9602 Federal Register / Vol. 73, No.

35 / Thursday, February 21, 2008 / Notices

NUCLEAR REGULATORY 50.91(a), the licensee has provided its weld metal in any tube mitigating the
COMMISSION analysis of the issue of no significant potential for tube pullout. Therefore, the
hazards consideration, which is margin against tube burst/pullout is
[Docket No. 50–482] maintained during normal and postulated
presented below:
accident conditions and the proposed change
Wolf Creek Nuclear Operating (1) Does the proposed change involve a does not result in a significant increase in the
Corporation; Notice of Consideration significant increase in the probability or probability or consequence of a SGTR.
of Issuance of Amendment to Facility consequences of an accident previously The probability of a SLB is unaffected by
Operating License, Proposed No evaluated? the potential failure of an SG tube as the
Response: No failure of a tube is not an initiator for an SLB
Significant Hazards Consideration
Of the various accidents previously event. SLB leakage is limited by leakage flow
Determination, and Opportunity for a evaluated, the proposed changes only affect restrictions resulting from the leakage path
Hearing the steam generator tube rupture (SGTR) above potential cracks through the tube-to-
The U.S. Nuclear Regulatory event evaluation and the postulated steam tubesheet crevice. The leak rate during
line break (SLB), locked rotor and control rod postulated accident conditions (including
Commission (the Commission, or the ejection accident evaluations. Loss-of-coolant locked rotor and control rod ejection) has
NRC) is considering issuance of an accident (LOCA) conditions cause a been shown to remain within the accident
amendment to Facility Operating compressive axial load to act on the tube. analysis assumptions for all axial or
License No. NPF–42 to Wolf Creek Therefore, since the LOCA tends to force the circumferentially oriented cracks occurring
Nuclear Operating Corporation (the tube into the tubesheet rather than pull it out, 17 inches below the top of the tubesheet.
licensee) for operation of the Wolf Creek it is not a factor in this amendment request. Since normal operating leakage is limited to
Generating Station (WCGS), which is Another faulted load consideration is a safe 0.10 gpm (150 gpd), the attendant accident
located in Coffey County, Kansas. shutdown earthquake (SSE); however, the condition leak rate, assuming all leakage to
The proposed amendment in the seismic analysis of Model F steam generators be from indications below 17 inches from the
licensee’s application dated February 8, [the steam generators at WCGS] has shown top of the tubesheet would be bounded by
2008, would revise Technical that axial loading of the tubes is negligible 0.25 gpm. This value is within the accident
during an SSE. analysis assumptions for the limiting design
Specification (TS) 5.5.9, ‘‘Steam At normal operating pressures, leakage basis accident for WCGS, which is the
Generator (SG) Program,’’ and TS 5.6.10, from primary water stress corrosion cracking postulated SLB event.
‘‘Steam Generator Tube Inspection (PWSCC) below 17 inches from the top of the Based on the above, the performance
Report.’’ For TS 5.5.9, the amendment tubesheet is limited by both the tube-to- criteria of NEI–97–06, Rev. 2 and draft
would replace the existing alternate tubesheet crevice and the limited crack Regulatory Guide (RG) 1.121 continue to be
repair criteria (ARC) in TS 5.5.9.c.1 for opening permitted by the tubesheet met and the proposed change does not
SG tube inspections that was approved constraint. Consequently, negligible normal involve a significant increase in the
in Amendment No. 169 issued October operating leakage is expected from cracks probability or consequences of an accident
10, 2006, for refueling outage 15 (the within the tubesheet region. previously evaluated.
