68148 Federal Register / Vol. 72, No.

232 / Tuesday, December 4, 2007 / Notices

comment date for the particular f. Location: Ohio River in Allegheny www.ferc.gov using the ‘‘eLibrary’’ link.
application. County, Pennsylvania. It would use the Enter the docket number excluding the
r. Filing and Service of Responsive U.S. Army Corps of Engineers’ last three digits in the docket number
Documents—Any filings must bear in Dashields Locks & Dam. field to access the document. For
all capital letters the title g. Filed Pursuant to: Federal Power assistance, call toll-free 1–866–208–
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT Act, 16 U.S.C. 791(a)–825(r). 3676 or e-mail
TO FILE COMPETING APPLICATION’’, h. Applicant Contact: Mr. Jeffrey M. FERCONLINESUPPORT@FERC.GOV.
‘‘COMPETING APPLICATION’’, Auser, P.E., BPUS Generation For TTY, call (202) 502–8659. A copy is
‘‘PROTEST’’, and ‘‘MOTION TO Development, LLC, 225 Greenfield also available for inspection and
INTERVENE’’, as applicable, and the Parkway, Suite 201, Liverpool, NY reproduction at the address in item h
Project Number of the particular 13088, (315) 413–2700. above.
application to which the filing refers. i. FERC Contact: Robert Bell, (202) m. Competing Preliminary Permit—
Any of the above-named documents 502–4126. Anyone desiring to file a competing
must be filed by providing the original j. Deadline for filing comments, application for preliminary permit for a
and the number of copies provided by protests, and motions to intervene: 60 proposed project must submit the
the Commission’s regulations to: The days from the issuance date of this competing application itself, or a notice
Secretary, Federal Energy Regulatory notice. of intent to file such an application, to
Commission, 888 First Street, NE., All documents (original and eight the Commission on or before the
Washington, DC 20426. An additional copies) should be filed with: Secretary, specified comment date for the
copy must be sent to Director, Division Federal Energy Regulatory Commission, particular application (see 18 CFR 4.36).
of Hydropower Administration and 888 First Street, NE., Washington, DC Submission of a timely notice of intent
Compliance, Federal Energy Regulatory 20426. Comments, protests, and allows an interested person to file the
Commission, at the above-mentioned interventions may be filed electronically competing preliminary permit
address. A copy of any notice of intent, via the Internet in lieu of paper; see 18 application no later than 30 days after
competing application or motion to CFR 385.2001(a)(1)(iii) and the the specified comment date for the
intervene must also be served upon each instructions on the Commission’s Web particular application. A competing
representative of the Applicant site under the ‘‘e-Filing’’ link. The preliminary permit application must
specified in the particular application. Commission strongly encourages conform with 18 CFR 4.30 and 4.36.
s. Agency Comments—Federal, state, electronic filings. Please include the n. Competing Development
and local agencies are invited to file project number (P–12904–000) on any Application—Any qualified
comments on the described application. comments or motions filed. development applicant desiring to file a
A copy of the application may be The Commission’s Rules of Practice competing development application
obtained by agencies directly from the and Procedure require all intervenors must submit to the Commission, on or
Applicant. If an agency does not file filing documents with the Commission before a specified comment date for the
comments within the time specified for to serve a copy of that document on particular application, either a
filing comments, it will be presumed to each person in the official service list competing development application or a
have no comments. One copy of an for the project. Further, if an intervenor notice of intent to file such an
agency’s comments must also be sent to files comments or documents with the application. Submission of a timely
the Applicant’s representatives. Commission relating to the merits of an notice of intent to file a development
issue that may affect the responsibilities application allows an interested person
Kimberly D. Bose, of a particular resource agency, they to file the competing application no
Secretary. must also serve a copy of the document later than 120 days after the specified
[FR Doc. E7–23434 Filed 12–3–07; 8:45 am] on that resource agency. comment date for the particular
BILLING CODE 6717–01–P k. Description of Project: The application. A competing license
proposed project using the U.S. Army application must conform with 18 CFR
Corps of Engineers’ Dashields Locks & 4.30 and 4.36.
DEPARTMENT OF ENERGY Dam and operated in a run-of-river o. Notice of Intent—A notice of intent
mode would consist of: (1) A new 200- must specify the exact name, business
Federal Energy Regulatory
foot long, 200-foot wide, 50-foot high address, and telephone number of the
Commission
concrete powerhouse; (2) a new intake prospective applicant, and must include
[Project No. 12904–000] channel and tailrace channel on the an unequivocal statement of intent to
northeastern side of the river opposite submit, if such an application may be
BPUS Generation Development, LLC; the existing locks structure; (3) five filed, either a preliminary permit
Notice of Application Accepted for turbine/generator units with a combined application or a development
Filing and Soliciting Motions To installed capacity of 25 megawatts; (4) a application (specify which type of
Intervene, Protests, and Comments new 11,500-foot long above ground application). A notice of intent must be
November 26, 2007. transmission line extending from the served on the applicant(s) named in this
Take notice that the following switchyard near the powerhouse to an public notice.
hydroelectric application has been filed interconnection point with an existing p. Proposed Scope of Studies Under
with the Commission and is available transmission line located northwest of Permit—A preliminary permit, if issued,
for public inspection: the powerhouse; and (5) appurtenant does not authorize construction. The
a. Type of Application: Preliminary facilities. The proposed Dashields Locks term of the proposed preliminary permit
Permit. & Dam Project would have an average would be 36 months. The work
mstockstill on PROD1PC66 with NOTICES

