2284 Federal Register / Vol. 73, No.

9 / Monday, January 14, 2008 / Notices

Documents may be examined, and/or Isotope General Atomic (TRIGA) Mark II the probability or consequences of
copied for a fee, at the NRC’s Public nuclear research reactor located on the accidents. No changes are being made in
Document Room at One White Flint campus of the University of Illinois at the types of any effluents that may be
North, 11555 Rockville Pike (first floor), Champaign-Urbana in the city of released off site, and there will be no
Rockville, Maryland. Publicly available Urbana, Illinois. significant increase in occupational or
records will be accessible electronically By letters dated March 28, 2006 (See public radiation exposure above those
from the Agencywide Documents ADAMS ML060900623), and August 20, during the operation of the facility.
Access and Management System 2007 (See ADAMS ML072550089), the Therefore, the staff concludes that there
(ADAMS) Public Electronic Reading licensee submitted a Decommissioning are no significant radiological
Room on the Internet at the NRC Web Plan (DP) in accordance with 10 CFR environmental impacts associated with
site, http://www.nrc.gov/NRC/ADAMS/ 50.82(b)(1), in order to dismantle the the proposed action.
index.html. If you do not have access to TRIGA Reactor, to dispose of its
component parts and radioactive II. Opportunity to Request a Hearing
ADAMS or if you have problems in
accessing the documents in ADAMS, material, and to decontaminate the The NRC hereby provides notice that
contact the NRC Public Document Room facilities in accordance with the this is a proceeding on an application
(PDR) reference staff at 1–800–397–4209 proposed DP to meet the Commission’s for a license amendment regarding the
or 301–415–4737 or by e-mail to unrestricted release criteria. After the decommissioning of the University of
pdr@nrc.gov. Commission verifies that the release Illinois NRL test reactor. Any person
criteria have been met, Facility whose interest may be affected by this
Dated at Rockville, Maryland, this 21st day proceeding and who desires to
Operating License No. R–115 will be
of December 2007.
terminated. participate as a party must file a request
For the Nuclear Regulatory Commission. The University of Illinois ceased for a hearing and, a specification of the
Thomas W. Alexion, operations of the NRL TRIGA reactor on contentions which the person seeks to
Acting Chief, Generic Communications August 6, 1998, and it was placed in a have litigated in the hearing, in
Branch, Division of Policy and Rulemaking, Safe Storage (SAFSTOR) condition. On accordance with the NRC E-Filing rule,
Office of Nuclear Reactor Regulation. August 18, 2004, the reactor fuel was which the NRC promulgated in August,
[FR Doc. E8–424 Filed 1–11–08; 8:45 am] removed and shipped to the U.S. 2007, 72 FR 49139 (Aug. 28, 2007). The
BILLING CODE 7590–01–P Department of Energy’s Idaho National E-Filing rule requires participants to
Laboratory. submit and serve documents over the
A ‘‘Notice and Solicitation of internet or in some cases to mail copies
NUCLEAR REGULATORY Comments Pursuant to 10 CFR 20.1405 on electronic storage media. Participants
COMMISSION and 10 CFR 50.82(b)(5) Concerning may not submit paper copies of their
[Docket No. 50–151] Proposed Action to Decommission the filings unless they seek a waiver in
University of Illinois at Urbana- accordance with the procedures
Notice of the Issuance of License Champaign Nuclear Reactor Laboratory’’ described below.
Amendment No. 15 for the University was published in the Federal Register To comply with the procedural
of Illinois Nuclear Research Laboratory on August 1, 2006 (71 FR 43528), and requirements of E-Filing, at least five (5)
Triga Research Reactor and the in the Champaign County, Illinois daily days prior to the filing deadline, the
Opportunity To Request a Hearing newspaper, The News-Gazette, on petitioner/requestor must contact the
August 3, 2006. No comments were Office of the Secretary by e-mail at
AGENCY: U.S. Nuclear Regulatory received. HEARINGDOCKET@NRC.GOV, or by
Commission. The University of Illinois is planning calling (301) 415–1677, to request (1) a
ACTION: Notice of the issuance of license unrestricted use for the area that would digital identification (ID) certificate,
amendment No. 15 and the opportunity be released. The NRC Final Rule on which allows the participant (or its
to request a hearing. License Termination, 10 CFR 20.1402, counsel or representative) to digitally
provides radiological criteria for release sign documents and access the E-
DATES: A request for a hearing must be of a site for unrestricted use. Release Submittal server for any proceeding in
filed by March 10, 2008. criteria for unrestricted use is a which it is participating; and/or (2)
FOR FURTHER INFORMATION CONTACT: maximum Total Effective Dose creation of an electronic docket for the
Thomas McLaughlin, Project Manager, Equivalent (TEDE) of 25 mrem per year proceeding (even in instances in which
Materials Decommissioning Branch, from residual radioactivity above the petitioner/requestor (or its counsel
Division of Waste Management and background and doses as low as or representative) already holds an NRC-
Environmental Protection, Office of reasonably achievable (ALARA). The issued digital ID certificate). Each
Federal and State Materials and results of the final status survey will be petitioner/requestor will need to
Environmental Management Programs, used to demonstrate that the predicted download the Workplace Forms
U.S. Nuclear Regulatory Commission, dose to a member of the public from any ViewerTM to access the Electronic
Washington, DC 20555. Telephone: residual radioactivity does not exceed Information Exchange (EIE), a
(301) 415–5869; fax number: (301) 415– the 25 mrem per year dose limit. The component of the E-Filing system. The
5369; e-mail: tgm@nrc.gov. NRC will perform inspections and if Workplace Forms ViewerTM is free and
SUPPLEMENTARY INFORMATION: necessary a confirmatory survey to is available at http://www.nrc.gov/site-
verify that the decommissioning help/e-submittals/install-viewer.html.
I. Introduction activities and the final status survey Information about applying for a digital
The Nuclear Regulatory Commission results are acceptable. ID certificate is available on NRC’s
(NRC) has issued a license amendment Based on the review of the specific public Web site at http://www.nrc.gov/
rmajette on PROD1PC64 with NOTICES

