71398 Federal Register / Vol. 72, No.

241 / Monday, December 17, 2007 / Notices

q. Comments, Protests, or Motions to DEPARTMENT OF ENERGY Corps of Engineers’ Mount Morris Dam
Intervene—Anyone may submit and operated in a run-of-river mode
comments, a protest, or a motion to Federal Energy Regulatory would consist of: (1) A new 50-foot
intervene in accordance with the Commission long, 50-foot wide, 30-foot high concrete
requirements of Rules of Practice and [Project No. 13036–000] powerhouse and associated switchyard;
Procedure, 18 CFR 385.210, .211, .214. (2) two 50-foot-long, 18-foot-diameter
In determining the appropriate action to BPUS Generation Development, LLC; steel penstocks; (3) a new tailrace
take, the Commission will consider all Notice of Application Accepted for channel immediately downstream, river
protests or other comments filed, but Filing and Soliciting Motions To left, of the existing Corps’ outlet works;
Intervene, Protests, and Comments (4) one turbine/generator unit with an
only those who file a motion to
installed capacity of 5 megawatts; (5) a
intervene in accordance with the December 10, 2007. new 3,603-foot long above ground
Commission’s Rules may become a Take notice that the following transmission line extending from the
party to the proceeding. Any comments, hydroelectric application has been filed switchyard near the powerhouse
protests, or motions to intervene must with the Commission and is available northeast to an interconnection point
be received on or before the specified for public inspection: with an existing transmission line
comment date for the particular a. Type of Application: Preliminary owned by Rochester Gas and Electric
application. Permit. Corporation; and (6) appurtenant
b. Project No.: 13036–000. facilities. The proposed Mount Morris
r. Filing and Service of Responsive c. Date filed: September 28, 2007.
Documents—Any filings must bear in Dam Project would have an average
d. Applicant: BPUS Generation
all capital letters the title annual generation of 20 gigawatt-hours.
Development, LLC. l. This filing is available for review at
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT e. Name of Project: Mount Morris
TO FILE COMPETING APPLICATION’’, the Commission in the Public Reference
Dam Hydroelectric Project.
f. Location: Genesee River in Room or may be viewed on the
‘‘COMPETING APPLICATION’’,
Livingston County, New York. It would Commission’s Web site at http://
‘‘PROTEST’’, and ‘‘MOTION TO
use the U.S. Army Corps of Engineers’ www.ferc.gov using the ‘‘eLibrary’’ link.
INTERVENE’’, as applicable, and the Enter the docket number excluding the
Project Number of the particular Mount Morris Dam.
g. Filed Pursuant to: Federal Power last three digits in the docket number
application to which the filing refers. field to access the document. For
Any of the above-named documents Act, 16 U.S.C. 791(a)—825(r).
h. Applicant Contact: Mr. Jeffrey M. assistance, call toll-free 1–866–208–
must be filed by providing the original 3676 or e-mail
Auser, P.E., BPUS Generation
and the number of copies provided by FERCONLINESUPPORT@FERC.GOV.
Development, LLC, 225 Greenfield
the Commission’s regulations to: The Parkway, Suite 201, Liverpool, NY For TTY, call (202) 502–8659. A copy is
Secretary, Federal Energy Regulatory 13088, (315) 413–2700. also available for inspection and
Commission, 888 First Street, NE., i. FERC Contact: Robert Bell, (202) reproduction at the address in item h
Washington, DC 20426. An additional 502–4126. above.
copy must be sent to Director, Division j. Deadline for filing comments, m. Competing Preliminary Permit:
of Hydropower Administration and protests, and motions to intervene: 60 Anyone desiring to file a competing
Compliance, Federal Energy Regulatory days from the issuance date of this application for preliminary permit for a
Commission, at the above-mentioned notice. proposed project must submit the
address. A copy of any notice of intent, All documents (original and eight competing application itself, or a notice
competing application or motion to copies) should be filed with: Kimberly of intent to file such an application, to
intervene must also be served upon each D. Bose, Secretary, Federal Energy the Commission on or before the
Regulatory Commission, 888 First specified comment date for the
representative of the Applicant
Street, NE., Washington, DC 20426. particular application (see 18 CFR 4.36).
specified in the particular application. Submission of a timely notice of intent
Comments, protests, and interventions
s. Agency Comments—Federal, State, may be filed electronically via the allows an interested person to file the
and local agencies are invited to file Internet in lieu of paper; see 18 CFR competing preliminary permit
comments on the described application. 385.2001(a)(1)(iii) and the instructions application no later than 30 days after
A copy of the application may be on the Commission’s Web site under the the specified comment date for the
obtained by agencies directly from the ‘‘e-Filing’’ link. The Commission particular application. A competing
Applicant. If an agency does not file strongly encourages electronic filings. preliminary permit application must
comments within the time specified for Please include the project number (P– conform with 18 CFR 4.30 and 4.36.
filing comments, it will be presumed to 13036–000) on any comments or n. Competing Development
have no comments. One copy of an motions filed. Application: Any qualified development
agency’s comments must also be sent to The Commission’s Rules of Practice applicant desiring to file a competing
and Procedure require all intervenors development application must submit to
the Applicant’s representatives.
filing documents with the Commission the Commission, on or before a
Kimberly D. Bose, to serve a copy of that document on specified comment date for the
Secretary. each person in the official service list particular application, either a
[FR Doc. E7–24302 Filed 12–14–07; 8:45 am] for the project. Further, if an intervenor competing development application or a
files comments or documents with the notice of intent to file such an
BILLING CODE 6717–01–P
Commission relating to the merits of an application. Submission of a timely
ebenthall on PROD1PC69 with NOTICES