b. Project No.: 12904–000. annual generation of 120 gigawatt- proposed under the preliminary permit
c. Date filed: July 30, 2007. hours. would include economic analysis,
d. Applicant: BPUS Generation l. This filing is available for review at preparation of preliminary engineering
Development, LLC. the Commission in the Public Reference plans, and a study of environmental
e. Name of Project: Dashields Locks & Room or may be viewed on the impacts. Based on the results of these
Dam Hydroelectric Project. Commission’s Web site at http:// studies, the Applicant would decide

VerDate Aug<31>2005 17:38 Dec 03, 2007 Jkt 214001 PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 E:\FR\FM\04DEN1.SGM 04DEN1
Federal Register / Vol. 72, No. 232 / Tuesday, December 4, 2007 / Notices 68149

whether to proceed with the preparation DEPARTMENT OF ENERGY Corps of Engineers’ Emsworth Locks &
of a development application to Dam and operated in a run-of-river
construct and operate the project. Federal Energy Regulatory mode would consist of: (1) A new 200-
Commission foot-long, 200-foot-wide, 50-foot-high
q. Comments, Protests, or Motions to
[Project No. 12905–000] concrete powerhouse; (2) a new intake
Intervene—Anyone may submit
channel and tailrace channel on the
comments, a protest, or a motion to
BPUS Generation Development, LLC; southern bank of the main channel, on
intervene in accordance with the Neville Island directly opposite the
Notice of Application Accepted for
requirements of Rules of Practice and existing locks structure; (3) five turbine/
Filing and Soliciting Motions To
Procedure, 18 CFR 385.210, .211, .214. generator units with a combined
Intervene, Protests, and Comments
In determining the appropriate action to installed capacity of 32.7 megawatts; (4)
take, the Commission will consider all November 26, 2007. a new 11,500-foot-long aboveground
protests or other comments filed, but Take notice that the following transmission line extending from the
only those who file a motion to hydroelectric application has been filed switchyard near the powerhouse to an
intervene in accordance with the with the Commission and is available interconnection point with an existing
Commission’s Rules may become a for public inspection: transmission line located southwest of
party to the proceeding. Any comments, a. Type of Application: Preliminary the powerhouse; and (5) appurtenant
protests, or motions to intervene must Permit. facilities. The proposed Emsworth
b. Project No.: 12905–000. Locks & Dam Project would have an
be received on or before the specified c. Date filed: July 30, 2007.
comment date for the particular average annual generation of 141.3
d. Applicant: BPUS Generation
application. gigawatt-hours.
Development, LLC. l. This filing is available for review at
r. Filing and Service of Responsive e. Name of Project: Emsworth Locks &
the Commission in the Public Reference
Documents—Any filings must bear in Dam Hydroelectric Project.
f. Location: Ohio River in Allegheny Room or may be viewed on the
all capital letters the title Commission’s Web site at http://
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT County, Pennsylvania. It would use the
U.S. Army Corps of Engineers’ www.ferc.gov using the ‘‘eLibrary’’ link.
TO FILE COMPETING APPLICATION’’, Enter the docket number excluding the
Emsworth Locks & Dam.
‘‘COMPETING APPLICATION’’, g. Filed Pursuant to: Federal Power last three digits in the docket number
‘‘PROTEST’’, and ‘‘MOTION TO Act, 16 U.S.C. 791(a)–825(r). field to access the document. For
INTERVENE’’, as applicable, and the h. Applicant Contact: Mr. Jeffrey M. assistance, call toll-free 1–866–208–
Project Number of the particular Auser, P.E., BPUS Generation 3676 or e-mail