to Facility Operating License R–115 that proposed activities associated with the site-help/e-submittals/apply-
allows decommissioning of the dismantling and decontamination of the certificates.html.
University of Illinois’s (University’s or NRL, which includes the TRIGA Once a petitioner/requestor has
licensee’s) Nuclear Research Laboratory Reactor, the staff has determined that obtained a digital ID certificate, had a
(NRL) Advanced Teaching Research the proposed action will not increase docket created, and downloaded the EIE

VerDate Aug<31>2005 15:22 Jan 11, 2008 Jkt 214001 PO 00000 Frm 00073 Fmt 4703 Sfmt 4703 E:\FR\FM\14JAN1.SGM 14JAN1
Federal Register / Vol. 73, No. 9 / Monday, January 14, 2008 / Notices 2285

viewer, it can then submit a request for depositing the document with the 1. Provide a specific statement of the
hearing or petition for leave to provider of the service. issue of law or fact to be raised or
intervene. Submissions should be in Non-timely requests and/or petitions controverted;
Portable Document Format (PDF) in and contentions will not be entertained 2. Provide a brief explanation of the
accordance with NRC guidance absent a determination by the basis for the contention;
available on the NRC public Web site at Commission, the presiding officer, or 3. Demonstrate that the issue raised in
http://www.nrc.gov/site-help/e- the Atomic Safety and Licensing Board the contention is within the scope of the
submittals.html. A filing is considered that the petition and/or request should proceeding;
complete at the time the filer submits its be granted and/or the contentions 4. Demonstrate that the issue raised in
documents through EIE. To be timely, should be admitted based on a the contention is material to the
an electronic filing must be submitted to balancing of the factors specified in 10 findings that the NRC must make to
the EIE system no later than 11:59 p.m. CFR 2.309(c)(1)(i)–(c)(1)(viii). To be support the action that is involved in
Eastern Standard Time on the due date. timely, filings must be submitted no the proceeding;
Upon receipt of a transmission, the E- later than 11:59 p.m. Eastern Standard 5. Provide a concise statement of the
Filing system time-stamps the document Time on the due date. alleged facts or expert opinions which
and sends the submitter an e-mail notice Documents submitted in adjudicatory support the requester’s/petitioner’s
confirming receipt of the document. The proceedings will appear in NRC’s position on the issue and on which the
EIE system also distributes an e-mail electronic hearing docket which is requester/petitioner intends to rely to
notice that provides access to the available to the public at http:// support its position on the issue; and
document to the NRC Office of the ehd.nrc.gov/EHD_Proceeding/home.asp, 6. Provide sufficient information to
General Counsel and any others who unless excluded pursuant to an order of show that a genuine dispute exists with
have advised the Office of the Secretary the Commission, an Atomic Safety and the applicant on a material issue of law
that they wish to participate in the Licensing Board, or a Presiding Officer. or fact. This information must include
proceeding, so that the filer need not Participants are requested not to include references to specific portions of the
serve the documents on those social security numbers in their filings. application (including the applicant’s
participants separately. Therefore, Copyrighted works, except for limited environmental report and safety report)
applicants and other participants (or excerpts that serve the purpose of the that the requester/petitioner disputes
their counsel or representative) must adjudicatory filings and would and the supporting reasons for each