outage for the fall of 2006) and the For the SGTR event, the required structural (2) Does the proposed change create the
margins of the steam generator tubes is possibility of a new or different accident
subsequent operating cycle. The new maintained by limiting the allowable from any accident previously evaluated?
interim ARC would be for the upcoming ligament size for a circumferential crack to Response: No
refueling outage 16 (the outage for the remain in service to 214 degrees below 17 The proposed change does not introduce
spring of 2008) and the subsequent 18- inches from the top of the tubesheet for the any changes or mechanisms that create the
month and 36-month eddy current 18-month SG tubing eddy current inspection possibility of a new or different kind of
inspection intervals, and would apply to interval and to remain in service 183 degrees accident. Tube bundle integrity is expected
service-induced crack-like flaws found below 17 inches from the top of the tubesheet to be maintained for all plant conditions
below 17 inches from the top of the for the 36-month SG tubing eddy current upon implementation of the interim alternate
tubesheet. For TS 5.6.10, three new inspection interval. Tube rupture is repair criteria. The proposed change does not
reporting requirements are proposed to precluded for cracks in the hydraulic introduce any new equipment or any change
expansion region due to the constraint to existing equipment. No new effects on
be added to the existing seven provided by the tubesheet. The potential for existing equipment are created nor are any
requirements. tube pullout is mitigated by limiting the new malfunctions introduced.
Before issuance of the proposed allowable crack size to 214 degrees for the Therefore, based on the above evaluation,
license amendment, the Commission 18-month SG tubing eddy current inspection the proposed changes do not create the
will have made findings required by the interval and to 183 degrees for the 18-month possibility of a new or different kind of
Atomic Energy Act of 1954, as amended SG tubing eddy current inspection interval. accident from any accident previously
(the Act), and the Commission’s These allowable crack sizes take into account evaluated.
regulations. eddy current uncertainty and crack growth (3) Does the proposed change involve a
The Commission has made a rate. It has been shown that a circumferential significant reduction in a margin of safety?
proposed determination that the crack with an azimuthal extent of 214 Response: No
amendment request involves no degrees for the 18-month SG tubing eddy The proposed change maintains the
current inspection interval and an azimuthal required structural margins of the steam
significant hazards consideration. Under extent of 183 degrees for the 36-month SG generator tubes for both normal and accident
the Commission’s regulations in Title 10 tubing eddy current inspection interval meet conditions. NEI 97–06, Rev. 2 and RG 1.121
of the Code of Federal Regulations (10 the performance criteria of NEI [Nuclear are used as the basis in the development of
CFR), § 50.92, this means that operation Energy Institute] 97–06, Rev. 2, ‘‘Steam the limited tubesheet inspection depth
of the facility in accordance with the Generator Program Guidelines’’ and [NRC] methodology for determining that steam
proposed amendment would not (1) Regulatory Guide (RG) 1.121, ‘‘Bases for generator tube integrity considerations are
involve a significant increase in the Plugging Degraded PWR Steam Generator maintained within acceptable limits. RG
probability or consequences of an Tubes.’’ Likewise, a visual inspection will be 1.121 describes a method acceptable to the
accident previously evaluated; or (2) conducted to confirm that a circumferential NRC staff for meeting GDC [General Design
pwalker on PROD1PC71 with NOTICES

