INPUTS

DATE OF INSPECTION

ADMN. SANCTION

NAME OF THE WORK

EXECUTING AGENCY

NAME OF THE MANDAL

GRANT

ESTIMATE COST

PACKAGE COST

ESTIMATE SANCTIONED

10 AGREEMENT NO.
11 EST.CONTRACT VALUE
12 AGREEMENT CONTRACT VALUE
13 TENDER PERCENTAGE
14 CONTRACTING AGENCY
15 DATE OF HANDING OVER THE SITE
16 DATE FIXED FOR COMPLETION
17 AGREEMENT PERIOD
18 EXTENTION OF TIME
19 STAGE OF WORK
20 ITEMS INSPECTED
21 Name of the Officers executed the work :
a) Executive Engineer

b) Dy. Executive Engineer

c) Asst.Exe. Engineer

22 Name of the Officers inspecting the work :


a) Executive Engineer

b) Dy. Executive Engineer

c) Asst.Exe. Engineer

INPUTS
NOT TO PRINT- FOR DATA ENTRY ONLY
30.10.2013
Proc.No.4365/CW/KGBV/Ph.V/2011-2012, Dt.28/07/2011 of State Project
Director RVM(SSA) Hyd.
Construction of KGBV School Building at Alagadapa in Miryalaguda Mandal
Executive Engineer RVM Nalgonda
Miryalaguda
SSA (KGBV)
Rs.125.00 Lakhs
Rs.125.00 Lakhs
CE RVM (SSA) Hyd.TS No.

/2011-12 dt

CE RVM (SSA) Hyd. Agr.No.

/2011-12 Dt.27.03.2012

Rs.11412928.00
Rs.11395809.00
0.15% Less than Estimate Rates.
DNR Constructions Private Limited, Ameerpet, Hyd.

VER THE SITE

9 Months
N/A
Completed & Occupied but some finishings left.
Foundations, RCC Columns & Beams, Brick Work, Doors & Windows, Roof
Slab, Impervious Coat, Painting, Flooring & General Observations.

rs executed the work :


Er.Rajendar , EE RVM Nlgd
Er.Keshav Rao, DyEE RVM Mlgd
Er.Swami Naik, AEE RVM Mlgd

rs inspecting the work :


Er.Y.Neelakanteshwar, DyEE VQC SD Nlgd
Er.Bhaskar Reddy, AEE VQC SD Nlgd

GOVERNMENT OF ANDHRA PRADESH


PANCHAYAT RAJ ENGINEERING DEPARTMENT

INSPECTION REPORT BY PR QUALITY


CONTROL WING
NALGONDA DISTRICT

DATE OF INSPECTION

:: 30.10.2013

NAME OF THE WORK

::

ESTIMATE COST

:: Rs.125.00 Lakhs

NAME OF THE GRANT

:: SSA (KGBV)

NAME OF THE MANDAL

:: Miryalaguda

EXECUTING AGENCY

:: Executive Engineer RVM Nalgonda

CONTRACTING AGENCY

::

DNR Constructions Private Limited,


Ameerpet, Hyd.

STAGE OF THE WORK

::

Completed & Occupied but some


finishings left.

ITEMS COVERED

Foundations, RCC Columns & Beams,


Brick Work, Doors & Windows, Roof
::
Slab,
Impervious
Coat,
Painting,
Flooring & General Observations.

Construction of KGBV School Building


at Alagadapa in Miryalaguda Mandal

Governament of Andhra Pradesh


Panchayati Raj Engineering Department
VIGILANCE & QUALITY CONTROL SUB-DIVISION:: NALGONDA
QC Ref.No: AEE2/PR(V&QC) Nlgd/RVM/Kukkadam/2013-14, date ::

