Federal Register / Vol. 73, No.

21 / Thursday, January 31, 2008 / Notices 5831

the party or parties directly involved in DEPARTMENT OF ENERGY To Know?’’ was attached to the project
the protest. notice Natural provided to landowners.
Federal Energy Regulatory This fact sheet addresses a number of
Persons who wish to comment only
Commission typically asked questions, including the
on the environmental review of this
project should submit an original and [Docket No. CP08–032–000] use of eminent domain and how to
participate in the Commission’s
two copies of their comments to the
Natural Gas Pipeline Company of proceedings. It is available for viewing
Secretary of the Commission.
America; Notice of Intent To Prepare on the FERC Internet Web site (http://
Environmental commentors will be www.ferc.gov).
an Environmental Assessment for the
placed on the Commission’s
Proposed Herscher-Galesville Summary of the Proposed Project
environmental mailing list, will receive
Expansion Project and Request for
copies of the environmental documents, Natural proposes to add new and
Comments on Environmental Issues
and will be notified of meetings modify existing natural gas storage
associated with the Commission’s January 25, 2008. facilities, and add new compression, at
environmental review process. The staff of the Federal Energy its existing Herscher Gas Storage Field
Environmental commentors will not be Regulatory Commission (FERC or near the town of Herscher, Illinois. The
required to serve copies of filed Commission) will prepare an purpose of this project is to increase the
documents on all other parties. environmental assessment (EA) that will storage field’s working gas capacity by
However, the non-party commentors discuss the environmental impacts of 10 billion cubic feet and increase the
will not receive copies of all documents the Herscher-Galesville Expansion peak day withdrawal capacity. Natural
filed by other parties or issued by the Project involving construction and would achieve this increased capacity
Commission (except for the mailing of operation of facilities by Natural Gas by constructing facilities to remove
environmental documents issued by the Pipeline Company of America (Natural) water from the Galesville formation part
Commission) and will not have the right in Kankakee County, Illinois.1 These of the storage field. Reworking of five
to seek court review of the facilities would consist of new water existing withdrawal/injection wells, and
withdrawal wells, new and extended construction of the new compressor
Commission’s final order.
water disposal wells, new water station addition within its existing
The Commission strongly encourages pipelines, one new compressor station adjacent Compressor Station 201, would
electronic filings of comments, protests addition, and extension of five existing enable Natural to increase peak day
and interventions in lieu of paper using natural gas injection/withdrawal wells. withdrawal capacity. Natural proposes
the ‘‘eFiling’’ link at http:// This EA will be used by the to:
www.ferc.gov. Persons unable to file Commission in its decision-making • Install 15 new water withdrawal
electronically should submit an original process to determine whether the wells with pumps;
and 14 copies of the protest or project is in the public convenience and • Install 11 new water disposal wells;
intervention to the Federal Energy necessity. • Install five water booster pumps at
Regulatory Commission, 888 First This notice announces the opening of existing water disposal wells;
Street, NE., Washington, DC 20426. the scoping process the Commission • Conduct up to four lateral
will use to gather input from the public extensions at existing water disposal
This filing is accessible on-line at wells;
and interested agencies on the project.
http://www.ferc.gov, using the • Conduct workover/extensions on
Your input will help determine which
‘‘eLibrary’’ link and is available for issues need to be evaluated in the EA. five existing natural gas injection/
review in the Commission’s Public Please note that the scoping period will withdrawal wells;
Reference Room in Washington, DC. close on February 4, 2008. Details on • Replace, loop or extend 12
There is an ‘‘eSubscription’’ link on the how to submit comments are provided waterlines with 8 13-inch-diameter
Web site that enables subscribers to in the Public Participation section of plastic pipe; and
receive e-mail notification when a this notice. • Construct a new 8,180 horsepower
document is added to a subscribed If you are a landowner receiving this (hp) gas-fired engine compressor station
docket(s). For assistance with any FERC notice, you may be contacted by a addition.
Online service, please e-mail pipeline company representative about Natural requests certification by July
FERCOnlineSupport@ferc.gov, or call the acquisition of an easement to 1, 2008, and expects to have the new
construct, operate, and maintain the water wells and associated water lines
(866) 208–3676 (toll free). For TTY, call
proposed facilities. The pipeline in service by April 1, 2009, followed by
(202) 502–8659.
company would seek to negotiate a compressor services in September of
Comment Date: February 8, 2008. 2009.
mutually acceptable agreement.
The location of the project facilities is
Kimberly D. Bose, However, if the project is approved by
shown in Appendix 1.2
Secretary. the Commission, that approval conveys
[FR Doc. E8–1738 Filed 1–30–08; 8:45 am] with it the right of eminent domain. Land Requirements for Construction
BILLING CODE 6717–01–P
Therefore, if easement negotiations fail Construction of the proposed facilities
to produce an agreement, the pipeline would require disturbance of 125 acres
company could initiate condemnation
proceedings in accordance with state 2 The appendices referenced in this notice are not
law. being printed in the Federal Register. Copies of all
A fact sheet prepared by the FERC appendices, other than Appendix 1 (maps), are
rwilkins on PROD1PC63 with NOTICES

