S10

Pres
upue
sto
Presupue
sto

0601012

Subpresu
puesto

001

Cliente

MUNICIPALIDAD DISTRITAL DE TAMBOBAMBA

Lugar

APURIMAC - COTABAMBAS - TAMBOBAMBA

Item

Descripcin

01

Costo al

Und.

Metrado

Precio S/.

COMPONENTE I ADECUADA INFRAESTRUCTURA DEL SISTEMA DE AGUA

02

TRABAJOS PRELIMINARES

02.01

OBRAS PRELIMINARES

02.01.01

MOVILIZACION Y DESMOVILIZACION DE EQUIPO

GLB

1.00

5,000.00

02.01.02

CAMPAMENTO PROVISIONAL DE LA OBRA

m2

40.00

182.18

02.01.03

CARTEL DE OBRA

und

1.00

500.00

03

CAPTACION DE MANANTE TIPO "Y" (01 UND)

03.01

TRABAJOS PRELIMINARES

03.01.01

DEMOLICION DE CAPTACION EXISTENTE

m3

9.36

71.41

03.01.02

TRAZO Y REPLANTEO

m2

9.36

2.09

03.02

MOVIMIENTO DE TIERRAS

03.02.01

EXCAVACION MANUAL DE ZANJAS EN MATERIAL SUELTO

m3

7.03

18.02

03.02.02

REFINE Y NIVELACION ZANJA EN TERRENO NORMAL

12.86

0.89

03.02.03

RELLENO CON MATERIAL PROPIO SELECCIONADO

m3

1.39

14.09

03.02.04

RELLENO CON MATERIALGRANULAR 30<<50mm

m3

0.09

128.69

03.02.05

RELLENO CON ARENA SELECCIONADA

m3

0.21

128.69

03.02.06

RELLENO CON PIEDRA 50<<150mm

m3

1.81

128.69

03.02.07

ELIMINACION LATERAL DE MATERIAL EXCEDENTE

m3

7.34

8.93

03.03

OBRAS DE CONCRETO SIMPLE

03.03.01

CONCRETO F'C=140 KG/CM2

m3

0.11

425.41

03.03.02

CONCRETO F'C=140 KG/CM2 + 30% PG

m3

0.55

356.81

03.03.03

CONCRETO F'C=175 KG/CM2 + 30% PG

m3

1.20

381.45

03.03.04

ENCOFRADO Y DESENCOFRADO

m2

8.98

38.43

03.04

OBRAS DE CONCRETO ARMADO

03.04.01

CONCRETO F'C= 210 KG/CM2.

m3

1.03

501.85

03.04.02

ENCOFRADO Y DESENCOFRADO

m2

8.73

38.43

03.04.03

ACERO FY= 4200 KG/CM2.

kg

87.92

5.96

03.05

ACABADOS Y MOLDURAS

03.05.01

TARRAJEO EN EXTERIORES, MORTERO 1:5

m2

5.55

27.81

03.05.02

TARRAJEO INTERIOR CON IMPERMEABILIZANTE

m2

3.81

18.81

03.05.03

PINTURA EN MUROS EXTERIORES CON ESMALTE SINTETICO

m2

6.24

16.42

03.05.04

BRUA DE 1.0x1.0 cm

7.10

1.58

03.06

CARPINTERIA METALICA, VALVULAS Y ACCESORIOS

03.06.01

TAPA SANITARIA METALICA 0.60 X 0.60M. (SUMINISTRO Y COLOCACION)

und

1.00

128.98

03.06.02

TAPA SANITARIA METALICA 0.40 X 0.40M. (SUMINISTRO Y COLOCACION)

und

1.00

78.98

03.06.03

VALVULA COMPUERTA DE BRONCE DE 2" (Incluye soporte metlico)

und

1.00

346.32

03.06.04

VALVULA COMPUERTA DE BRONCE DE 3/4" (Incluye soporte metlico)

und

1.00

334.32

03.06.05

CANASTILLA PVC DE 2"

und

1.00

30.93

03.06.06

CONO DE REBOSE PVC 3"x2"

und

1.00

19.15

03.06.07

CODO PVC SAP 90x2"

und

2.00

19.93

03.06.08

TEE PVC SAP DE 2"

und

2.00

21.93

03.06.09

TUBERIA PVC SAL DE 2"