INSPECTION REPORT
Name of the Work :-

Construction of KGBV School Building at Alagadapa


in Miryalaguda Mandal

Estimate Cost

Rs.125.00 Lakhs

:-

Date of Inspection : -

30.10.2013

Format (I) Preamble


The work Construction of KGBV School Building at Avantipuram
(Miryalaguda) in Miryalaguda Mandal of Nalgonda District sanctioned for an
estimate cost of Rs.125.00 lakhs and was inspected by the Panchayat Raj Vig & QC
Wing on dt. 30.10.2013.
The details of present inspections are as follows.
1a)
a)
b)
c)
1b)

Name of the Officers executed the work :


Executive Engineer
:
Dy. Executive Engineer :
Asst.Exe. Engineer
:

Er.Rajendar , EE RVM Nlgd


Er.Keshav Rao, DyEE RVM Mlgd
Er.Swami Naik, AEE RVM Mlgd

Name of the Officers inspecting the work :

a)
b)
c)

Executive Engineer
:
Dy. Executive Engineer :
Asst.Exe. Engineer
:

2
a)

Details of the Work


Admn.Sanction amount for the Package NRs.125.00 Lakhs

b)

Authourity

c)
d)
e)
f)

h)

Estimate Amount for the Package


Rs.125.00 Lakhs
Estimate Sanction No.
CE RVM (SSA) Hyd.TS No. /2011-12 dt
Estimate Contract Value for the Package Rs.11412928.00
Agreement Contract Value for the PackagRs.11395809.00
CE RVM (SSA) Hyd. Agr.No.
/
Agreement Number
2011-12 Dt.27.03.2012
Tender Percentage
0.15% Less than Estimate Rates.

i)

Name of the Contractor & Address

j)
k)

Date of handing over site


Date fixed for Completion

g)

Er.Y.Neelakanteshwar, DyEE VQC SD Nlgd


Er.Bhaskar Reddy, AEE VQC SD Nlgd

Proc.No.4365/CW/KGBV/Ph.V/20112012, Dt.28/07/2011 of State


Project Director RVM(SSA) Hyd.

DNR Constructions Private Limited,


Ameerpet, Hyd.

l)
m)

Agreement Period
Extension of Time granted, if any

9 Months
N/A

n)

M.Book References

594/2011-12,
211/2011-12,
582/2011-12, A/594/2011-12

3a

Name of the Officers of RVM present


during inspection

As above

3b

Names of the Officers of the 3rd party


QC Team from PR QC Wing present
during the inspection

As above

Financial Progress

The Value of Work done so far

Progress of work as per Schedule or not N/A

Physical Progress

The building is completed & occupied by the School Edn Dept.

6
a
b
7
i
ii
iii

The following observations are made during this inspection


Workman ship is good.
The detailed observations are made in the format 2.
Storage
Cement
Not verified. Work completed.
Steel
Not verified. Work completed.
Aggregates
Not verified. Work completed.

Review of the Quality Control Records maintained by Field


Engineers/ Contractor at site

The Quality Control register is maintained.

ii

The detailed observations are made in the format 2.

Asst.Executive Engineer-1,
(PR) Vig & QC Sub-Division, Nalgonda.

Rs.103.98 Lakhs

Dy.Executive Engineer (PR)


(PR) Vig & QC Sub-Division, Nalgonda.

To,
The Executive Engineer ,
RVM, Nalgonda for taking necessary action.
Submitted to the Executive Engineer (PR) Vigilance & Quality Control Division
Hyderabad for favour of information.

VQC SD Nlgd

2011-12 dt

Nalgonda.

Governament of Andhra Pradesh


Panchayati Raj Engineering Department
VIGILANCE & QUALITY CONTROL SUB-DIVISION:: NALGONDA
QC Ref.No: AEE2/PR(V&QC) Nlgd/RVM/Kukkadam/2013-14, date :: 30.10.2013

INSPECTION REPORT
Name of the Work :-

Construction of KGBV School Building at Alagadapa in


Miryalaguda Mandal

Estimate Cost

Rs.125.00 Lakhs

:-

Date of Inspection :

30.10.2013

Format (II) Details of Physical Measurements


Physical Measurements

The following items have been verified and the item wise remarks are as follow

I)
Sl.
No.