crack of greater than 294 degrees for the 18- Criteria, of Appendix A to 10 CFR Part 50],
create the possibility of a new or month SG tubing eddy current inspection 14, 15, 31, and 32 by reducing the probability
different kind of accident from any interval and a circumferential crack of greater and consequences of an SGTR. RG 1.121
accident previously evaluated; or (3) than 263 degrees for the 36-month SG tubing concludes that by determining the limiting
involve a significant reduction in a eddy current inspection interval do not safe conditions of tube wall degradation
margin of safety. As required by 10 CFR remain in service in the tube-to-tubesheet beyond which tubes with unacceptable

VerDate Aug<31>2005 16:34 Feb 20, 2008 Jkt 214001 PO 00000 Frm 00087 Fmt 4703 Sfmt 4703 E:\FR\FM\21FEN1.SGM 21FEN1
Federal Register / Vol. 73, No. 35 / Thursday, February 21, 2008 / Notices 9603

cracking, as established by inservice the need to take this action will occur the petitioner in the proceeding, and
inspection, should be removed from service very infrequently. how that interest may be affected by the
or repaired, the probability and consequences Written comments may be submitted results of the proceeding. The petition
of a SGTR are reduced. This RG uses safety by mail to the Chief, Rulemaking, should specifically explain the reasons
factors on loads for tube burst that are Directives and Editing Branch, Division
consistent with the requirements of Section
why intervention should be permitted
III of the ASME Code.
of Administrative Services, Office of with particular reference to the
For axially oriented cracking located Administration, U.S. Nuclear Regulatory following general requirements: (1) The
within the tubesheet, tube burst is precluded Commission, Washington, DC 20555– name, address and telephone number of
due to the presence of the tubesheet. For 0001, and should cite the publication the requestor or petitioner; (2) the
circumferentially oriented cracking in a tube date and page number of this Federal nature of the requestor’s/petitioner’s
or the tube-to-tubesheet weld, Reference 6 Register notice. Written comments may right under the Act to be made a party
[Westinghouse Electric Company proprietary also be delivered to Room 6D59, Two to the proceeding; (3) the nature and
report LTR–CDME–08–11–P submitted in the White Flint North, 11545 Rockville extent of the requestor’s/petitioner’s
licensee’s application] defines a length of Pike, Rockville, Maryland, from 7:30 property, financial, or other interest in
remaining tube ligament that provides the a.m. to 4:15 p.m. Federal workdays.
necessary resistance to tube pullout due to
the proceeding; and (4) the possible
the pressure induced forces (with applicable
Documents may be examined, and/or effect of any decision or order which
safety factors applied). Additionally, it is copied for a fee, at the NRC’s Public may be entered in the proceeding on the
shown that application of the limited Document Room (PDR), located at One requestor’s/petitioner’s interest. The
tubesheet inspection depth criteria will not White Flint North, Public File Area O1 petition must also identify the specific
result in unacceptable primary-to-secondary F21, 11555 Rockville Pike (first floor), contentions which the petitioner/
leakage during all plant conditions. Rockville, Maryland. requestor seeks to have litigated at the
Based on the above, it is concluded that the The filing of requests for hearing and proceeding.
proposed changes do not result in any petitions for leave to intervene is Each contention must consist of a
reduction of margin with respect to plant discussed below. specific statement of the issue of law or
safety as defined in the Updated Safety Within 60 days after the date of fact to be raised or controverted. In
Analysis Report or bases of the plant publication of this notice, the person’s)
Technical Specifications.
addition, the petitioner/requestor shall
may file a request for a hearing with provide a brief explanation of the bases
The NRC staff has reviewed the respect to issuance of the amendment to for the contention and a concise
licensee’s analysis and, based on this the subject facility operating license and statement of the alleged facts or expert
review, it appears that the three any person’s) whose interest may be opinion which support the contention
standards of 10 CFR 50.92(c) are affected by this proceeding and who and on which the petitioner intends to
satisfied. Therefore, the NRC staff wishes to participate as a party in the rely in proving the contention at the
proposes to determine that the proceeding must file a written request hearing. The petitioner/requestor must
amendment request involves no via electronic submission through the also provide references to those specific
significant hazards consideration. NRC E-filing system for a hearing and a sources and documents of which the
petition for leave to intervene. Requests petitioner is aware and on which the
The Commission is seeking public
for a hearing and a petition for leave to petitioner intends to rely to establish
comments on this proposed intervene shall be filed in accordance
determination. Any comments received those facts or expert opinion. The
with the Commission’s ‘‘Rules of petition must include sufficient
within 30 days after the date of Practice for Domestic Licensing
publication of this notice will be information to show that a genuine
Proceedings’’ in 10 CFR Part 2. dispute exists with the applicant on a
considered in making any final Interested person’s) should consult a material issue of law or fact.
determination. current copy of 10 CFR 2.309, which is Contentions shall be limited to matters
Normally, the Commission will not available at the Commission’s PDR, within the scope of the amendment
issue the amendment until the located at One White Flint North, Public under consideration. The contention
expiration of 60 days after the date of File Area O1F21, 11555 Rockville Pike must be one which, if proven, would
publication of this notice. The (first floor), Rockville, Maryland. entitle the petitioner to relief. A
Commission may issue the license Publicly available records will be petitioner/requestor who fails to satisfy
amendment before expiration of the 60- accessible from the Agencywide these requirements with respect to at
day period provided that its final Documents Access and Management least one contention will not be
determination is that the amendment System’s (ADAMS) Public Electronic permitted to participate as a party.
involves no significant hazards Reading Room on the Internet at the Those permitted to intervene become
consideration. In addition, the NRC Web site, http://www.nrc.gov/ parties to the proceeding, subject to any
Commission may issue the amendment reading-rm/doc-collections/cfr/. If a limitations in the order granting leave to
prior to the expiration of the 30-day request for a hearing or petition for intervene, and have the opportunity to
comment period should circumstances leave to intervene is filed by the above participate fully in the conduct of the
change during the 30-day comment date, the Commission or a presiding hearing.
period such that failure to act in a officer designated by the Commission or If a hearing is requested, the
timely way would result, for example, by the Chief Administrative Judge of the Commission will make a final
in derating or shutdown of the facility. Atomic Safety and Licensing Board determination on the issue of no
Should the Commission take action Panel, will rule on the request and/or significant hazards consideration. The
prior to the expiration of either the petition; and the Secretary or the Chief final determination will serve to decide
comment period or the notice period, it Administrative Judge of the Atomic when the hearing is held. If the final
will publish in the Federal Register a Safety and Licensing Board will issue a determination is that the amendment
pwalker on PROD1PC71 with NOTICES