entitled ‘‘An Interstate Natural Gas available on the Commission’s website at the
‘‘eLibrary’’ link or from the Commission’s Public
Facility On My Land? What Do I Need Reference Room, 888 First Street, NE., Washington,
DC 20426, or call (202) 502–8371. For instructions
1 Natural’s application was filed with the on connecting to eLibrary refer to the last page of
Commission under section 7 of the Natural Gas Act this notice. Copies of the appendices were sent to
and part 157 of the Commission’s regulations. all those receiving this notice in the mail.

VerDate Aug<31>2005 18:07 Jan 30, 2008 Jkt 214001 PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 E:\FR\FM\31JAN1.SGM 31JAN1
5832 Federal Register / Vol. 73, No. 21 / Thursday, January 31, 2008 / Notices

of land widely scattered around the In the EA we 3 will discuss impacts • Label one copy of the comments for
western, southern and eastern outskirts that could occur as a result of the the attention of Gas 2.
of the Town of Herscher. This includes construction and operation of the • Reference Docket No. CP08–032–
107 acres under construction right-of- proposed project under these general 000.
way that would be restored to previous headings: • Mail your comments so that they
land use following construction, and 18 • Geology and soils; will be received in Washington, DC on
acres under new permanent easement or • Water resources; or before February 25, 2008.
• Wetlands and fisheries; The Commission encourages
ownership. electronic filing of comments. See 18
• Vegetation and wildlife;
Natural would use eight existing well • Threatened and endangered Code of Federal Regulations
pads and 11 new well pads as staging species; 385.2001(a)(1)(iii) and the instructions
for horizontal directionally-drilling • Land use; on the Commission’s Internet Web site
(HDD) 15 new water withdrawal wells • Cultural resources; at http://www.ferc.gov under the
and 11 new disposal wells (11.3 acres of • Air quality and noise; ‘‘eFiling’’ link and the link to the User’s
construction work area). Natural would • Reliability and safety; and Guide. Prepare your submission in the
use the HDD method for the four lateral • Cumulative impacts. same manner as you would if filing on
extensions of water disposal wells, We will also evaluate reasonable paper and save it to a file on your hard
staged from existing well pad sites (0.9 alternatives to the proposed project or drive. Before you can file comments you
acres of construction work area). portions of the project, and make will need to create an account by
Extension of the five natural gas recommendations on how to lessen or clicking on ‘‘Login to File’’ and then
avoid impacts on the various resource ‘‘New User Account.’’ You will be asked
injection/withdrawal wells would be
areas. to select the type of filing you are
performed at existing well sites (1.2
Our independent analysis of the making. This filing is considered a
acres of construction work area). Natural ‘‘Comment on Filing.’’
would construct three new booster issues will be in the EA. Depending on
the comments received during the As described above, we may publish
pumps at three existing water disposal and distribute the EA for comment. If
scoping process, the EA may be
wells (1.4 acres of construction work you are interested in receiving an EA for
published and mailed to federal, state,
area). review and/or comment, please return
and local agencies, public interest
Natural would require virtually the groups, interested individuals, affected the Environmental Mailing List Form
entire 83-acre Compressor Station 201 landowners, newspapers, libraries, and (Appendix 3). If you do not return the
property as construction work areas, the Commission’s official service list for Environmental Mailing List Form, you
including staging, for installation of the this proceeding. A comment period will will be taken off the mailing list.