issue that may affect the responsibilities notice of intent to file a development
of a particular resource agency, they application allows an interested person
must also serve a copy of the document to file the competing application no
on that resource agency. later than 120 days after the specified
k. Description of Project: The comment date for the particular
proposed project using the U.S. Army application. A competing license

VerDate Aug<31>2005 15:28 Dec 14, 2007 Jkt 214001 PO 00000 Frm 00054 Fmt 4703 Sfmt 4703 E:\FR\FM\17DEN1.SGM 17DEN1
Federal Register / Vol. 72, No. 241 / Monday, December 17, 2007 / Notices 71399

application must conform with 18 CFR representative of the Applicant 385.2001(a)(1)(iii) and the instructions
4.30 and 4.36. specified in the particular application. on the Commission’s Web site under the
o. Notice of Intent: A notice of intent s. Agency Comments: Federal, State, ‘‘e-Filing’’ link. The Commission
must specify the exact name, business and local agencies are invited to file strongly encourages electronic filings.
address, and telephone number of the comments on the described application. Please include the project number (P–
prospective applicant, and must include A copy of the application may be 13037–000) on any comments or
an unequivocal statement of intent to obtained by agencies directly from the motions filed.
submit, if such an application may be Applicant. If an agency does not file The Commission’s Rules of Practice
filed, either a preliminary permit comments within the time specified for and Procedure require all intervenors
application or a development filing comments, it will be presumed to filing documents with the Commission
application (specify which type of have no comments. One copy of an to serve a copy of that document on
application). A notice of intent must be agency’s comments must also be sent to each person in the official service list
served on the applicant(s) named in this the Applicant’s representatives. for the project. Further, if an intervenor
public notice. files comments or documents with the
p. Proposed Scope of Studies Under Kimberly D. Bose, Commission relating to the merits of an
Permit: A preliminary permit, if issued, Secretary. issue that may affect the responsibilities
does not authorize construction. The [FR Doc. E7–24303 Filed 12–14–07; 8:45 am] of a particular resource agency, they
term of the proposed preliminary permit BILLING CODE 6717–01–P must also serve a copy of the document
would be 36 months. The work on that resource agency.
proposed under the preliminary permit k. Description of Project: The
would include economic analysis, DEPARTMENT OF ENERGY proposed project using the U.S. Army
preparation of preliminary engineering Corps of Engineers’ Nimrod Dam and
plans, and a study of environmental Federal Energy Regulatory operated in a run-of-river mode would
impacts. Based on the results of these Commission consist of: (1) A new 50-foot long, 50-
studies, the Applicant would decide [Project No. 13037–000] foot wide, 40-foot high concrete
whether to proceed with the preparation powerhouse and associated switchyard;
of a development application to BPUS Generation Development, LLC; (2) one 200-foot-long, 8-foot-diameter
construct and operate the project. Notice of Application Accepted for steel penstock; (3) a new tailrace
q. Comments, Protests, or Motions to Filing and Soliciting Motions To channel immediately downstream of the
Intervene: Anyone may submit Intervene, Protests, and Comments existing Corps’ outlet works; (4) one
comments, a protest, or a motion to turbine/generator unit with an installed
intervene in accordance with the December 10, 2007. capacity of 6 megawatts; (5) a new