notice of issuance. Should the notice of a hearing or an appropriate request involves no significant hazards
Commission make a final No Significant order. consideration, the Commission may
Hazards Consideration Determination, As required by 10 CFR 2.309, a issue the amendment and make it
any hearing will take place after petition for leave to intervene shall set immediately effective, notwithstanding
issuance. The Commission expects that forth with particularity the interest of the request for a hearing. Any hearing

VerDate Aug<31>2005 16:34 Feb 20, 2008 Jkt 214001 PO 00000 Frm 00088 Fmt 4703 Sfmt 4703 E:\FR\FM\21FEN1.SGM 21FEN1
9604 Federal Register / Vol. 73, No. 35 / Thursday, February 21, 2008 / Notices

held would take place after issuance of confirming receipt of the document. The Documents submitted in adjudicatory
the amendment. If the final EIE system also distributes an e-mail proceedings will appear in NRC’s
determination is that the amendment notice that provides access to the electronic hearing docket which is
request involves a significant hazards document to the NRC Office of the available to the public at http://
consideration, any hearing held would General Counsel and any others who ehd.nrc.gov/EHD_Proceeding/home.asp,
take place before the issuance of any have advised the Office of the Secretary unless excluded pursuant to an order of
amendment. that they wish to participate in the the Commission, an Atomic Safety and
A request for hearing or a petition for proceeding, so that the filer need not Licensing Board, or a Presiding Officer.
leave to intervene must be filed in serve the documents on those Participants are requested not to include
accordance with the NRC E-Filing rule, participants separately. Therefore, personal privacy information, such as
which the NRC promulgated on August applicants and other participants (or social security numbers, home
28, 2007 (72 FR 49139). The E-Filing their counsel or representative) must addresses, or home phone numbers in
process requires participants to submit apply for and receive a digital ID their filings. With respect to copyrighted
and serve documents over the internet certificate before a hearing request/ works, except for limited excerpts that
or in some cases to mail copies on petition to intervene is filed so that they serve the purpose of the adjudicatory
electronic storage media. Participants can obtain access to the document via filings and would constitute a Fair Use
may not submit paper copies of their the E-Filing system. application, Participants are requested
filings unless they seek a waiver in A person filing electronically may not to include copyrighted materials in
accordance with the procedures seek assistance through the ‘‘Contact their submissions.
described below. Us’’ link located on the NRC Web site For further details with respect to this
To comply with the procedural at http://www.nrc.gov/site-help/e- license amendment application, see the
requirements of E-Filing, at least five (5) submittals.html or by calling the NRC letter dated February 8, 2008, from the
days prior to the filing deadline, the Wolf Creek Nuclear Operating
technical help line, which is available
petitioner/requestor must contact the Corporation, which is available for
between 8:30 a.m. and 4:15 p.m.,
Office of the Secretary by e-mail at public inspection at the Commission’s
Eastern Time, Monday through Friday.
hearingdocket@nrc.gov, or by calling PDR, located at One White Flint North,
The help line number is (800) 397–4209
(301) 415–1677, to request (1) a digital File Public Area O1 F21, 11555
or locally, (301) 415–4737. Participants
ID certificate, which allows the Rockville Pike (first floor), Rockville,
who believe that they have a good cause
participant (or its counsel or Maryland. Publicly available records
for not submitting documents
representative) to digitally sign will be accessible electronically from
electronically must file a motion, in
