DEPARTMENT OF ENERGY of a particular resource agency, they comments, a protest, or a motion to
must also serve a copy of the document intervene in accordance with the Federal Energy Regulatory on that resource agency. requirements of Rules of Practice and Commission k. Competing Application: Project No. Procedure, 18 CFR 385.210, .211, .214. 12828–000, Date Filed: July 23, 2007, In determining the appropriate action to [Project No. 12850–000; Project No. 12883– 000] Date Issued: October 2, 2007, Due Date: take, the Commission will consider all December 1, 2007. protests or other comments filed, but FFP Project 25, LLC; Hydro Green l. Description of Project: The proposed only those who file a motion to Energy, LLC; Notice of Application project for FFP Project 25, LLC would intervene in accordance with the Accepted for Filing and Soliciting consist of: (1) 3,050 proposed 20 kilowatt Free Flow generating units Commission’s Rules may become a Comments, Motions To Intervene, and party to the proceeding. Any comments, Protests having a total installed capacity of 61 megawatts, (2) a proposed transmission protests, or motions to intervene must December 10, 2007. line, and (3) appurtenant facilities. The be received on or before the specified Take notice that the following Free Flow Power Corporation’s project comment date for the particular hydroelectric application has been filed would have an average annual application. with the Commission and is available generation of 267.18 gigawatt-hours and q. Filing and Service of Responsive for public inspection: be sold to a local utility. Documents—Any filings must bear in a. Type of Application: Preliminary The proposed project for Hydro Green all capital letters the title Permit. Energy, LLC would consist of: (1) 50 ‘‘COMMENTS’’, ‘‘NOTICE OF INTENT b. Project No: 12850–000 12883–000. proposed 100 kilowatt dual ducted TO FILE COMPETING APPLICATION’’, c. Date Filed: July 25, 2007. horizontal axis hydrokinetic generating d. Applicant: FFP Project 25, LLC., ‘‘COMPETING APPLICATION’’, units having a total installed capacity of Hydro Green Energy, LLC. 5 megawatts, (2) a proposed 3-miles- ‘‘PROTEST’’, or ‘‘MOTION TO e. Name of Project: Reliance Light long, 13.6-kV transmission line, and (3) INTERVENE’’, as applicable, and the Project. appurtenant facilities. The Hydro Green Project Number of the particular f. Location: The project would be Energy, LLC’s project would have an application to which the filing refers. located on the Mississippi River in average annual generation of 82.87 Any of the above-named documents Iberville Parishes, Louisiana. The gigawatt-hours and be sold to a local must be filed by providing the original project uses no dam or impoundment. utility. and the number of copies provided by g. Filed Pursuant to: Federal Power m. Locations of Applications: A copy the Commission’s regulations to: The Act, 16 U.S.C. 791(a)–825(r). of the application is available for Secretary, Federal Energy Regulatory h. Applicant Contact: Mr. Dan Irvin, inspection and reproduction at the Commission, 888 First Street, NE., FFP Project 25, LLC, 69 Bridge Street, Commission in the Public Reference Washington, DC 20426. An additional Manchester, MA 01944, phone (978) Room, located at 888 First Street NE., copy must be sent to Director, Division 232–3536.Mr. Wayne F. Krouse, Hydro Room 2A, Washington DC 20426, or by of Hydropower Administration and Green Energy, LLC, 5090 Richmond calling (202) 502–8371. This filing may Compliance, Federal Energy Regulatory Avenue #390, Houston, TX 77056, also be viewed on the Commission’s Commission, at the above-mentioned phone (877) 556–6566. Web site at http://www.ferc.gov using address. A copy of any notice of intent, i. FERC Contact: Mr. Robert Bell, the ‘‘eLibrary’’ link. Enter the docket competing application or motion to (202) 502–6062. number excluding the last three digits in intervene must also be served upon each j. Deadline for filing motions to the docket number field to access the intervene, protests and comments: 60 representative of the Applicant document. For assistance, call toll-free specified in the particular application. days from the issuance date of this 1–866–208–3676 or e-mail notice. FERCOnlineSupport@ferc.gov. For TTY, Comments, protests and interventions All documents (original and eight call (202) 502–8659. A copy is also may be filed electronically via the copies) should be filed with: Kimberly available for inspection and Internet in lieu of paper; see 18 CFR D. Bose, Secretary, Federal Energy reproduction at the address in item h. 385.2001(a)(1)(iii) and the instructions Regulatory Commission, 888 First above. on the Commission’s Web site under the Street, NE., Washington, DC 20426. n. Individuals desiring to be included ‘‘e-Filing’’ link. The Commission Comments, protests, and interventions on the Commission’s mailing list should strongly encourages electronic filings may be filed electronically via the so indicate by writing to the Secretary r. Agency Comments—Federal, State, Internet in lieu of paper; see 18 CFR of the Commission. 385.2001(a)(1)(iii) and the instructions and local agencies are invited to file o. Proposed Scope of Studies under on the Commission’s Web site under the Permit—A preliminary permit, if issued, comments on the described application. ‘‘e-Filing’’ link. The Commission does not authorize construction. The A copy of the application may be strongly encourages electronic filings. term of the proposed preliminary permit obtained by agencies directly from the Please include the project number (P– would be 36 months. The work Applicant. If an agency does not file 12850–000 & P–12883–000) on any proposed under the preliminary permit comments within the time specified for comments or motions filed. would include economic analysis, filing comments, it will be presumed to The Commission’s Rules of Practice preparation of preliminary engineering have no comments. One copy of an and Procedure require all interveners plans, and a study of environmental agency’s comments must also be sent to filing documents with the Commission impacts. Based on the results of these the Applicant’s representatives. ebenthall on PROD1PC69 with NOTICES
to serve a copy of that document on studies, the Applicant would decide
Kimberly D. Bose, each person in the official service list whether to proceed with the preparation for the project. Further, if an intervener of a development application to Secretary. files comments or documents with the construct and operate the project. [FR Doc. E7–24299 Filed 12–14–07; 8:45 am] Commission relating to the merits of an p. Comments, Protests, or Motions to BILLING CODE 6717–01–P issue that may affect the responsibilities Intervene—Anyone may submit
VerDate Aug<31>2005 15:28 Dec 14, 2007 Jkt 214001 PO 00000 Frm 00050 Fmt 4703 Sfmt 4703 E:\FR\FM\17DEN1.SGM 17DEN1