apply for and receive a digital ID constitute a Fair Use application, should dispute, or, if the requester/petitioner
certificate before a hearing request/ not be included in the submission. believes the application fails to contain
petition to intervene is filed so that they The formal requirements for information on a relevant matter as
can obtain access to the document via documents contained in 10 CFR required by law, the identification of
the E-Filing system. 2.304(c)–(e) must be met. If the NRC each failure and the supporting reasons
A person filing electronically may
grants an electronic document for the requester’s/petitioner’s belief.
seek assistance through the ‘‘Contact
exemption in accordance with 10 CFR In addition, in accordance with 10
Us’’ link located on the NRC Web site
2.302(g)(3), then the requirements for CFR 2.309(f)(2), contentions must be
at http://www.nrc.gov/site-help/e-
paper documents, set forth in 10 CFR based on documents or other
submittals.html or by calling the NRC
2.304(b) must be met. information available at the time the
technical help line, which is available
In accordance with 10 CFR 2.309(b), petition is to be filed, such as the
between 8:30 a.m. and 4:15 p.m.,
a request for a hearing must be filed by application, supporting safety analysis
Eastern Time, Monday through Friday.
The help line number is (800) 397–4209 March 10, 2008. report, environmental report or other
or locally, (301) 415–4737. In addition to meeting other supporting document filed by an
Participants who believe that they applicable requirements of 10 CFR applicant or licensee, or otherwise
have a good cause for not submitting 2.309, the general requirements available to the petitioner. On issues
documents electronically must file a involving a request for a hearing filed by arising under the National
motion, in accordance with 10 CFR a person other than an applicant must Environmental Policy Act, the
2.302(g), with their initial paper filing state: requester/petitioner shall file
requesting authorization to continue to 1. The name, address, and telephone contentions based on the applicant’s
submit documents in paper format. number of the requester; environmental report. The requester/
Such filings must be submitted by: (1) 2. The nature of the requester’s right petitioner may amend those contentions
First class mail addressed to the Office under the Act to be made a party to the or file new contentions if there are data
of the Secretary of the Commission, U.S. proceeding; or conclusions in the NRC draft or final
Nuclear Regulatory Commission, 3. The nature and extent of the environmental impact statement; and
Washington, DC 20555–0001, Attention: requester’s property, financial or other environmental assessment or any
Rulemaking and Adjudications Staff; or interest in the proceeding; supplements relating thereto, that differ
(2) courier, express mail, or expedited 4. The possible effect of any decision significantly from the data or
delivery service to the Office of the or order that may be issued in the conclusions in the applicant’s
Secretary, Sixteenth Floor, One White proceeding on the requester’s interest; documents. Otherwise, contentions may
Flint North, 11555 Rockville, Pike, and be amended or new contentions filed
Rockville, Maryland, 20852, Attention: 5. The circumstances establishing that after the initial filing only with leave of
Rulemaking and Adjudications Staff. the request for a hearing is timely in the presiding officer.
Participants filing a document in this accordance with 10 CFR 2.309(b). Each contention shall be given a
manner are responsible for serving the In accordance with 10 CFR 2.309(f)(1), separate numeric or alpha designation
rmajette on PROD1PC64 with NOTICES