Foundation details by excavating trench on four corners of building


Name of the Item

Depth of Foundation

Thickness of Bed
Concrete

Thickness of Footing

Size of Footing

Height of Pedastal

As per design/
M.Book

Size of Pedastal
Height of C
7
R.S.Masonary
Thickness of Plinth
8
Beam
General Observations:-

As per
Observation

The Field Officers


are opened the B4
Column Footing but
could not verified
the
foundation
details
as
the
seepage water is
intruded into the
foundation as the
rain
water
was
stagnated
L/S
of
School Building.

300mm

300mm

II)

Remarks

RCC Columns and Beams :

i)

Verification of Strength of Columns &


Beams by Rebound Hammer :

ii)

Verification of CC Cubes Register :

iii)

Size of Columns & Beams :

iv)

Height of Columns & Span of Beams :

Verified.
Observation
sheet
enclosed.
( Annexure I)
QC Register is furnished by the field
staff and verified & found correct.
Verified randomnly.
Obsevation sheet enclosed.( Annexure
III)
Verified randomnly.
Obsevation sheet enclosed.( Annexure
III)

v)
vi)
vii)

viii)

Verification of Columns ( Line & Plumb) &


Verified at random and found
Straightness of Beams :
satisfactory.
Mix design particulars are not
Verification of Mix Design particulars :
furnished by the field staff for
verification.
As per test reports submitted ,
Type & Grade of Cement used as per M.Boocement used is Deccan OPC 53 grade
cement.
Verified.
Verification of data for CC items :
The Datas are prepared as per
Revised Strandard Data Book of A.P.
Test Reports for one consignement
are furnished by the field staff for
verification and are verified & OK.

ix)

Verification of consignment wise QC


reports for cement :

x)

Verification of consignment
reports for Steel :

xi)

Verification of aggregate impact value Lab Test reports are submitted and
test reports :
are verified found correct.

xii)

Verification of silt content reports of Sand :

wise

QC

Test Reports for one consignement


are furnished by the field staff for
verification and are verified & OK.

QC Register is furnished by the field


staff and verified.

General Observations:a

Line(Alignment) & Plumb of Columns are verified and satisfactory. No buckling of


Columns are observed.

Deflections and Cracks in RCC Beams are not observed.

III)
i)
ii)

Brick Masonry :
The Test reports of bricks for strength
are submitted by the field staff for
Verification of test reports of Bricks for Str
verification and are verified and found
correct.
Verification of test reports on water
-doobsorption of Bricks :

iii)

Verification of Mortar joints :

iv)

Verification of Plastering thickness :

v)

Plumb & Line verification of Wall :

vi)
vii)

Could not be verified as the plastering


to walls was completed.
Verified at random and found 12mm
thick for inside of walls and 20mm
thick for out side of walls.
Verified at random and found
satisfactory.

Provided. But at certain locations the


Grooves at Joints between RCC & Brick Wallfull
depth
grooves
(depth
of
Plastreing) are not observed.
Wall thickness, height & length w.r.t
Verified randomly.
M.book
Observation
sheet
enclosed
( Random verification as per plan) :
(Annexure IV).

viii)

Verification of wall paintings :

Verified.
Found satisfactory inside of the
building. The out side painting is
showing stains of distress and shaded
at certain places and white patches
are appeared.

General Observations:a

No cracks are observed in brick masonry.

The plumb and line of brick walls are satisfactory.


The ouside painting is shaded and white patches are observed at certain places.
As such it is recommanded to apply one coat painting outside the building at the
shaded area.

IV). Flooring:
i)
ii)
iii)
iv)

Workman ship :
Verification of Area/ Room dimension :
Type of Flooring provided w.r.t .
Sanctioned Estimate/ M.Book :
Thickness of Bed Concrete :

Average.
Verified.
Observation
sheet
enclosed.
(Annexure V)
Polished shabad tandur blue stone
flooring is provided as per sanctioned
Estimate.
Could not verified as it was concealed
under flooring.