application to which the filing refers. Development, LLC, 225 Greenfield FERCONLINESUPPORT@FERC.GOV.
Any of the above-named documents Parkway, Suite 201, Liverpool, NY For TTY, call (202) 502–8659. A copy is
must be filed by providing the original 13088, (315) 413–2700. also available for inspection and
and the number of copies provided by i. FERC Contact: Robert Bell, (202) reproduction at the address in item h
the Commission’s regulations to: The 502–4126. above.
Secretary, Federal Energy Regulatory j. Deadline for filing comments, m. Competing Preliminary Permit—
protests, and motions to intervene: 60 Anyone desiring to file a competing
Commission, 888 First Street, NE.,
days from the issuance date of this application for preliminary permit for a
Washington, DC 20426. An additional
notice. proposed project must submit the
copy must be sent to Director, Division competing application itself, or a notice
All documents (original and eight
of Hydropower Administration and of intent to file such an application, to
copies) should be filed with: Kimberly
Compliance, Federal Energy Regulatory the Commission on or before the
D. Bose, Secretary, Federal Energy
Commission, at the above-mentioned Regulatory Commission, 888 First specified comment date for the
address. A copy of any notice of intent, Street, NE., Washington, DC 20426. particular application (see 18 CFR 4.36).
competing application or motion to Comments, protests, and interventions Submission of a timely notice of intent
intervene must also be served upon each may be filed electronically via the allows an interested person to file the
representative of the Applicant Internet in lieu of paper; see 18 CFR competing preliminary permit
specified in the particular application. 385.2001(a)(1)(iii) and the instructions application no later than 30 days after
s. Agency Comments—Federal, State, on the Commission’s Web site under the the specified comment date for the
and local agencies are invited to file ‘‘e-Filing’’ link. The Commission particular application. A competing
comments on the described application. strongly encourages electronic filings. preliminary permit application must
Please include the project number (P– conform with 18 CFR 4.30 and 4.36.
A copy of the application may be
12905–000) on any comments or n. Competing Development
obtained by agencies directly from the Application—Any qualified
Applicant. If an agency does not file motions filed.
The Commission’s Rules of Practice development applicant desiring to file a
comments within the time specified for and Procedure require all intervenors competing development application
filing comments, it will be presumed to filing documents with the Commission must submit to the Commission, on or
have no comments. One copy of an to serve a copy of that document on before a specified comment date for the
agency’s comments must also be sent to each person in the official service list particular application, either a
the Applicant’s representatives. for the project. Further, if an intervenor competing development application or a
files comments or documents with the notice of intent to file such an
Kimberly D. Bose,
Commission relating to the merits of an application. Submission of a timely
mstockstill on PROD1PC66 with NOTICES

Secretary. notice of intent to file a development


issue that may affect the responsibilities
[FR Doc. E7–23435 Filed 12–3–07; 8:45 am] of a particular resource agency, they application allows an interested person
BILLING CODE 6717–01–P must also serve a copy of the document to file the competing application no
on that resource agency. later than 120 days after the specified
k. Description of Project: The comment date for the particular
proposed project using the U.S. Army application. A competing license