documents and access the E-Submittal the Agencywide Documents Access and
accordance with 10 CFR 2.302(g), with
server for any proceeding in which it is Management System’s (ADAMS) Public
participating; and/or (2) creation of an their initial paper filing requesting
authorization to continue to submit Electronic Reading Room on the Internet
electronic docket for the proceeding
documents in paper format. Such filings at the NRC Web site, http://
(even in instances in which the
must be submitted by: (1) First class www.nrc.gov/reading-rm/adams.html.
petitioner/requestor (or its counsel or
mail addressed to the Office of the Persons who do not have access to
representative) already holds an NRC-
Secretary of the Commission, U.S. ADAMS or who encounter problems in
issued digital ID certificate). Each
Nuclear Regulatory Commission, accessing the documents located in
petitioner/requestor will need to
Washington, DC 20555–0001, Attention: ADAMS, should contact the NRC PDR
download the Workplace Forms
Rulemaking and Adjudications Staff; or Reference staff by telephone at 1–800–
ViewerTM to access the Electronic
(2) courier, express mail, or expedited 397–4209, 301–415–4737, or by e-mail
Information Exchange (EIE), a
component of the E-Filing system. The delivery service to the Office of the to pdr@nrc.gov.
Workplace Forms ViewerTM is free and Secretary, Sixteenth Floor, One White Dated at Rockville, Maryland, this 14th day
is available at http://www.nrc.gov/site- Flint North, 11555 Rockville, Pike, of February 2008.
help/e-submittals/install-viewer.html. Rockville, Maryland 20852, Attention: For the Nuclear Regulatory Commission.
Information about applying for a digital Rulemaking and Adjudications Staff. Balwant K. Singal,
ID certificate is available on NRC’s Participants filing a document in this Senior Project Manager, Plant Licensing
public Web site at http://www.nrc.gov/ manner are responsible for serving the Branch IV, Division of Operating Reactor
site-help/e-submittals/apply- document on all other participants. Licensing, Office of Nuclear Reactor
certificates.html. Once a petitioner/ Filing is considered complete by first- Regulation.
requestor has obtained a digital ID class mail as of the time of deposit in [FR Doc. E8–3284 Filed 2–20–08; 8:45 am]
certificate, had a docket created, and the mail, or by courier, express mail, or BILLING CODE 7590–01–P
downloaded the EIE viewer, it can then expedited delivery service upon
submit a request for hearing or petition depositing the document with the
for leave to intervene. Submissions provider of the service. NUCLEAR REGULATORY
should be in Portable Document Format Non-timely requests and/or petitions COMMISSION
(PDF) in accordance with NRC guidance and contentions will not be entertained
absent a determination by the [Docket Nos.: 52–014 and 52–015]
available on the NRC public Web site at
http://www.nrc.gov/site-help/e- Commission, the presiding officer, or Tennessee Valley Authority; Bellefonte
submittals.html. A filing is considered the Atomic Safety and Licensing Board Nuclear Plant, Units 3 and 4; Notice of
complete at the time the filer submits its that the petition and/or request should Intent To Prepare an Environmental
documents through EIE. To be timely, be granted and/or the contentions Impact Statement and Conduct
an electronic filing must be submitted to should be admitted, based on a
pwalker on PROD1PC71 with NOTICES

Scoping Process
the EIE system no later than 11:59 p.m. balancing of the factors specified in 10
Eastern Time on the due date. Upon CFR 2.309(c)(1)(i)–(viii). To be timely, The Tennessee Valley Authority
receipt of a transmission, the E-Filing filings must be submitted no later than (TVA) has submitted an application for
system time-stamps the document and 11:59 p.m. Eastern Time on the due combined licenses (COLs) to build units
sends the submitter an e-mail notice date. 3 and 4 at its Bellefonte Nuclear Plant