6.00

14.98

03.06.10

TUBERIA PVC SAP DE 1 1/2" C-7.5

3.00

12.48

04

INSTALACION DE TUBERIAS EN LINEAS DE CONDUCCION L= 270 ML

04.01

TRABAJOS PRELIMINARES

04.01.01

TRAZO, NIVELACION Y REPLANTEO

04.02

MOVIMIENTO DE TIERRAS

04.02.01

270.00

3.82

EXCAVACION MANUAL EN TERRENO NORMAL

m3

113.40

21.42

04.02.02

REFINE Y NIVELACION ZANJA EN TERRENO NORMAL

270.00

0.89

04.02.03

CAMA DE APOYO PARA TUBERIA CON MATERIAL PROPIO SELECCIONADO

m3

16.20

11.85

04.02.04

RELLENO CON MATERIAL PROPIO SELECCIONADO

m3

97.20

14.09

04.02.05

ELIMINACION LATERAL DE MATERIAL EXCEDENTE

m3

21.06

8.93

04.03

INSTALACION DE TUBERAS

04.03.01

SUM. E INST. DE TUBERIA PVC SP DE 1" C-10

270.00

8.55

04.03.02

CODO PVC-SAP 1" * 90

und

4.00

17.09

04.03.03

PRUEBA HIDRAULICA

270.00

1.03

05

INSTALACION DE TUBERIAS EN REDES DE DISTRIBUCION L=3497.0 ML

05.01

TRABAJOS PRELIMINARES

05.01.01

TRAZO, NIVELACION Y REPLANTEO

3,497.00

3.82

05.02

MOVIMIENTO DE TIERRAS

05.02.01

EXCAVACION MANUAL EN TERRENO ROCOSO

m3

367.19

26.78

05.02.02

EXCAVACION MANUAL EN TERRENO NORMAL

m3

856.77

21.42

05.02.03

REFINE Y NIVELACION ZANJA EN TERRENO NORMAL

3,497.00

0.89

05.02.04

CAMA DE APOYO PARA TUBERIA CON MATERIAL PROPIO SELECCIONADO

m3

1,049.10

11.85

05.02.05

RELLENO CON MATERIAL PROPIO SELECCIONADO

m3

174.85

14.09

05.02.06

ELIMINACION LATERAL DE MATERIAL EXCEDENTE

m3

174.85

8.93

05.03

INSTALACION DE TUBERAS

05.03.01

SUM. E INST. DE TUBERIA PVC SP DE 1" C-10

210.00

8.55

05.03.02

SUM. E INST. DE TUBERIA PVC SP DE 3/4" C-10

2,447.00

7.82

05.03.03

SUM. E INST. DE TUBERIA PVC SP DE 1/2" C-10

840.00

6.15

05.03.04

ACCESORIOS DE PVC

GLB

1.00

100.00

05.03.05

PRUEBA HIDRAULICA

3,497.00

1.03

06

OBRAS DE ARTE EN REDES DE DISTRIBUCION

06.01

CAMARA DE CARGA ( 01 UND)

06.01.01

ROCE Y DESHIERBE EN OBRAS DE ARTE

m2

4.42

1.07

06.01.02

TRAZO Y REPLANTEO

m2

4.42

2.09

06.01.03

EXCAVACION PARA ESTRUCTURAS

m3

4.42

19.13

06.01.04

REFINE Y NIVELACION DE FONDO

m2

4.42

1.34

06.01.05

RELLENO CON MATERIAL PROPIO SELECCIONADO

m3

0.78

14.09

06.01.06

ELIMINACION LATERAL DE MATERIAL EXCEDENTE

m3

5.75

8.93

06.01.07

CONCRETO F'C=140 KG/CM2

m3

0.15

425.41

06.01.08

CONCRETO F'C= 210 KG/CM2.

m3

2.14

501.85

06.01.09

ACERO FY= 4200 KG/CM2.

kg

116.17

5.96

06.01.10

ENCOFRADO Y DESENCOFRADO

m2

12.91

38.43

06.01.11

TARRAJEO INTERIOR CON IMPERMEABILIZANTE

m2

12.91

18.81

06.01.12

TAPA METALICA ESTRIADA 0.60x0.60m

und

1.00

139.28

06.01.13

TAPA METALICA ESTRIADA 0.50x0.50m

und

1.00

104.28

06.01.14

TUBERIA PVC SAP 2" C- 7.5

6.00

14.48

06.01.15

SUM. E INST. DE VALVULAS COMPUERTA (INCL. ADAPTADOR)

und

1.00

32.89

06.01.16

CONO DE REBOSE PVC 3"x2"

und

1.00

19.15

06.01.17

CANASTILLA PVC DE 2"

und

1.00

30.93

06.01.18

CODO PVC -SAP 2" * 90

und

3.00

17.34

06.01.19

TUBERIA DE VENTILACION FG DE 2"

und

1.00

41.36

06.02

VALVULAS DE CONTROL Y PASO ( O8 UND)

06.02.01

EXCAVACION MANUAL DE ZANJAS EN MATERIAL SUELTO

m3

1.73

18.02

06.02.02

ELIMINACION LATERAL DE MATERIAL EXCEDENTE

m3

2.25

8.93

06.02.03

CONCRETO F'C= 175 KG/CM2.

m3

0.80

449.68

06.02.04

ENCOFRADO Y DESENCOFRADO

m2

8.00

38.43

06.02.05

TARRAJEO INTERIOR CON IMPERMEABILIZANTE

m2

6.40

18.81

06.02.06

TAPA SANITARIA METALICA 0.40 X 0.40M. (SUMINISTRO Y COLOCACION)

und

8.00

78.98

06.02.07

VALVULA COMPUERTA DE BRONCE DE 3/4"

und

8.00

55.32

06.02.08

ADAPTADOR UR PVC DE 3/4"

und

8.00

21.96

06.02.09

SUM. E INST. DE GRAVA DE 3/4"-1"

m3

0.29

105.14

06.03

VALVULA DE PURGA ( 02 UND)

06.03.01

EXCAVACION MANUAL DE ZANJAS EN MATERIAL SUELTO

m3

2.59

18.02

06.03.02

RELLENO CON MATERIAL PROPIO SELECCIONADO

m3

2.16

14.09

06.03.03

ELIMINACION LATERAL DE MATERIAL EXCEDENTE

m3

1.21

8.93

06.03.04

CONCRETO F'C=140 KG/CM2

m3

0.25

425.41

06.03.05

CONCRETO F'C= 175 KG/CM2.

m3

0.20

449.68

06.03.06

ENCOFRADO Y DESENCOFRADO

m2

2.00

38.43

06.03.07

TARRAJEO INTERIOR CON IMPERMEABILIZANTE

m2

1.60

18.81

06.03.08

TAPA SANITARIA METALICA 0.40 X 0.40M. (SUMINISTRO Y COLOCACION)

und

2.00

78.98

06.03.09

VALVULA COMPUERTA DE BRONCE 1/2"

und

2.00

53.32

06.03.10

ADAPTADOR UR PVC DE 3/4"

und

2.00

21.96

06.03.11

SUM. E INST. DE GRAVA DE 3/4"-1"

m3

0.07

105.14

06.04

PASE AEREO L= 6M (02 UND)

