protests, or motions to intervene must
d. Applicant: Brazos River Authority operate, maintain, and repair the be received on or before the specified
(the Authority). project’s hydroelectric generating comment date for the particular
e. Name of Project: Morris Sheppard facilities and to use the project’s power, application.
Dam Project. subject to certain restrictions and rights The Commission’s Rules of Practice
f. Location: The project is located on reserved to the Authority. In exchange, and Procedure require all intervenors
the Brazos River, in Palo, Pinto, Young, the Cooperative would make annual filing documents with the Commission
and Stephans Counties, Texas. payments to the Authority and would to serve a copy of that document on
g. Filed Pursuant to: Federal Power reimburse the Authority for costs each person whose name appears on the
Act, 16 U.S.C. 815 (2000). incurred by the Authority: (1) Related to official service list for the project.
h. Applicant Contact: John A. compliance and administration of the Further, if an intervenor files comments
Whittaker, IV, Winston & Strawn, LLP, project’s license and compliance with or documents with the Commission
1700 K Street, NW., Washington, DC other regulatory requirements with relating to the merits of an issue that
20006–3817, (202) 282–5766. respect to the project’s generating may affect the responsibilities of a
i. FERC Contact: Hillary Berlin at facilities; and (2) associated with the particular resource agency, they must
(202) 502–8915, or e-mail Authority obtaining a new license for also serve a copy of the document on
Hillary.Berlin@FERC.gov. the project, to the extent related to the that resource agency. A copy of any
j. Deadline for filing comments and or project’s generating facilities. The motion to intervene must also be served
motions: February 26, 2008. Authority would retain ownership of all upon each representative of the
All documents (original and eight project facilities throughout the 30-year Applicant specified in the particular
copies) should be filed with: Office of term of the Agreement, which is subject application.
the Secretary, Federal Energy Regulatory to a 10-year extension at the option of o. Any filings must bear in all capital
Commission, 888 First Street, NE., the Cooperative. The Agreement would letters the title ‘‘COMMENTS’’,
mstockstill on PROD1PC66 with NOTICES

Washington DC 20426. Comments, supersede and replace the current ‘‘PROTEST’’, OR ‘‘MOTION TO
protests and interventions may be filed contractual arrangements between the INTERVENE’’, as applicable, and the
electronically via the Internet in lieu of Authority and the Cooperative, which Project Number of the particular
paper. See, 18 CFR 385.2001(a)(1)(iii) pertain to project operation and application to which the filing refers.
and the instructions on the maintenance and the sale of project p. Agency Comments: Federal, state,
Commission’s Web site at http:// power. and local agencies are invited to file

VerDate Aug<31>2005 19:29 Feb 25, 2008 Jkt 214001 PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 E:\FR\FM\26FEN1.SGM 26FEN1
10238 Federal Register / Vol. 73, No. 38 / Tuesday, February 26, 2008 / Notices

comments on the described application. accordance with Rules 211 and 214 of Commission, 888 First Street, NE.,
A copy of the application may be the Commission’s Rules of Practice and Washington, DC 20426.
obtained by agencies directly from the Procedure (18 CFR 385.211 and Comment Date: February 26, 2008.
Applicant. If an agency does not file 385.214). Protests will be considered by Kimberly D. Bose,
comments within the time specified for the Commission in determining the
Secretary.
filing comments, it will be presumed to appropriate action to be taken, but will
have no comments. One copy of an not serve to make protestants parties to [FR Doc. E8–3551 Filed 2–25–08; 8:45 am]
agency’s comments must also be sent to the proceeding. Any person wishing to BILLING CODE 6717–01–P