compressor station facility additions. be allotted for review if the EA is Becoming an Intervenor
Natural plans to use a 50-foot-wide published. We will consider all
In addition to involvement in the EA
construction right-of-way for comments on the EA before we make
scoping process, you may want to
installation of the waterlines, and would our recommendations to the
become an official party to the
retain the full 50 feet as permanent Commission.
proceeding, or ‘‘intervenor’’. To become
right-of-way for operation. This right-of- To ensure your comments are
an intervenor you must file a motion to
way would occur as looping, considered, please carefully follow the
intervene according to Rule 214 of the
replacement, or along new alignments, instructions in the public participation
Commission’s Rules of Practice and
and would require 27 acres of section below.
Procedure (18 CFR 385.214). Intervenors
construction work area. Public Participation have the right to seek rehearing of the
The EA Process You can make a difference by Commission’s decision. Motions to
providing us with your specific Intervene should be electronically
The National Environmental Policy comments or concerns about the project. submitted using the Commission’s
Act (NEPA) requires the Commission to By becoming a commentor, your eFiling system at http://www.ferc.gov.
take into account the environmental concerns will be addressed in the EA Persons without Internet access should
impacts that could result from an action and considered by the Commission. You send an original and 14 copies of their
whenever it considers the issuance of a should focus on the potential motion to the Secretary of the
Certificate of Public Convenience and environmental effects of the proposal, Commission at the address indicated
Necessity. NEPA also requires us to alternatives to the proposal (including previously. Persons filing Motions to
discover and address concerns the alternative locations/routes), and Intervene on or before the comment
public may have about proposals. This measures to avoid or lessen deadline indicated above must send a
process is referred to as ‘‘scoping’’. The environmental impact. The more copy of the motion to the Applicant. All
main goal of the scoping process is to specific your comments, the more useful filings, including late interventions,
focus the analysis in the EA on the they will be. Please carefully follow submitted after the comment deadline
important environmental issues. By this these instructions to ensure that your must be served on the Applicant and all
comments are received in time and other intervenors identified on the
Notice of Intent, the Commission staff
properly recorded: Commission’s service list for this
requests public comments on the scope
• Send an original and two copies of proceeding. Persons on the service list
of the issues to address in the EA. All
your letter to: Kimberly D. Bose, with e-mail addresses may be served
comments received are considered
Secretary, Federal Energy Regulatory electronically; others must be served a
during the preparation of the EA. State hard copy of the filing.
rwilkins on PROD1PC63 with NOTICES

and local government representatives Commission, 888 First St., NE., Room
Affected landowners and parties with
are encouraged to notify their 1A, Washington, DC 20426.
environmental concerns may be granted
constituents of this proposed action and intervenor status upon showing good
3 ‘‘We’’, ‘‘us’’, and ‘‘our’’ refer to the
encourage them to comment on their environmental staff of the Office of Energy Projects cause by stating that they have a clear
areas of concern. (OEP). and direct interest in this proceeding

VerDate Aug<31>2005 18:07 Jan 30, 2008 Jkt 214001 PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 E:\FR\FM\31JAN1.SGM 31JAN1
Federal Register / Vol. 73, No. 21 / Thursday, January 31, 2008 / Notices 5833