General Observations:a

Joints of flooring are not true to line, joint spacings are a bit high.

The spacings are not properly filled with mortar and many joints are exposed.
The flooring in portico slab is damaged at one place & it is reported that the
damage caused due to cooking on floor. The damaged flooring area shall be
replaced & repaired.

V.

Door & Windows :


Teakwood medium qlty wood frames
with solid single leaf flush type
shutters as per Estimate provided for
Doors. The Iron frames with shutters
are provided for windows as per
estimate. The total numbers provided
are as per estimate.
Class Room Lab No.1. The Door size
measured is 1.20m x 2.04 m and
frame size is 100x76mm .

i)

Verification on Type & No Provided :

ii)

Sizes & Section dimensions :

iii)

Verification of data :

iv)

Verification of Hinges, Aldrops & Tower boltAverage quality fixures are provided.

v)

Dimensions of Steel rods, provided in the


8 Nos 10mm dia rods fitted.
windows :

vi)

Workmanship :

Average.

vii)

Verification of paintings provided :

Average.

General Observations:-

Verified.

VI)

The Door frames are protruded into flooring and the net door height of 2.10m are
not observed over the flooring any where. Proper precautions should have been
taken while erection of door frames.

Stair Case :-

ii)

Verification of Bonding of steps with


Basement
Finishing/ Workmanship :

iii)

Tread & Rise :

i)

Verified and found satisfactory.


Finishing
and
workmanship
is
satisfactory.
Measurements Verified in 2nd flight
and observed tread of 0.28m and rise
of 0.14m.
M20 RCC staircase provided as per
Estimate.

Type of masonry provided with ref. to


sanctioned Estimate & M.Book :
General Observations:There is a gap of 2'' to 2.5'' in between wall and staircase in 2nd flight of
a
staircase, which may endanger the students while passing. It may be closed
immediately with concreting.
The height of Hand railing is 0.60m only. As per NBC-2005, it shall be 1.0m
b
height measured from the base of the middle of the treads to the top of the
handrails.
The stone skirting on either side of staircase landing areas are provided but on
c
steps skirting is not provided.
The constant width & rise of steps are not maintained. As per National Building
Code of India 2005, the minimum tread & rise shall be 300mm x 150mm & width
d
of stair to be 2.0M for institutional buildings and the risers shall be limited to 12
per flight.
e
iv)

VII

Roof Slab:

i)

Slab Dimenisions :

ii)

Test for Roof leakage (water ponding 4"


depth for a period of 8 hours) :

iii)

Strength Test (Rebound hammer) :

iv)

Verification of provision of water spouts


on the roof (4" dia pipes) and disposal :

Verified randomly.
Observation
sheet
enclosed.
(Annexure II)
Water ponding is not done during the
inspection. However marks of roof
leakage are not observed in the
rooms during inspection. Leakage in
roof slab at expansion joints is
observed which should be rectified by
suitable water proofing treatment as
per NBC-2005.
Observation
sheet
enclosed.
(Annexure I)
3" dia. PVC Pipes are provided for
water drain out with out connecting to
drains at ground level with vertical
pipes.

General Observations:a

Deflection,honey combing and buckling of roof slab are not observed.

No traces of leakages are observed in roof slab.

Fan Hooks provided in Dining hall are zigzag not followed the line & space.

As per NBC-2005 for effectual drainage of the rain water one pipe of 10 cm. dia.
for every 40 sqm. of roof area shall be provided and the pipes are so arranged
not to cause dampness in any part of the walls. Further It is desirable to
conserve rain water using suitable rain water harvesting techniques or the rainwater pipes to be connected to a drain or sewer to the road gutter.

VIII. Parapet wall and Protection of Columns Steel over Roof


i

Plastering thickess of Parapet wall :

Verified and found satisfactory.

ii

Verification of Jointing at Junction of roof


& parapet :

Cement mortar haunches provided at


the joints.