06.04.01

EXCAVACION MANUAL DE ZANJAS EN MATERIAL SUELTO

m3

3.38

18.02

06.04.02

REFINE Y NIVELACION DE FONDO

m2

2.88

1.34

06.04.03

RELLENO CON MATERIAL PROPIO SELECCIONADO

m3

2.88

14.09

06.04.04

ELIMINACION LATERAL DE MATERIAL EXCEDENTE

m3

3.88

8.93

06.04.05

ENCOFRADO Y DESENCOFRADO

m2

4.00

38.43

06.04.06

CONCRETO F'C=140 KG/CM2

m3

0.50

425.41

06.04.07

TUBERIA DE FG DE 3/4"

12.00

22.09

06.04.08

ADAPTADOR UNION ROSCADA FG 3/4"A HDPE 20mm

und

2.00

21.96

06.05

ESTRUCTURA DISTRIBUIDOR DE CAUDALES

06.05.01

TRAZO Y REPLANTEO

m2

3.75

2.09

06.05.02

EXCAVACION PARA ESTRUCTURAS

m3

9.15

19.13

06.05.03

REFINE Y NIVELACION ZANJA EN TERRENO NORMAL

3.75

0.89

06.05.04

RELLENO CON MATERIAL PROPIO SELECCIONADO

m3

6.60

14.09

06.05.05

ELIMINACION LATERAL DE MATERIAL EXCEDENTE

m3

3.32

8.93

06.05.06

CONCRETO F'C=140 KG/CM2

m3

0.21

425.41

06.05.07

CONCRETO F'C= 210 KG/CM2.

m3

1.70

501.85

06.05.08

ENCOFRADO Y DESENCOFRADO

m2

15.00

38.43

06.05.09

ACERO FY= 4200 KG/CM2.

kg

170.60

5.96

06.05.10

TAPA METALICA ESTRIADA 1.00x1.00m

und

1.00

159.14

06.05.11

CONO DE REBOSE PVC 4"x2"

und

1.00

19.15

06.05.12

CANASTILLA DE 1 1/2"

und

1.00

20.00

06.05.13

ACCESORIOS DE PVC

GLB

1.00

100.00

06.05.14

TUBERIA DE VENTILACION FG DE 2"

und

1.00

41.36

06.06

CAMARA ROMPEPRESION T-06 ( 06 UND)

06.06.01

TRAZO Y REPLANTEO

m2

6.54

2.09

06.06.02

EXCAVACION PARA ESTRUCTURAS

m3

6.90

19.13

06.06.03

RELLENO CON MATERIAL PROPIO SELECCIONADO

m3

2.00

14.09

06.06.04

CONCRETO F'C=140 KG/CM2

m3

0.89

425.41

06.06.05

CONCRETO F'C= 210 KG/CM2.

m3

3.95

501.85

06.06.06

ACERO FY= 4200 KG/CM2.

kg

138.84

5.96

06.06.07

ENCOFRADO Y DESENCOFRADO

m2

20.16

38.43

06.06.08

TARRAJEO INTERIOR CON IMPERMEABILIZANTE

m2

23.04

18.81

06.06.09

TAPA METALICA ESTRIADA 0.60x0.60m

und

6.00

139.28

06.06.10

SUM. E INST. DE VALVULAS COMPUERTA (INCL. ADAPTADOR)

und

6.00

32.89

06.06.11

ELIMINACION LATERAL DE MATERIAL EXCEDENTE

m3

5.04

8.93

06.06.12

CONO DE REBOSE PVC 3"x2"

und

6.00

19.15

06.06.13

CANASTILLA DE 1"

und

6.00

107.24

06.06.14

CODO PVC-SAP 1" * 90

und

6.00

17.09

07

CONSTRUCCION DE RESERVORIOS

07.01

RESERVORIO DE V= 08 M3 ( 01 UND)

07.01.01

TRABAJOS PRELIMINARES

07.01.01.01

TRAZO Y REPLANTEO

m2

11.48

2.09

07.01.02

MOVIMIENTO DE TIERRAS

07.01.02.01

EXCAVACION MANUAL DE ZANJAS EN MATERIAL SUELTO

m3

8.81

18.02

07.01.02.02

REFINE Y NIVELACION ZANJA EN TERRENO NORMAL

10.24

0.89

07.01.02.03

RELLENO CON MATERIAL PROPIO SELECCIONADO

m3

1.02

14.09

07.01.02.04

ELIMINACION LATERAL DE MATERIAL EXCEDENTE

m3

20.24

8.93

07.01.03

OBRAS DE CONCRETO SIMPLE

07.01.03.01

CONCRETO F'C=140 KG/CM2

m3

0.57

425.41

07.01.04

OBRAS DE CONCRETO ARMADO

07.01.04.01

CONCRETO F'C= 210 KG/CM2.

m3

5.87

501.85

07.01.04.02

ENCOFRADO Y DESENCOFRADO

m2

30.22

38.43

07.01.04.03

ACERO FY= 4200 KG/CM2.

kg

199.96

5.96

07.01.05

ACABADOS Y MOLDURAS

07.01.05.01

TARRAJEO EN EXTERIORES, MORTERO 1:5

m2

28.92

27.81

07.01.05.02

TARRAJEO INTERIOR CON IMPERMEABILIZANTE

m2

30.45

18.81

07.01.05.03

PINTURA EN MUROS EXTERIORES CON ESMALTE SINTETICO

m2

28.92

16.42

07.01.06

CARPINTERIA METALICA, VALVULAS Y ACCESORIOS

07.01.06.01

TAPA SANITARIA METALICA 0.60 X 0.60M. (SUMINISTRO Y COLOCACION)

und

2.00

128.98

07.01.06.02

VALVULA COMPUERTA DE BRONCE DE 1"

und

1.00

60.32

07.01.06.03

VALVULA COMPUERTA DE BRONCE DE 3/4"

und

3.00

55.32

07.01.06.04

CANASTILLA DE BRONCE DE 2"

und

1.00

47.33

07.01.06.05

ACCESORIOS DE FG

GLB

1.00

200.00

07.01.06.06

ACCESORIOS DE PVC

GLB

1.00

100.00

07.01.06.07

TUBERIA DE VENTILACION FG DE 2"

und

1.00

41.36

07.01.06.08

SUM. E INST. DE ACCESORIOS EN RESERVORIO

GLB

1.00

283.60

07.01.06.09

CERCO PERIMETRICO DE PROTECCION DE RESERVORIO

8.00

54.79

07.02

PILETAS DOMICILIARIAS CON LAVATORIO ( 90 UND)