which would not be adequately formal documents issued by the Commission) will prepare an
represented by any other parties. You do Commission, such as orders, notices, environmental assessment (EA) that will
not need intervenor status to have your and rulemakings. identify and address the environmental
environmental comments considered. In addition, the Commission now impacts that could result from the
offers a free service called eSubscription construction and operation of the
Environmental Mailing List which allows you to keep track of all Sheyenne Expansion Project proposed
An effort is being made to send this formal issuances and submittals in by Williston Basin Interstate Pipeline
notice to all individuals, organizations, specific dockets. This can reduce the Company (Williston Basin). The EA will
and government entities interested in amount of time you spend researching
be used by the Commission in its
and/or potentially affected by the proceedings by automatically providing
decision-making process to determine
proposed project. This includes all you with notification of these filings,
document summaries and direct links to whether the project is in the public
landowners who are potential right-of-
way grantors, whose property may be the documents. Go to http:// convenience and necessity.
used temporarily for project purposes, www.ferc.gov/esubscribenow.htm. This notice announces the opening of
or who own homes within distances Finally, public meetings or site visits the scoping process the Commission
defined in the Commission’s regulations will be posted on the Commission’s will use to gather input from the public
of certain aboveground facilities. By this calendar located at http://www.ferc.gov/ and interested agencies on the project.
notice we are also asking governmental EventCalendar/EventsList.aspx along Your input will help determine which
agencies, especially those in Appendix with other related information. issues need to be evaluated in the EA.
2, to express their interest in becoming Kimberly D. Bose, Please note that the scoping period for
cooperating agencies for the preparation Secretary. this Notice will close on February 25,
of the EA. 2008. Details on how to submit
[FR Doc. E8–1737 Filed 1–30–08; 8:45 am]
Additional Information BILLING CODE 6717–01–P comments are provided in the Public
Participation section of this notice.
Additional information about the
project is available from the Additionally, as part of the scoping
DEPARTMENT OF ENERGY process, we will also have a public site
Commission’s Office of External Affairs,
at 1–866–208–FERC (3372) or on the Federal Energy Regulatory visit at the locations described below, to
FERC Internet Web site (http:// Commission receive comments on the proposed
www.ferc.gov) using the eLibrary link. project. Please note that attendees at the
Click on the eLibrary link, click on [Docket No. PF08–4–000] site visit must obtain their own
‘‘General Search’’ and enter the docket transportation for the site visit.
Williston Basin Interstate Pipeline
number excluding the last three digits
Company; Notice of Intent To Prepare
(i.e., enter PF06–398) in the Docket an Environmental Assessment for the
Number field. Be sure you have selected Proposed Sheyenne Expansion
an appropriate date range. For Project, Request for Comments on
assistance, please contact FERC Online Environmental Issues, and Notice of
Support at Public Site Visit
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY, January 25, 2008.
contact (202) 502–8659. The eLibrary The staff of the Federal Energy
link also provides access to the texts of Regulatory Commission (FERC or

Date and time Location

8 a.m., February 6, 2008 ................................... Governor’s Inn Parking Lot, 2050 Governors Dr, Casselton, ND 58012.
1 p.m., February 6, 2008 ................................... Lone Steer Hotel Parking Lot, I–94 & Hwy #3N, Exit 200, Steele, ND 58012.
3 p.m., February 6, 2008 ................................... Bismarck Compressor Station, 850 57th Ave NW., Bismarck, ND 58503.

This notice is being sent to affected would seek to negotiate a mutually and how to participate in the FERC’s
landowners; federal, state, and local acceptable agreement. However, if the proceedings.
government agencies; elected officials; project is approved by the FERC, that Summary of the Proposed Project
environmental and public interest approval conveys with it the right of
groups; Native American tribes; other eminent domain. Therefore, if easement Williston Basin proposes to construct
interested parties; and local libraries negotiations fail to produce an the new Steele Compressor Station in
and newspapers; all of which are Kidder County, North Dakota; install
agreement, the pipeline company could
encouraged to submit comments on the additional compression at the existing
initiate condemnation proceedings in
Bismark Compressor Station in Burleigh
proposed project. Details on how to accordance with state law. County, North Dakota; undertake minor
submit comments are provided in the A fact sheet prepared by the FERC modifications to the existing Cleveland
Public Participation section of this entitled ‘‘An Interstate Natural Gas Compressor Station Stutsman County,
notice. Facility on My Land? What Do I Need North Dakota; and construct and operate
If you are a landowner receiving this To Know?’’ is available for viewing on approximately 6,400 feet of 8-inch-
rwilkins on PROD1PC63 with NOTICES

notice, you may be contacted by a the FERC Internet Web site (http:// diameter pipeline lateral and metering
Williston Basin representative about the www.ferc.gov). This fact sheet addresses facilities to connect to the proposed
acquisition of an easement to construct, a number of typically asked questions, Tharaldson ethanol plant in Cass
operate, and maintain the proposed including the use of eminent domain County, North Dakota. The Project
project facilities. The pipeline company would increase firm capacity into