document on all other participants. a request for hearing or petitions for within one of the following groups:
Filing is considered complete by first- leave to intervene must set forth with 1. Technical—primarily concerns
class mail as of the time of deposit in particularity the contentions sought to issues relating to matters discussed or
the mail, or by courier, express mail, or be raised. For each contention, the referenced in the Safety Evaluation
expedited delivery service upon request or petition must: Report for the proposed action.

VerDate Aug<31>2005 15:22 Jan 11, 2008 Jkt 214001 PO 00000 Frm 00074 Fmt 4703 Sfmt 4703 E:\FR\FM\14JAN1.SGM 14JAN1
2286 Federal Register / Vol. 73, No. 9 / Monday, January 14, 2008 / Notices

2. Environmental—primarily concerns (ADAMS), which provides text and The NRC Commission Meeting
issues relating to matters discussed or image files of NRC(s public documents. Schedule can be found on the Internet
referenced in the Environmental Report These documents may be accessed at: http://www.nrc.gov/about-nrc/policy-
for the proposed action. through the NRC(s Public Electronic making/schedule.html.
3. Emergency Planning—primarily Reading Room on the internet at http:// The NRC provides reasonable
concerns issues relating to matters www.nrc.gov. accommodation to individuals with
discussed or referenced in the Persons who do not have access to disabilities where appropriate. If you
Emergency Plan as it relates to the ADAMS or who have problems in need a reasonable accommodation to
proposed action. accessing the documents located in participate in these public meetings, or
4. Physical Security—primarily ADAMS may contact the PDR reference need this meeting notice or the
concerns issues relating to matters staff at 1–800–397–4209, 301–415–4737 transcript or other information from the
discussed or referenced in the Physical or by e-mail at pdr@nrc.gov. public meetings in another format (e.g.,
Security Plan as it relates to the braille, large print), please notify the
Dated at Rockville, Maryland, this 2nd day
proposed action. of January, 2008. NRC’s Disability Program Coordinator,
5. Miscellaneous—does not fall into Rohn Brown, at 301–415–2279, TDD:
For the Nuclear Regulatory Commission.
one of the categories outlined above. 301–415–2100, or by e-mail at
If the requester/petitioner believes a Keith I. McConnell,
REB3@nrc.gov. Determinations on
contention raises issues that cannot be Deputy Director, Decommisssioning and
requests for reasonable accommodation
classified as primarily falling into one of Uranium Recovery Licensing Directorate,
Division of Waste Management and will be made on a case-by-case basis.
these categories, the requester/petitioner This notice is distributed by mail to
Environmental Protection, Office of Federal
must set forth the contention and and State Materials and Environmental several hundred subscribers; if you no
supporting bases, in full, separately for Management Programs. longer wish to receive it, or would like
each category into which the requester/ [FR Doc. E8–418 Filed 1–11–08; 8:45 am] to be added to the distribution, please
petitioner asserts the contention belongs contact the Office of the Secretary,
BILLING CODE 7590–01–P
with a separate designation for that Washington, DC 20555 (301–415–1969).
category. In addition, distribution of this meeting
Requesters/petitioners should, when NUCLEAR REGULATORY notice over the Internet system is
possible, consult with each other in COMMISSION available. If you are interested in
preparing contentions and combine receiving this Commission meeting
similar subject matter concerns into a Sunshine Act Meeting; Notice schedule electronically, please send an
joint contention, for which one of the electronic message to dkw@nrc.gov.
co-sponsoring requesters/petitioners is Agency Holding the Meetings: Nuclear Dated: January 7, 2008.
designated the lead representative. Regulatory Commission.
R. Michelle Schroll,
Further, in accordance with 10 CFR
DATES: Week of January 14, 2008. Office of the Secretary.
2.309(f)(3), any requester/petitioner that
wishes to adopt a contention proposed PLACE: Commissioners’ Conference [FR Doc. 08–106 Filed 1–10–08; 2:15 pm]
by another requester/petitioner must do Room, 11555 Rockville Pike, Rockville, BILLING CODE 7590–01–P