07.02.01

TRAZO Y REPLANTEO

m2

149.20

2.09

07.02.02

EXCAVACION MANUAL DE ZANJAS EN MATERIAL SUELTO

m3

69.37

18.02

07.02.03

CONCRETO F'C= 175 KG/CM2.

m3

10.90

449.68

07.02.04

ENCOFRADO Y DESENCOFRADO

m2

119.54

38.43

07.02.05

ACERO FY= 4200 KG/CM2.

kg

447.50

5.96

07.02.06

TARRAJEO INTERIOR CON IMPERMEABILIZANTE

m2

111.56

18.81

07.02.07

LLAVE DE PASO DE 1/2"

und

40.00

93.15

07.02.08

ACCESORIOS INSTALACIONES SANITARIAS DESAGUE

und

40.00

77.01

07.02.09

PINTURA EN MUROS EXTERIORES

m2

60.24

13.37

07.02.10

DRENAJE

m3

34.00

105.14

07.02.11

EMPEDRADO PERIMETRAL

m3

51.60

101.62

07.03

PROGRAMA DE MITIGACION Y PROTECCION AMBIENTAL

07.03.01

PROTECCION AMBIENTAL

07.03.01.01

PROGRAMA DE PROTECCION AMBIENTAL

GLB

1.00

9,500.00

07.03.02

MITIGACION Y CONTROL DE IMPACTO AMBIENTAL

07.03.02.01

LIMPIEZA AL TERMINO DE LA OBRA

3,497.00

1.53

07.03.02.02

REFORESTACION

GLB

1.00

1,755.46

07.04

FLETE

07.04.01

FLETE TERRESTRE CUSCO - TAMBOBAMBA

GLB

1.00

45,000.00

07.04.02

ACARREO DE MATERIALES

GLB

1.00

7,156.02

07.04.03

ACARREO DE AGREGADOS

GLB

1.00

5,585.54

08

COMPONENTE II : ALTA COBERTURA DEL SERVICIO DE DISPOSICION DE EXCRETAS

08.01

CASETA DE LETRINAS Y DUCHAS (40 UND)

08.01.01

TRAZO Y REPLANTEO

m2

396.30

2.09

08.01.02

EXCAVACION MANUAL DE ZANJAS EN MATERIAL SUELTO

m3

110.08

18.02

08.01.03

ELIMINACION LATERAL DE MATERIAL EXCEDENTE

m3

55.30

8.93

08.01.04

RELLENO CON MATERIAL PROPIO SELECCIONADO

m3

64.00

14.09

08.01.05

ENCOFRADO Y DESENCOFRADO

m2

128.76

38.43

08.01.06

CIMENTACION CORRIDA C:H 1:6 +25% PM

m3

46.08

239.27

08.01.07

SOBRECIMIENTO C:H 1:6 +25% PM

m2

13.96

243.44

08.01.08

CONCRETO F'C= 175 KG/CM2.

m3

1.14

449.68

08.01.09

ACERO FY= 4200 KG/CM2.

kg

118.72

5.96

08.01.10

TARRAJEO INTERIOR CON IMPERMEABILIZANTE

m2

500.28

18.81

08.01.11

TARRAJEO EN EXTERIORES, MORTERO 1:5

m2

575.48

27.81

08.01.12

MURO DE BLOQUETA

m2

530.68

47.20

08.01.13

BRUA DE 1.0x1.0 cm

284.00

1.58

08.01.14

COBERTURA DE CALAMINA GALVANIZADA

m2

280.00

23.28

08.01.15

PUERTA DE MADERA

und

40.00

76.28

08.01.16

INODORO EN LETRINAS

und

40.00

360.60

08.01.17

INSTALACION DE SISTEMA DE AGUA FRIA EN LETRINAS

und

40.00

320.00

08.01.18

SUMINISTRO E INST. DE ACCESORIOS EN LETRINAS

GLB

40.00

171.00

08.01.19

PINTURA EN MUROS EXTERIORES CON ESMALTE SINTETICO

m2

132.40

16.42

08.02

INSTALACION DE BIODIGESTOR DE 600 LTS (40 UND)

08.02.01

MODULO E INSTALACION DE BIODIGESTOR AUTOLIMPIABLE

GLB

40.00

2,000.00

09

COMPONENTE III ADECUADA GESTION OPERATIVA COMERCIAL Y ADMINISTRATIVA

09.01

CAPACITACION A JASS

10

COMPONENTE IV "ALTOS NIVELES DE EDUCACION SANITARIA Y AMBIENTAL"

10.01

CAPACITACION A USUARIOS

GLB

1.00

19,500.00

GLB

1.00

19,500.00

Costo Directo

489,971.44

GASTOS GENERALES (10%)

48,997.14

COSTO DE EXPEDIENTE (3%)

14,699.14

GASTOS DE SUPERVISION (4%)

19,598.86

GASTOS DE LIQUIDACION (2.5%)

12,249.29

TOTAL PRESUPUESTO

SON :

585,515.87

QUINIENTOS OCHENTICINCO MIL QUINIENTOS QUINCE Y 87/100 NUEVOS SOLES

Fecha :

P
gi
na

20/05/2015

Parcial S/.

