Sie sind auf Seite 1von 5

Check List for Piping Layouts

Page 1 of 5

MicroStation - Free Trial


bentley.com
The Most Interoperable CAD Platform is Now Available for a Free Trial.

Home
Valve
Piping Components
Piping layout
Pipe fittings
Forum
Gas Piping

Piping Jobs

Piping Engineer

Engineering Jobs

Check List for Piping Layouts


By A JAD
Upload Resume@TimesJobs
timesjobs.com/CareerChoices
Exp: 3 to 13 Yrs. Sal: 4L to 13L PA Search Great Work Places Now.
Hurry

Project Name:

Job No.:

Client:
Drawing No. :

Date : DD/MM/YYYY

Drawing Title : PIPING GENERAL ARRANGEMENT DRAWING


Notes:
1. This checklist is intended for checking of layout drawings extracted from 3D CAD models.
2. As a minimum, the checklist shall be completed for the first issue of the layout drawing.
3. Items like F&G detectors and other E, I & T items (e.g. JBs, switch boards, lighting fittings, etc.) need
not be shown in Piping Layouts.
Sr.
No

Check Points

Y/N Remarks

DESIGN
1

Plant North is shown.

Grade and paving levels and paving extents are shown. (Dimensions of paving not
required.)

Equipment and instrument tag nos. are indicated as per P&ID.

All equipments are shown with locating coordinates/dimensions and elevations


(centerline, BTL, u/s of base plate, etc.).

All equipment nozzles and vendor package terminal points are clearly identified and
tagged.

All tie-in points and battery limits are clearly identified and tagged and
coordinates/elevations are indicated.

http://www.piping-engineering.com/check-list-for-piping-layouts.html

18/03/2014

Check List for Piping Layouts

All lines are identified by line numbers and major locating dimensions & elevation are
given.

Flow directions and slope symbols are indicated as per the P&IDs.

All secondary pipe supports (standard & special) are indicated and tagged and the
locating dimensions marked.

10

All primary pipe supports are identified by appropriate symbols (e.g. guide, axial stop,
etc.).

11

Laydown/dropdown areas, space for exchanger tube removal and maintenance access
areas are identified.

12

All buildings/shelters/technological structures are located with


coordinates/dimensions. Names/tag nos and overall dimensions are given.

13

Structural grid numbers of pipe racks, buildings and shelters are shown.

14

Piperacks and sleepers are shown with locating coordinates/dimensions, widths, TOS
elevations and tag numbers (if applicable).

15

The cross sections of piperacks, multi-level technological structures, culverts, etc., are
shown wherever required.

16

All platforms and ladders/staircases are located with dimensions and elevations are
marked.

Page 2 of 5

DRAFTING
17

The drawing border conforms to the Project specifications or Company standards, as


applicable.

18

Drafting conventions e.g. font types/sizes, text styles, line types, coordinate/dimension
styles, layer structure, etc. are as per the Project specifications or Company CAD
standards, as applicable.

19

Drawing title, drawing number and revision number in the title block are as per the
TDR.

20

Electronic file name is indicated at appropriate location on the drawing.

21

Revision block contains initials of the originator, checker and approver (both
Discipline & Project).

22

Drawing scale is stated in the title block and graphic scale (bar scale) is shown.

23

The drawing scale conforms to the Project specifications or Company standards, as


applicable.

24

All general notes are checked and the units for dimensions, coordinates & levels are
given in the notes.

25

Legend for applicable symbols is shown (e.g. pipe supports, new/existing facilities,
demolition, scope cloud, etc.).

26

Reference drawing numbers and titles are listed and checked. List shall include unit
plot plan and piping key plan as a minimum.

27

Status stamp (e.g. For Construction) is shown.

28

Revision clouds, along with revision number triangles are marked properly, if
applicable.

29

Hold clouds, if applicable, are properly marked and the list of Holds is indicated.

30

Key plan is shown and the applicable area/unit of the plot plan is highlighted.

http://www.piping-engineering.com/check-list-for-piping-layouts.html

18/03/2014

Check List for Piping Layouts

Page 3 of 5

31

Match line co-ordinates and drawing limits are clearly marked and are consistent with
the Key Plan drawing. Continuation drawing numbers are correctly written.

32

Drawing extracted from 3D CAD model is not manually edited.


Prepared By

Checked By

Back Checked By

Final Checked By

Name:
Designation:
Revision number:
Date:

Submit Your Resume


shine.com/Urgent_Jobs
Exp 3 - 15 Yrs. Salary 5 - 20 Lakhs To Apply
Register on Shine.com Now

Plant Design Solutions


image-grafix.com
Piping, Plant Design & CAD/CAM/CAE Eng.
Software, Solutions & Services

Submit Resume Now


monsterindia.com
Immediate Requirement. Sign up to Apply &
Find Jobs

Related Posts:
Check List for Piping Unit Plot Plan Project Name: Job No.: Client: Drawing No. : Date :
DD/MM/YYYY Drawing Title : UNIT ...
Check List for Piping Material Take-Off (MTO) Check List for Piping Material Take-Off (MTO) Project
Name: Job No.: Notes:1. This ...
Scope of Piping: Inputs and Outputs Table of contents: Inputs to piping discipline Outputs from piping
discipline While designing ...
Checklist For Helideck Design In Offshore Platform CHECKLIST FOR HELIDECK DESIGN IN
OFFHORE PLATFORM Note: 1. This Checklist is ...
Pipe Material Procurement Process for an Oil and Gas Project Many equipments and items need to be
purchased in the ...

Leave a Reply
Mott MacDonald
Internet Access Notification
Per company policy you have been denied access
to the URL:
https://www.facebook.com/plugins/comments.php?

http://www.piping-engineering.com/check-list-for-piping-layouts.html

18/03/2014

Check List for Piping Layouts

Page 4 of 5

Piping engineering

+ 137

Or reach me on ajonlineweb@gmail.com
Subscribe Updates. It's Free!
Your email:
Enter email address...

Subscribe

Google+

Recent Posts
Check List for Piping Layouts
5:48 am By Piping engineering
Project Name: Job No.: Client: Drawing No. : Date : DD/MM/YYYY Drawing Title : PIPING
GENERAL ARRANGEMENT DRAWING Notes: This checklist is intended for checking of Read
More
Check List for Piping Unit Plot Plan
11:33 am By Piping engineering
Project Name: Job No.: Client: Drawing No. : Date : DD/MM/YYYY Drawing Title : UNIT PLOT
PLAN Notes: 1. As a minimum, the checklist shall be Read More
3D Modelling/Environment for Plant Design
3:19 pm By Piping engineering
3D modelling/environment for Plant Design: In todays design world, majority of the project are
executed using 3D environment. In 3D environment the project plant is modelled Read More

http://www.piping-engineering.com/check-list-for-piping-layouts.html

18/03/2014

Check List for Piping Layouts

Page 5 of 5

Check List for Piping Material Take-Off (MTO)


12:25 pm By Piping engineering
Check List for Piping Material Take-Off (MTO) Project Name: Job No.: Notes:1. This check list is
applicable exclusively for Detail design engineering.2. Some of the check Read More
Stress Analysis: Steps for Stress Analysis
2:29 pm By Piping engineering
1.0 Introduction to Stress Analysis Stress Analysis is a subject, which is more talked about and less
understood. The objective of pipe stress analysis is to ensure Read More
2014 Piping engineering

http://www.piping-engineering.com/check-list-for-piping-layouts.html

18/03/2014

Das könnte Ihnen auch gefallen