Verification of Protection of exposed steel


Dummy brick pillars are constructed.
over roof :
Verified at random and found
iv Plumb & Line of parapet wall :
satisfactory.
General Observations:iii

As per National Building Code of India 2005, the Parapet shall not be less than
1.0 m and not more than 1.2 m in height from the finished floor level.

The parapet wall construction is good.

IX.

Sunshades & Other Projections:

Dimensions :

ii
iii
iv

Alignment :
Top & Bottom finishings :
Disposal of rain water from Top surface :

Verified at random & found Width of


Sunshdes
0.60m over verandah
infront of GF Chemistry lab and 0.58m
over windows GF front side and 0.59m
Over windows GF right side.
( measurements over plastering)
True
to
Line
observed
and
Satisfactory.
Satisfactory.
Slopes are provided.

General Observations:a

Slopes are provided in chajjas. But rain water drain out at a single point by way
of providing Cement mortar patty or one brick wall all along periphery with PVC
pipe outlet provision should have been given.

Overall Observations & Suggestions :a

The Overall Workmanship is good.

The provision of Blackboards in Class Rooms, shelves in all rooms, Plotform in


Dining & Kitchen room are not made. The provision of Raised Plotforms in class
rooms are also not made.

The Main Power Supply Cables from Electrical Pole to the building are running on
the wooden poles. The main cables shall be run in the under ground. Electrical
control pannel work is not yet completed.

Un-hygenic conditions with ponding of rain water on left side of building is


noticed. Hence 2.0m wide all along the building, the gravelling shall be done to
avoid mosquito growth, vegetation growth etc.,

As per the G.O.Ms.No.350 M.A., Dated:9th June,2000 of Govt.of A.P. every


building plots having plot size more than 300 Sq. Mtrs. shall be provided for
conservation and harvesting of rain water.

Earthing :: It is observed that sufficient Earthing arrangements confirming the


Electrical Installation requirements are not provided.

The Lightening Arrester at the roof shall be provided with suitable


arrangement for passing electrical surge into the ground.

Floor indicator :-The number of each floor shall be conspicuously painted in


figures at least 15 cm. large on the wall facing the fight of a stairway or at such
suitable place as is distinctly visible from the fights.

m
i

ii
iii

Physically handicapped persons:: A ramp for physically handicapped persons


shall be provided having a slope greater than 1 in 20 or maximum of 1 in 12 for
short distance up to 9.0m and handrails on at least one side, having 900 mm
high as per National Building Code of India 2005.
The arrangement of Bathrooms and Toilets are not systematic. Exhaust
arrangements for toilets are not made nor it feasible due to un-systematic
arrangements.
Dormitories:: There is only one door way provided for dormitory. As per
National Building Code of India 2005, all dormitories shall have exits so arranged
that from any dormitory sleeping area, there shall be access to two separate
exits in different directions with no common path of travel.Every room with a
capacity of over 45 persons in area shall have at least two doorways.
Ceiling Height Requirements as per NBC-2005::
a) Educational Institutions :: Ceiling height shall be -3.6 m.
b)Verandah, Bathroom, W.C., Store room, minimum height -2.00m

Quality Control Aspects ::


Test Reports of Building Materials :: One time test reports from a private lab
dt.16.4.2012 are furnished in respect of materials Sand, Coarse Aggregates, Fine
aggregates, Cement, Steel.
Frequency of Tests:: Vide agreement cl.3.5.3 , the frequency of tests are
enforced i.e., no.of tests for certain quantity of cement, aggregates, concrete
etc., The field officers are furnished the test records registers.
QC Lab/Registers :: The field staff are furnished the Quality Control register.

Note:
1) This inspection report does not purport to be covering all the aspects of the work,
and the filed officers are advised to check up the work item wise and ensure the
specified standards before making final payment.

Asst.Executive Engineer-1,
(PR) Vig & QC Sub-Division, Nalgonda.

Dy.Executive Engineer (PR)


(PR) Vig & QC Sub-Division, Nalgonda.