12,787.20

12,787.20
5,000.00

7,287.20
500.00

5,094.47
687.96

668.40
19.56

494.80
126.68

11.45

19.59
11.58

27.02

232.93

65.55
1,045.89

46.80
196.25

457.74
345.10

1,376.40
516.91

335.49
524.00

339.70

154.35
71.67

102.46
11.22

1,149.72
128.98

78.98
346.32

334.32

30.93
19.15

39.86
43.86

89.88
37.44

8,105.28

1,031.40
1,031.40

4,418.92
2,429.03

240.30

191.97
1,369.55

188.07
2,654.96

2,308.50
68.36
278.10
90,912.07

13,358.54
13,358.54

47,754.58
9,833.35

18,352.01
3,112.33

12,431.84

2,463.64
1,561.41

29,798.95
1,795.50

19,135.54
5,166.00

100.00

3,601.91
16,578.07

3,242.68
4.73

9.24

84.55
5.92

10.99
51.35

63.81
1,073.96

692.37
496.13

242.84

139.28
104.28

86.88
32.89

19.15
30.93

52.02
41.36

2,119.39
31.17

20.09

359.74

307.44
120.38

631.84
442.56

175.68
30.49

707.04
46.67

30.43
10.81

106.35

89.94
76.86
30.10

157.96

106.64
43.92

7.36
815.43

60.91
3.86

40.58
34.65

153.72
212.71

265.08

43.92

3,184.23
7.84

175.04
3.34

92.99
29.65

89.34
853.15

576.45
1,016.78

159.14

19.15
20.00

100.00
41.36

6,509.30
13.67

132.00
28.18

378.61

1,982.31
827.49

774.75
433.38

835.68
197.34

45.01

114.90
643.44

102.54
115,975.61

9,375.17

23.99
23.99

362.98
158.76

9.11
14.37

180.74
242.48

242.48
5,298.97

2,945.86
1,161.35

1,191.76
1,851.90

804.27

572.76
474.87

1,594.85
257.96

60.32
165.96

47.33

200.00
100.00

41.36
283.60

438.32

32,253.01
311.83

1,250.05
4,901.51

4,593.92
2,667.10

2,098.44
3,726.00

3,080.40

805.41
3,574.76

5,243.59
16,605.87

9,500.00
9,500.00

7,105.87
5,350.41

1,755.46
57,741.56

45,000.00

7,156.02

5,585.54
201,518.74

121,518.74
828.27

1,983.64

493.83
901.76

4,948.25
11,025.56

3,398.42
512.64

707.57
9,410.27

16,004.10

25,048.10
448.72
6,518.40

3,051.20
14,424.00

12,800.00

6,840.00
2,174.01

80,000.00
80,000.00

19,500.00

19,500.00

19,500.00

19,500.00

###

S10

Pres
upue
sto
Presupue
sto

0601011

Subpresu
puesto

001

Cliente

MUNICIPALIDAD DISTRITAL DE TAMBOBAMBA

Lugar

APURIMAC - COTABAMBAS - TAMBOBAMBA

Item

Descripcin

01

COMPONENTE I ADECUADA INFRAESTRUCTURA DEL SISTEMA DE AGUA

02

TRABAJOS PRELIMINARES

02.01

OBRAS PRELIMINARES

02.01.01

MOVILIZACION Y DESMOVILIZACION DE EQUIPO

GLB

1.00

5,000.00

02.01.02

CAMPAMENTO PROVISIONAL DE LA OBRA

m2

40.00

182.18

02.01.03

CARTEL DE OBRA

und

1.00

500.00

03

CAPTACION DE MANANTE TIPO "Y" (01 UND)

03.01

TRABAJOS PRELIMINARES

03.01.01

DEMOLICION DE CAPTACION EXISTENTE

m3

9.36

71.41

03.01.02

TRAZO Y REPLANTEO

m2

9.36

2.09

03.02

MOVIMIENTO DE TIERRAS

03.02.01

EXCAVACION MANUAL DE ZANJAS EN MATERIAL SUELTO

m3

7.03

18.02

03.02.02

REFINE Y NIVELACION ZANJA EN TERRENO NORMAL

12.86

0.89

03.02.03

RELLENO CON MATERIAL PROPIO SELECCIONADO

m3

1.39

14.09

03.02.04

RELLENO CON MATERIALGRANULAR 30<<50mm

m3

0.09

128.69

03.02.05

RELLENO CON ARENA SELECCIONADA

m3

0.21

128.69

Costo al

Und.

Metrado

Precio S/.

03.02.06

RELLENO CON PIEDRA 50<<150mm

m3

1.81

128.69

03.02.07

ELIMINACION LATERAL DE MATERIAL EXCEDENTE

m3

7.34

8.93

03.03

OBRAS DE CONCRETO SIMPLE

03.03.01

CONCRETO F'C=140 KG/CM2

m3

0.11

425.41

03.03.02

CONCRETO F'C=140 KG/CM2 + 30% PG

m3

0.55

356.81

03.03.03

CONCRETO F'C=175 KG/CM2 + 30% PG

m3

1.20

381.45

03.03.04

ENCOFRADO Y DESENCOFRADO

m2

8.98

38.43

03.04

OBRAS DE CONCRETO ARMADO

03.04.01

CONCRETO F'C= 210 KG/CM2.

m3

1.03

501.85

03.04.02

ENCOFRADO Y DESENCOFRADO

m2

8.73

38.43

03.04.03

ACERO FY= 4200 KG/CM2.