requirements of Rules of Practice and Take notice that the following 6,079-foot long above ground
Procedure, 18 CFR 385.210, .211, .214. hydroelectric application has been filed transmission line extending from the
In determining the appropriate action to with the Commission and is available switchyard near the powerhouse east to
take, the Commission will consider all for public inspection: an interconnection point with an
protests or other comments filed, but a. Type of Application: Preliminary existing transmission line owned by
only those who file a motion to Permit. First Electric Cooperative Electric
intervene in accordance with the b. Project No.: 13037–000. Corporation; and (6) appurtenant
Commission’s Rules may become a c. Date filed: September 28, 2007. facilities. The proposed Nimrod Dam
party to the proceeding. Any comments, d. Applicant: BPUS Generation Project would have an average annual
protests, or motions to intervene must Development, LLC. generation of 13 gigawatt-hours.
be received on or before the specified e. Name of Project: Nimrod Dam l. This filing is available for review at
comment date for the particular Hydroelectric Project. the Commission in the Public Reference
application. f. Location: Fourche La Fave River in Room or may be viewed on the
r. Filing and Service of Responsive Yell County, Arkansas. It would use the Commission’s Web site at http://
Documents: Any filings must bear in all U.S. Army Corps of Engineers’ Nimrod www.ferc.gov using the ‘‘eLibrary’’ link.
capital letters the title ‘‘COMMENTS’’, Dam. Enter the docket number excluding the
‘‘NOTICE OF INTENT TO FILE g. Filed Pursuant to: Federal Power last three digits in the docket number
COMPETING APPLICATION’’, Act, 16 U.S.C. 791(a)—825(r). field to access the document. For
‘‘COMPETING APPLICATION’’, h. Applicant Contact: Mr. Jeffrey M. assistance, call toll-free 1–866–208–
‘‘PROTEST’’, and ‘‘MOTION TO Auser, P.E., BPUS Generation 3676 or e-mail
INTERVENE’’, as applicable, and the Development, LLC, 225 Greenfield FERCONLINESUPPORT@FERC.GOV.
Project Number of the particular Parkway, Suite 201, Liverpool, NY For TTY, call (202) 502–8659. A copy is
application to which the filing refers. 13088, (315) 413–2700. also available for inspection and
Any of the above-named documents i. FERC Contact: Robert Bell, (202) reproduction at the address in item h
must be filed by providing the original 502–4126. above.
and the number of copies provided by j. Deadline for filing comments, m. Competing Preliminary Permit—
the Commission’s regulations to: The protests, and motions to intervene: 60 Anyone desiring to file a competing
Secretary, Federal Energy Regulatory days from the issuance date of this application for preliminary permit for a
Commission, 888 First Street, NE., notice. proposed project must submit the
Washington, DC 20426. An additional All documents (original and eight competing application itself, or a notice
copy must be sent to Director, Division copies) should be filed with: Kimberly of intent to file such an application, to
ebenthall on PROD1PC69 with NOTICES

of Hydropower Administration and D. Bose, Secretary, Federal Energy the Commission on or before the
Compliance, Federal Energy Regulatory Regulatory Commission, 888 First specified comment date for the
Commission, at the above-mentioned Street, NE., Washington, DC 20426. particular application (see 18 CFR 4.36).
address. A copy of any notice of intent, Comments, protests, and interventions Submission of a timely notice of intent
competing application or motion to may be filed electronically via the allows an interested person to file the
intervene must also be served upon each Internet in lieu of paper; see 18 CFR competing preliminary permit