"Every well needs one"

SPE Aberdeen 4th European Well Abandonment Seminar

Ole Petter Nipen Baker Hughes

Version 2.0
2012 BAKER HUGHES INCORPORATED. ALL RIGHTS RESERVED. TERMS AND CONDITIONS OF USE: BY ACCEPTING THIS DOCUMENT, THE RECIPIENT AGREES THAT THE DOCUMENT TOGETHER WITH ALL INFORMATION
INCLUDED THEREIN IS THE CONFIDENTIAL AND PROPRIETARY PROPERTY OF BAKER HUGHES INCORPORATED AND INCLUDES VALUABLE TRADE SECRETS AND/OR PROPRIETARY INFORMATION OF BAKER HUGHES
(COLLECTIVELY "INFORMATION"). BAKER HUGHES RETAINS ALL RIGHTS UNDER COPYRIGHT LAWS AND TRADE SECRET LAWS OF THE UNITED STATES OF AMERICA AND OTHER COUNTRIES. THE RECIPIENT FURTHER
AGREES THAT THE DOCUMENT MAY NOT BE DISTRIBUTED, TRANSMITTED, COPIED OR REPRODUCED IN WHOLE OR IN PART BY ANY MEANS, ELECTRONIC, MECHANICAL, OR OTHERWISE, WITHOUT THE EXPRESS PRIOR
WRITTEN CONSENT OF BAKER HUGHES, AND MAY NOT BE USED DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTAL TO BAKER HUGHES INTEREST.

Agenda
 Introduction to TOGI Subsea P&A project
 Scope of work
 P&A operation Step by Step
 Big Fishing

2013 Baker Hughes Incorporated. All Rights Reserved.

TOGI P&A Project


 6 slot wellhead structure,
5 wells drilled in 1990
 All ROV operated
 300 m water depth
 Closed in down since 2002

2013 Baker Hughes Incorporated. All Rights Reserved.

Scope of work
Batch P&A of 5 wells:
 Pull completion
 Log 9 5/8 casing
 Place 1st barrier
 Cut & Pull 9 5/8 Casing
 Place 2nd barrier
 Cut & Pull 13 3/8 casing
 Surface plug
 Remove wellhead, 30 and
42 casing
Contingency:
 Mill seal assembly
 Section mill 9 5/8 & 13 3/8
 Casing mill 9 5/8
 Cut & Pull 9 5/8 in one run
4

2013 Baker Hughes Incorporated. All Rights Reserved.

Pull Completion
Operational steps
 Pull tubing with THRT
 Tubing pulled down to PBR

2013 Baker Hughes Incorporated. All Rights Reserved.

9 5/8 X 10 section
 Log 9 5/8 X 10 Casing
 Place 1st Barrier Plug
 Cut 10 Casing Below Hanger
 Pull 10 Seal Assembly
 Remove 10 X 9 5/8 Casing

2013 Baker Hughes Incorporated. All Rights Reserved.

Remove 10 seal assembly

2013 Baker Hughes Incorporated. All Rights Reserved.

Remove 10 seal assembly

10 Seal Assembly and casing hanger


Mill 7 Seal Assembly

2013 Baker Hughes Incorporated. All Rights Reserved.

Remove 10 x 9 5/8 casing


 Cut & Pull in same run
 Cut in tension
 Pull up to max overpull prior to cut

 Pre-defined section cutted


 Saved eight run

2013 Baker Hughes Incorporated. All Rights Reserved.

Casing Mill
 Mill 58 meter of 9 5/8 Casing
 ROP was limited by swarf handling
 Small swarf

Define max ROP upfront!

5
5

10

2013 Baker Hughes Incorporated. All Rights Reserved.

Contingency

 Contingency on all wells


 9 5/8 & 13 3/8

11

2013 Baker Hughes Incorporated. All Rights Reserved.

13 3/8 section
 Log 13 3/8 Casing
 Place 2nd Barrier Plug
 Pull 13 3/8 Seal Assembly
 Remove 13 3/8 Casing

12

2013 Baker Hughes Incorporated. All Rights Reserved.

18 5/8 section
 Set 18 5/8 Mechanical Plug
 Place Surface Cement Plug
 Cut & Pull 18 5/8
 Cut & Pull 30
 Cut & Pull 42

13

2013 Baker Hughes Incorporated. All Rights Reserved.

Big Fishing
1. Remove 18 5/8 wellhead (Blue)
2. Remove 30 Conductor (Red)
3. Remove 42 Washout sleeve (Green)

Shear at 136 ton

14

2013 Baker Hughes Incorporated. All Rights Reserved.

Cut & Pull 18 5/8 Wellhead


D-spear
 Two Trip Solutions
 Dressed to catch ID:18,000"-19,162"

D-spear
15

2013 Baker Hughes Incorporated. All Rights Reserved.

Wellhead

Cut 30

16

2013 Baker Hughes Incorporated. All Rights Reserved.

Pull 30 Conductor

E-spear


17

2013 Baker Hughes Incorporated. All Rights Reserved.

20 D-spear

Cement?
 Cement above 42 hanger and inside template housing!

Cement outside of 30
18

2013 Baker Hughes Incorporated. All Rights Reserved.

45 Cement Mill

Cut 42

MS-Cutter with Stabilizer

19

2013 Baker Hughes Incorporated. All Rights Reserved.

42 Conductor cut

Pull 42
Remove 42 Washout sleeve (green)
 Catch 38,5

Modified E-Spear

42 Conductor on Deck

Stack-Up Test
20

2013 Baker Hughes Incorporated. All Rights Reserved.

Big Fishing

Movie

21

2013 Baker Hughes Incorporated. All Rights Reserved.

TOGI P&A Project Sum up


Operational time: 1208.4 hrs
Downtime: 4.5 hrs
Operational factor: 99.62%
Mill 9 5/8 & 13 3/8 Seal Assembly: 7 seal assy milled
Cut operation of 9 5/8, 10 & 13 3/8: 16 run
Cut & pull operation with Spear, and motor: 8 run!
Pulling & Cutting operation: 25 run
9 5/8 casing milled: 58 meter

22

2013 Baker Hughes Incorporated. All Rights Reserved.

TOGI P&A Project Sum up








Robust fishing package offshore


Standardise BHA`s
Milling Seal Assembly
Back-up equipment for Big Fishing Tools
Personnel
o Planning and follow up operation
o Operators offshore

Operational factor: 99.62%

23

2013 Baker Hughes Incorporated. All Rights Reserved.

Questions?

24