kg

87.92

5.96

03.05

ACABADOS Y MOLDURAS

03.05.01

TARRAJEO EN EXTERIORES, MORTERO 1:5

m2

5.55

27.81

03.05.02

TARRAJEO INTERIOR CON IMPERMEABILIZANTE

m2

3.81

18.81

03.05.03

PINTURA EN MUROS EXTERIORES CON ESMALTE SINTETICO

m2

6.24

16.42

03.05.04

BRUA DE 1.0x1.0 cm

7.10

1.58

03.06

CARPINTERIA METALICA, VALVULAS Y ACCESORIOS

03.06.01

TAPA SANITARIA METALICA 0.60 X 0.60M. (SUMINISTRO Y COLOCACION)

und

1.00

128.98

03.06.02

TAPA SANITARIA METALICA 0.40 X 0.40M. (SUMINISTRO Y COLOCACION)

und

1.00

78.98

03.06.03

VALVULA COMPUERTA DE BRONCE DE 2" (Incluye soporte metlico)

und

1.00

346.32

03.06.04

VALVULA COMPUERTA DE BRONCE DE 3/4" (Incluye soporte metlico)

und

1.00

334.32

03.06.05

CANASTILLA PVC DE 2"

und

1.00

30.93

03.06.06

CONO DE REBOSE PVC 3"x2"

und

1.00

19.15

03.06.07

CODO PVC SAP 90x2"

und

2.00

19.93

03.06.08

TEE PVC SAP DE 2"

und

2.00

21.93

03.06.09

TUBERIA PVC SAL DE 2"

6.00

14.98

03.06.10

TUBERIA PVC SAP DE 1 1/2" C-7.5

3.00

12.48

04

INSTALACION DE TUBERIAS EN LINEAS DE CONDUCCION L= 270 ML

04.01

TRABAJOS PRELIMINARES

04.01.01

TRAZO, NIVELACION Y REPLANTEO

04.02

MOVIMIENTO DE TIERRAS

04.02.01

270.00

3.82

EXCAVACION MANUAL EN TERRENO NORMAL

m3

113.40

21.42

04.02.02

REFINE Y NIVELACION ZANJA EN TERRENO NORMAL

270.00

0.89

04.02.03

CAMA DE APOYO PARA TUBERIA CON MATERIAL PROPIO SELECCIONADO

m3

16.20

11.85

04.02.04

RELLENO CON MATERIAL PROPIO SELECCIONADO

m3

97.20

14.09

04.02.05

ELIMINACION LATERAL DE MATERIAL EXCEDENTE

m3

21.06

8.93

04.03

INSTALACION DE TUBERAS

04.03.01

SUM. E INST. DE TUBERIA PVC SP DE 1" C-10

270.00

8.55

04.03.02

CODO PVC-SAP 1" * 90

und

4.00

17.09

04.03.03

PRUEBA HIDRAULICA

270.00

1.03

05

INSTALACION DE TUBERIAS EN REDES DE DISTRIBUCION L=3497.0 ML

05.01

TRABAJOS PRELIMINARES

05.01.01

TRAZO, NIVELACION Y REPLANTEO

3,497.00

3.82

05.02

MOVIMIENTO DE TIERRAS

05.02.01

EXCAVACION MANUAL EN TERRENO ROCOSO

m3

367.19

26.78

05.02.02

EXCAVACION MANUAL EN TERRENO NORMAL

m3

856.77

21.42

05.02.03

REFINE Y NIVELACION ZANJA EN TERRENO NORMAL

3,497.00

0.89

05.02.04

CAMA DE APOYO PARA TUBERIA CON MATERIAL PROPIO SELECCIONADO

m3

1,049.10

11.85

05.02.05

RELLENO CON MATERIAL PROPIO SELECCIONADO

m3

174.85

14.09

05.02.06

ELIMINACION LATERAL DE MATERIAL EXCEDENTE

m3

174.85

8.93

05.03

INSTALACION DE TUBERAS

05.03.01

SUM. E INST. DE TUBERIA PVC SP DE 1" C-10

210.00

8.55

05.03.02

SUM. E INST. DE TUBERIA PVC SP DE 3/4" C-10

2,447.00

7.82

05.03.03

SUM. E INST. DE TUBERIA PVC SP DE 1/2" C-10

840.00

6.15

05.03.04

ACCESORIOS DE PVC

GLB

1.00

100.00

05.03.05

PRUEBA HIDRAULICA

3,497.00

1.03

06

OBRAS DE ARTE EN REDES DE DISTRIBUCION

06.01

CAMARA DE CARGA ( 01 UND)

06.01.01

ROCE Y DESHIERBE EN OBRAS DE ARTE

m2

4.42

1.07

06.01.02

TRAZO Y REPLANTEO

m2

4.42

2.09

06.01.03

EXCAVACION PARA ESTRUCTURAS

m3

4.42

19.13

06.01.04

REFINE Y NIVELACION DE FONDO

m2

4.42

1.34

06.01.05

RELLENO CON MATERIAL PROPIO SELECCIONADO

m3

0.78

14.09

06.01.06

ELIMINACION LATERAL DE MATERIAL EXCEDENTE

m3

5.75

8.93

06.01.07

CONCRETO F'C=140 KG/CM2

m3

0.15

425.41

06.01.08

CONCRETO F'C= 210 KG/CM2.

m3

2.14

501.85

06.01.09

ACERO FY= 4200 KG/CM2.

kg

116.17

5.96

06.01.10

ENCOFRADO Y DESENCOFRADO

m2

12.91

38.43

06.01.11

TARRAJEO INTERIOR CON IMPERMEABILIZANTE

m2

12.91

18.81

06.01.12

TAPA METALICA ESTRIADA 0.60x0.60m

und

1.00

139.28

06.01.13

TAPA METALICA ESTRIADA 0.50x0.50m

und

1.00

104.28

06.01.14

TUBERIA PVC SAP 2" C- 7.5

6.00

14.48

06.01.15

SUM. E INST. DE VALVULAS COMPUERTA (INCL. ADAPTADOR)

und

1.00

32.89

06.01.16

CONO DE REBOSE PVC 3"x2"

und

1.00

19.15

06.01.17

CANASTILLA PVC DE 2"

und

1.00

30.93

06.01.18

CODO PVC -SAP 2" * 90

und

3.00

17.34

06.01.19

TUBERIA DE VENTILACION FG DE 2"

und

1.00

41.36

06.02

VALVULAS DE CONTROL Y PASO ( O8 UND)