so, in accordance with the E-Filing rule, Maryland.


within ten days of the date the STATUS: Public and Closed.
NUCLEAR REGULATORY
contention is filed, and designate a ADDITIONAL MATTERS TO BE CONSIDERED:
COMMISSION
representative who shall have the
Week of January 14, 2008
authority to act for the requester/ AREVA NP Inc.; Notice of Receipt of
petitioner. Monday, January 14, 2008 Application for Design Certification of
In accordance with 10 CFR 2.309(g), 10 a.m. the U.S. EPR
a request for hearing and/or petition for Discussion of Adjudicatory Issues
leave to intervene may also address the (Closed—Ex.10). Notice is hereby given that the
selection of the hearing procedures, Nuclear Regulatory Commission (NRC,
taking into account the provisions of 10 Tuesday, January 15, 2008 the Commission) has received an
CFR 2.310. 9:25 a.m. application from AREVA NP Inc.
Affirmation Session (Public Meeting) (AREVA) dated December 11, 2007,
III. Further Information filed pursuant to section 103 of the
a. PG&E Co. (Diablo Canyon ISFSI),
For further details with respect to the Docket No. 72–26–ISFSI, San Luis Atomic Energy Act and Title 10 of the
proposed action, see the licensee’s Obispo Mothers for Peace’s Code of Federal Regulations (10 CFR)
letters dated March 28, 2006 (See Contention and Request for Hearing Part 52, for standard design certification
ADAMS ML060900623), August 20, Re Diablo Canyon Environmental of the U.S. EPR Standard Plant Design.
2007 (See ADAMS ML072550089), the Assessment Supplement The U.S. EPR design is an
Environmental Assessment and Finding (Tentative). approximately 1600 megawatts electric
of No Significant Impact (See ADAMS b. Pilgrim Nuclear Power Station evolutionary pressurized water reactor
ML073020387), and the Safety License Renewal Pilgrim Watch’s (PWR). The primary system design, loop
Evaluation Report (See ADAMS Appeal of Interlocutory Board configuration, and main components
ML073330022), which are available for Order Summarily Disposing of design are similar to those of currently
public inspection, and can be copied for Contention 3 (SAMAs) (LBP–07– operating PWRs. The U.S. EPR contains
a fee, at the U.S. Nuclear Regulatory 13). unique design features, such as four
Commission’s Public Document Room *The schedule for Commission redundant trains of emergency core
rmajette on PROD1PC64 with NOTICES

(PDR), located at One White Flint North, meetings is subject to change on short cooling; Containment and Shield
11555 Rockville Pike (first floor), notice. To verify the status of meetings Building, and a core melt retention
Rockville, Maryland 20852. The NRC call (recording)—(301) 415–1292. system for severe accident mitigation.
maintains an Agency-wide Documents Contact person for more information: The U.S. EPR application includes the
Access and Management System Michelle Schroll, (301) 415–1662. entire power generation complex,

VerDate Aug<31>2005 15:22 Jan 11, 2008 Jkt 214001 PO 00000 Frm 00075 Fmt 4703 Sfmt 4703 E:\FR\FM\14JAN1.SGM 14JAN1

Das könnte Ihnen auch gefallen