To,
The Executive Engineer ,
RVM, Nalgonda for taking necessary action.
Submitted to the Executive Engineer (PR) Vigilance & Quality Control Division
Hyderabad for favour of information and necessary action.

ANNEXURE I
REBOUND HAMMER TEST
Name of the Work :-

Construction of KGBV School Building at Alagadapa


in Miryalaguda Mandal

Date of Inspection :

30.10.2013

Sl.
No

Descrption of Item

Directio Average Compressiv Specified


n
Reboun e Strength Strength
of
d
as per
as per
Impact Reading conversion
design
table in
N/mm2

Remarks

Ground floor

Column No. B4 below GL

(0)
degrees

28.00

20.80

M20

Satisfactory

Plinth beam at Column A12

(0)
degrees

28.00

20.80

M20

Satisfactory

Class Room No.1 Column No.


J24

(0)
degrees

30.00

24.20

M20

Satisfactory

Class Room No.2 Column No.


M24

(+90)
degrees

33.00

22.00

M20

Satisfactory

Dinning room Column No.A14

(0)
degrees

31.00

25.40

M20

Satisfactory

Dinning room Beam

(-90)
degrees

33.00

22.00

M20

Satisfactory

First Floor

Library Column No. J23

(0)
degrees

28.00

20.80

M20

Satisfactory

Dormitry Room No.2 column


U9

(0)
degrees

34.00

23.00

M20

Satisfactory

First floor slab - Over


Dormitry room No.3

(-90)
degrees

28.00

24.50

M20

Satisfactory

Asst.Executive Engineer-1,

Dy.Executive Engineer (PR)

(PR) Vig & QC Sub-Division, Nalgonda.

(PR) Vig & QC Sub-Division, Nalgonda.

ANNEXURE II
OBSERVATION SHEET FOR ROOF SLAB
Name of the Work :-

Construction of KGBV School Building at Alagadapa in


Miryalaguda Mandal

Date of Inspection :-

30.10.2013

Slab Dimensions

Sl.
No

Room Number

As per Est.

As per M.Book

As per
Observation

Remarks

19.21x5.36m

19.21x5.36m

Satisfactory

First floor
1

First floor slab of


Library and
Dormitory No.3H23T23-H25T25

Asst.Executive Engineer-1,

Dy.Executive Engineer (PR)

(PR) Vig & QC Sub-Division, Nalgonda.

(PR) Vig & QC Sub-Division, Nalgonda.

eer (PR)

n, Nalgonda.

ANNEXURE III
Observation sheet for RCC roof Beams and Columns
Name of the Work :-

Construction of KGBV School Building at Alagadapa in Miryalaguda Mandal

Date of Inspection :

30.10.2013
ROOF BEAMS

Sl.
No

Room
Number

Size of Beams

Span of Beams

As per Est.

As per
M.Book

As per
Observation

As per
Est.

As per
M.Book

As per
Observation

Dinning room
A15-D15

023mx0.38m

023mx0.38m

025mx0.39m

5.83m

5.83m

5.82m

Dormitry No.3
K12-K13

023mx0.38m

023mx0.38m

023mx0.375m

5.36m

5.36m

5.36m

Remarks

COLUMNS
Sl.
No

Room
Number

Size of Column

Height over flooring up to roof slab


Remarks

As per
design

As per
M.Book

As per
observation

As per
Est.

As per
M.Book

As per
Observation

Kitchen store column


No. B4

0.30x0.38m

0.30x0.38m

0.30x0.38m

3.50

3.50

3.42m

Ht.measured over
flooring

Science lab FF
column No.D24

0.30x0.38m

0.30x0.38m

0.30x0.38m

3.50

3.50

3.35m

Ht.measured over
flooring

Asst.Executive Engineer-1,

Dy.Executive Engineer (PR)

(PR) Vig & QC Sub-Division, Nalgonda.

(PR) Vig & QC Sub-Division, Nalgonda.