06.02.01

EXCAVACION MANUAL DE ZANJAS EN MATERIAL SUELTO

m3

1.73

18.02

06.02.02

ELIMINACION LATERAL DE MATERIAL EXCEDENTE

m3

2.25

8.93

06.02.03

CONCRETO F'C= 175 KG/CM2.

m3

0.80

449.68

06.02.04

ENCOFRADO Y DESENCOFRADO

m2

8.00

38.43

06.02.05

TARRAJEO INTERIOR CON IMPERMEABILIZANTE

m2

6.40

18.81

06.02.06

TAPA SANITARIA METALICA 0.40 X 0.40M. (SUMINISTRO Y COLOCACION)

und

8.00

78.98

06.02.07

VALVULA COMPUERTA DE BRONCE DE 3/4"

und

8.00

55.32

06.02.08

ADAPTADOR UR PVC DE 3/4"

und

8.00

21.96

06.02.09

SUM. E INST. DE GRAVA DE 3/4"-1"

m3

0.29

105.14

06.03

VALVULA DE PURGA ( 02 UND)

06.03.01

EXCAVACION MANUAL DE ZANJAS EN MATERIAL SUELTO

m3

2.59

18.02

06.03.02

RELLENO CON MATERIAL PROPIO SELECCIONADO

m3

2.16

14.09

06.03.03

ELIMINACION LATERAL DE MATERIAL EXCEDENTE

m3

1.21

8.93

06.03.04

CONCRETO F'C=140 KG/CM2

m3

0.25

425.41

06.03.05

CONCRETO F'C= 175 KG/CM2.

m3

0.20

449.68

06.03.06

ENCOFRADO Y DESENCOFRADO

m2

2.00

38.43

06.03.07

TARRAJEO INTERIOR CON IMPERMEABILIZANTE

m2

1.60

18.81

06.03.08

TAPA SANITARIA METALICA 0.40 X 0.40M. (SUMINISTRO Y COLOCACION)

und

2.00

78.98

06.03.09

VALVULA COMPUERTA DE BRONCE 1/2"

und

2.00

53.32

06.03.10

ADAPTADOR UR PVC DE 3/4"

und

2.00

21.96

06.03.11

SUM. E INST. DE GRAVA DE 3/4"-1"

m3

0.07

105.14

06.04

PASE AEREO L= 6M (02 UND)

06.04.01

EXCAVACION MANUAL DE ZANJAS EN MATERIAL SUELTO

m3

3.38

18.02

06.04.02

REFINE Y NIVELACION DE FONDO

m2

2.88

1.34

06.04.03

RELLENO CON MATERIAL PROPIO SELECCIONADO

m3

2.88

14.09

06.04.04

ELIMINACION LATERAL DE MATERIAL EXCEDENTE

m3

3.88

8.93

06.04.05

ENCOFRADO Y DESENCOFRADO

m2

4.00

38.43

06.04.06

CONCRETO F'C=140 KG/CM2

m3

0.50

425.41

06.04.07

TUBERIA DE FG DE 3/4"

12.00

22.09

06.04.08

ADAPTADOR UNION ROSCADA FG 3/4"A HDPE 20mm

und

2.00

21.96

06.05

ESTRUCTURA DISTRIBUIDOR DE CAUDALES

06.05.01

TRAZO Y REPLANTEO

m2

3.75

2.09

06.05.02

EXCAVACION PARA ESTRUCTURAS

m3

9.15

19.13

06.05.03

REFINE Y NIVELACION ZANJA EN TERRENO NORMAL

3.75

0.89

06.05.04

RELLENO CON MATERIAL PROPIO SELECCIONADO

m3

6.60

14.09

06.05.05

ELIMINACION LATERAL DE MATERIAL EXCEDENTE

m3

3.32

8.93

06.05.06

CONCRETO F'C=140 KG/CM2

m3

0.21

425.41

06.05.07

CONCRETO F'C= 210 KG/CM2.

m3

1.70

501.85

06.05.08

ENCOFRADO Y DESENCOFRADO

m2

15.00

38.43

06.05.09

ACERO FY= 4200 KG/CM2.

kg

170.60

5.96

06.05.10

TAPA METALICA ESTRIADA 1.00x1.00m

und

1.00

159.14

06.05.11

CONO DE REBOSE PVC 4"x2"

und

1.00

19.15

06.05.12

CANASTILLA DE 1 1/2"

und

1.00

20.00

06.05.13

ACCESORIOS DE PVC

GLB

1.00

100.00

06.05.14

TUBERIA DE VENTILACION FG DE 2"

und

1.00

41.36

06.06

CAMARA ROMPEPRESION T-06 ( 06 UND)

06.06.01

TRAZO Y REPLANTEO

m2

6.54

2.09

06.06.02

EXCAVACION PARA ESTRUCTURAS

m3

6.90

19.13

06.06.03

RELLENO CON MATERIAL PROPIO SELECCIONADO

m3

2.00

14.09

06.06.04

CONCRETO F'C=140 KG/CM2

m3

0.89

425.41

06.06.05

CONCRETO F'C= 210 KG/CM2.

m3

3.95

501.85

06.06.06

ACERO FY= 4200 KG/CM2.

kg

138.84

5.96

06.06.07

ENCOFRADO Y DESENCOFRADO

m2

20.16

38.43

06.06.08

TARRAJEO INTERIOR CON IMPERMEABILIZANTE

m2

23.04

18.81

06.06.09

TAPA METALICA ESTRIADA 0.60x0.60m

und

6.00

139.28

06.06.10

SUM. E INST. DE VALVULAS COMPUERTA (INCL. ADAPTADOR)

und

6.00

32.89

06.06.11

ELIMINACION LATERAL DE MATERIAL EXCEDENTE

m3

5.04

8.93

06.06.12

CONO DE REBOSE PVC 3"x2"

und

6.00

19.15

06.06.13

CANASTILLA DE 1"

und

6.00

107.24

06.06.14

CODO PVC-SAP 1" * 90

und

6.00

17.09

07

CONSTRUCCION DE RESERVORIOS

07.01

RESERVORIO DE V= 08 M3 ( 01 UND)