the Applicant’s representatives. become a party must file a notice of


intervention or motion to intervene, as
Kimberly D. Bose, DEPARTMENT OF ENERGY
appropriate. Such notices, motions, or
Secretary. protests must be filed on or before the
[FR Doc. E8–3549 Filed 2–25–08; 8:45 am] Federal Energy Regulatory
comment date. Anyone filing a motion Commission
BILLING CODE 6717–01–P to intervene or protest must serve a copy
of that document on the Applicant. On [Project No. 77–187]
or before the comment date, it is not
DEPARTMENT OF ENERGY necessary to serve motions to intervene Pacific Gas and Electric Company;
or protest on persons other than the Notice of Application for Temporary
Federal Energy Regulatory Amendment of License, Soliciting
Commission Applicant.
Comments, Motions To Intervene and
However, a person does not have to
[Docket No. CP07–208–001] Protests
intervene in order to have comments
considered. The second way to February 5, 2008.
Rockies Express Pipeline LLC; Notice participate is by filing with the Take notice that the following
of Amendment Secretary of the Commission, as soon as hydroelectric application has been filed
February 5, 2008. possible, an original and two copies of with the Commission and is available
Take notice that on January 25, 2008, comments in support of or in opposition for public inspection:
Rockies Express Pipeline LLC (Rockies to this project. The Commission will a. Type of Application: Amendment
Express), 370 Van Gordon Street, consider these comments in of license request for temporary
Lakewood, Colorado 80228, filed an determining the appropriate action to be withdrawal and restoration of water.
application in Docket No. CP07–208– taken, but the filing of a comment alone b. Project No.: 77–187.
001, pursuant to section 7(c) of the will not serve to make the filer a party c. Date Filed: January 31, 2008.
Natural Gas Act (NGA) and Part 157 of to the proceeding. The Commission’s d. Applicant: Pacific Gas and Electric
the Commission’s regulations requesting rules require that persons filing Company.
comments in opposition to the project e. Name of Project: Potter Valley
authorization to amend its application
provide copies of their protests only to Hydroelectric Project.
to reflect moving the location of its f. Location: On the Eel River and East
proposed Hamilton Compressor Station the party or parties directly involved in
the protest. Branch Russian River, in Lake and
in Warren County, Ohio and realigning Mendocino Counties, California.
the pipeline route for 3.9 miles in Persons who wish to comment only
g. Filed Pursuant to: Federal Power
Warren and Butler Counties, Ohio to on the environmental review of this
Act, 16 U.S.C. 791a–825r.
adjust for the move. Rockies Express project should submit an original and h. Applicant Contact: Mr. David
states that the move is for two copies of their comments to the Moller, Director Hydro Licensing,
environmental reasons and will result in Secretary of the Commission. Pacific Gas and Electric Company, P.O.
de minimus change in the cost of its Environmental commentors will be Box No. 770000, San Francisco, CA
REX-East project, all as more fully set placed on the Commission’s 94177; (415) 973–4480.
forth in the application which is on file environmental mailing list, will receive i. FERC Contact: CarLisa Linton-
with the Commission and open for copies of the environmental documents, Peters, telephone (202) 502–8416; e-
public inspection. and will be notified of meetings mail: carlisa.linton-peters@ferc.gov.
This filing is available for review at associated with the Commission’s j. Deadline for filing comments,
the Commission in the Public Reference environmental review process. motions to intervene and protests is
Room or may be viewed on the Environmental commentors will not be February 26, 2008.
Commission’s Web site at http:// required to serve copies of filed Please include the project number (P–
www.ferc.gov using the ‘‘eLibrary’’ link. documents on all other parties. 77) on any comments or motions filed.
Enter the docket number excluding the However, the non-party commentors All documents (an original and eight
last three digits in the docket number will not receive copies of all documents copies) must be filed with: Kimberly D.
field to access the document. For filed by other parties or issued by the Bose, Secretary, Federal Energy
assistance, please contact FERC Online Commission (except for the mailing of Regulatory Commission, 888 First
Support at environmental documents issued by the Street, NE., Washington, DC 20426.
FERCOnlineSupport@ferc.gov or toll Commission) and will not have the right Motions to intervene, protests,
free at (866) 208–3676, or for TTY, to seek court review of the comments and recommendations may
contact (202) 502–8659. Commission’s final order. be filed electronically via the Internet in
Any questions regarding this The Commission encourages lieu of paper filings, see 18 CFR
application should be directed to Skip electronic submission of protests and 385.2001(a)(1)(iii) and the instructions
mstockstill on PROD1PC66 with NOTICES

George, Manager of Regulatory, Rockies interventions in lieu of paper using the on the Commission’s Web site (http://
Express Pipeline LLC, P.O. Box 281304, ‘‘eFiling’’ link at http://www.ferc.gov. www.ferc.gov) under the ‘‘e-filing’’ link.
Lakewood, Colorado 80228–8304, Persons unable to file electronically The Commission strongly encourages
phone (303) 914–4969. should submit the original and 14 electronic filings.
Any person desiring to intervene or to copies of the protest or intervention to The Commission’s Rules of Practice
protest this filing must file in the Federal Energy Regulatory and Procedure require all intervenors

VerDate Aug<31>2005 19:29 Feb 25, 2008 Jkt 214001 PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 E:\FR\FM\26FEN1.SGM 26FEN1

Das könnte Ihnen auch gefallen