ANNEXURE IV
Observation Sheet for Brick Masonry
Name of the Work :-

Construction of KGBV School Building at Alagadapa in Miryalaguda Mandal

Date of Inspection :

30.10.2013

Sl.
No

Room
Number

Wall
Number

Wall Length x Thickness x Height


(Rooms inside Lengths)
As per M.Book

Deficiency Observed

Remarks

Small deficiency in height

measured
over
flooring. Deficiency in
height
is
due
to
thickness of flooring

Small deficiency in height

measured
over
flooring. Deficiency in
height
is
due
to
thickness of flooring

Small deficiency in height

measured
over
flooring. Deficiency in
height
is
due
to
thickness of flooring

Small deficiency in height

measured
over
flooring. Deficiency in
height
is
due
to
thickness of flooring

As per Observation

A Ground floor

Dining A9--A17

Class room No. 3

Long Walls

Cross Walls

11.35x0.23x3.20m

6.36x0.23x3.15m

11.35x0.23x3.06m

6.36x0.23x3.07m

B First Floor

Dormitory No.2

Lab

Long Walls

Cross Walls

9.52x0.23x3.20m

6.37x0.23x3.15m

Asst.Executive Engineer-1,

9.52x0.23x3.11m

6.37x0.23x3.09m

Dy.Executive Engineer (PR)

(PR) Vig & QC Sub-Division, Nalgonda.

(PR) Vig & QC Sub-Division, Nalgonda.

ANNEXURE V
OBSERVATION SHEET FOR FLOORING
Construction of KGBV School Building at Alagadapa
Name of the Work :in Miryalaguda Mandal
Date of Inspection :30.10.2013
Area of Flooring / Room Dimensions

Sl.
No

Room Number

As per Est.

As per M.Book

As per
Observation

Ground floor

Remarks
6

Flooring Measurments

Class -1

6.13x4.91m

6.13x4.91m

6.09x4.86

Class -2

6.13x4.91m

6.13x4.91m

6.13x4.87

Dining

6.14x11.12

6.14x11.12

6.07x11.17

Lab

4.87x6.13

4.87x6.13

4.88x6.11

Dormitory No.3

12.43x4.91

12.43x4.91

12.50x4.85

Dormitory No.1

6.14x11.12

6.14x11.12

6.05x11.16

Height of
skirting
observed as 10
cm.

Asst.Executive Engineer-1,

Dy.Executive Engineer (PR)

(PR) Vig & QC Sub-Division, Nalgonda.

(PR) Vig & QC Sub-Division, Nalgonda.

on, Nalgonda.

VOUCHER FOR SUBMITTING THE BILLS FOR INSPECTIONS


(PR) VIGILANCE & QUALITY CONTROL SUB-DIVISION NALGONDA
Sl. Name Name of
No of the the
.
District Mandal
1

Date of Name of the QC Name of the


Estima Grant Name of Name of the No.o Stage of
Value
QC
Amoun
inspecti Officers inspected School Building te Cost
the
In-charge
f
Work at of work Charg
t
on
Executing Officers
insp the time
done
es
Agency
ectio
of
0.20%
ns Inspection
or
4
5
6
7
8
9
10
11
12
13
14
15

Construction of Rs.125. SSA


DNR
Er.Y.Neelakanteshwa KGBV
School 00
(KGBV Constructio
r, DyEE VQC SD Building
at Lakhs
)
ns Private
30.10.20 Nlgd
1 NalgondaMiryalaguda
Alagadapa
in
Limited,
13
Miryalaguda
Ameerpet,
Er.Bhaskar
Reddy, Mandal
Hyd.
AEE VQC SD Nlgd

Dated::

20.01.2014

Er.Rajendar ,
EE RVM Nlgd
Er.Keshav
Rao,
DyEE
RVM
Mlgd
Er.Swami
Naik,
AEE
RVM Mlgd

Completed Rs.103.
& Occupied 98
but
some Lakhs
finishings
left.