07.01.01

TRABAJOS PRELIMINARES

07.01.01.01

TRAZO Y REPLANTEO

m2

11.48

2.09

07.01.02

MOVIMIENTO DE TIERRAS

07.01.02.01

EXCAVACION MANUAL DE ZANJAS EN MATERIAL SUELTO

m3

8.81

18.02

07.01.02.02

REFINE Y NIVELACION ZANJA EN TERRENO NORMAL

10.24

0.89

07.01.02.03

RELLENO CON MATERIAL PROPIO SELECCIONADO

m3

1.02

14.09

07.01.02.04

ELIMINACION LATERAL DE MATERIAL EXCEDENTE

m3

20.24

8.93

07.01.03

OBRAS DE CONCRETO SIMPLE

07.01.03.01

CONCRETO F'C=140 KG/CM2

m3

0.57

425.41

07.01.04

OBRAS DE CONCRETO ARMADO

07.01.04.01

CONCRETO F'C= 210 KG/CM2.

m3

5.87

501.85

07.01.04.02

ENCOFRADO Y DESENCOFRADO

m2

30.22

38.43

07.01.04.03

ACERO FY= 4200 KG/CM2.

kg

199.96

5.96

07.01.05

ACABADOS Y MOLDURAS

07.01.05.01

TARRAJEO EN EXTERIORES, MORTERO 1:5

m2

28.92

27.81

07.01.05.02

TARRAJEO INTERIOR CON IMPERMEABILIZANTE

m2

30.45

18.81

07.01.05.03

PINTURA EN MUROS EXTERIORES CON ESMALTE SINTETICO

m2

28.92

16.42

07.01.06

CARPINTERIA METALICA, VALVULAS Y ACCESORIOS

07.01.06.01

TAPA SANITARIA METALICA 0.60 X 0.60M. (SUMINISTRO Y COLOCACION)

und

2.00

128.98

07.01.06.02

VALVULA COMPUERTA DE BRONCE DE 1"

und

1.00

60.32

07.01.06.03

VALVULA COMPUERTA DE BRONCE DE 3/4"

und

3.00

55.32

07.01.06.04

CANASTILLA DE BRONCE DE 2"

und

1.00

47.33

07.01.06.05

ACCESORIOS DE FG

GLB

1.00

200.00

07.01.06.06

ACCESORIOS DE PVC

GLB

1.00

100.00

07.01.06.07

TUBERIA DE VENTILACION FG DE 2"

und

1.00

41.36

07.01.06.08

SUM. E INST. DE ACCESORIOS EN RESERVORIO

GLB

1.00

283.60

07.01.06.09

CERCO PERIMETRICO DE PROTECCION DE RESERVORIO

8.00

54.79

07.02

PILETAS DOMICILIARIAS CON LAVATORIO ( 90 UND)

07.02.01

TRAZO Y REPLANTEO

m2

149.20

2.09

07.02.02

EXCAVACION MANUAL DE ZANJAS EN MATERIAL SUELTO

m3

69.37

18.02

07.02.03

CONCRETO F'C= 175 KG/CM2.

m3

10.90

449.68

07.02.04

ENCOFRADO Y DESENCOFRADO

m2

119.54

38.43

07.02.05

ACERO FY= 4200 KG/CM2.

kg

447.50

5.96

07.02.06

TARRAJEO INTERIOR CON IMPERMEABILIZANTE

m2

111.56

18.81

07.02.07

LLAVE DE PASO DE 1/2"

und

40.00

93.15

07.02.08

ACCESORIOS INSTALACIONES SANITARIAS DESAGUE

und

40.00

77.01

07.02.09

PINTURA EN MUROS EXTERIORES

m2

60.24

13.37

07.02.10

DRENAJE

m3

34.00

105.14

07.02.11

EMPEDRADO PERIMETRAL

m3

51.60

101.62

07.03

PROGRAMA DE MITIGACION Y PROTECCION AMBIENTAL

07.03.01

PROTECCION AMBIENTAL

07.03.01.01

PROGRAMA DE PROTECCION AMBIENTAL

GLB

1.00

9,500.00

07.03.02

MITIGACION Y CONTROL DE IMPACTO AMBIENTAL

07.03.02.01

LIMPIEZA AL TERMINO DE LA OBRA

3,497.00

1.53

07.03.02.02

REFORESTACION

GLB

1.00

1,755.46

07.04

FLETE
GLB

1.00

45,000.00

FLETE TERRESTRE CUSCO - TAMBOBAMBA

07.04.02

ACARREO DE MATERIALES

GLB

1.00

7,156.02

07.04.03

ACARREO DE AGREGADOS

GLB

1.00

5,585.54

08

COMPONENTE II : ALTA COBERTURA DEL SERVICIO DE DISPOSICION DE EXCRETAS

08.01

CASETA DE LETRINAS Y DUCHAS (40 UND)

08.01.01

TRAZO Y REPLANTEO

m2

396.30

2.09

08.01.02

EXCAVACION MANUAL DE ZANJAS EN MATERIAL SUELTO

m3

110.08

18.02

08.01.03

ELIMINACION LATERAL DE MATERIAL EXCEDENTE

m3

55.30

8.93

08.01.04

RELLENO CON MATERIAL PROPIO SELECCIONADO

m3

64.00

14.09

08.01.05

ENCOFRADO Y DESENCOFRADO

m2

128.76

38.43

08.01.06

CIMENTACION CORRIDA C:H 1:6 +25% PM

m3

46.08

239.27

08.01.07

SOBRECIMIENTO C:H 1:6 +25% PM

m2

13.96

243.44

08.01.08

CONCRETO F'C= 175 KG/CM2.

m3

1.14

449.68

08.01.09

ACERO FY= 4200 KG/CM2.

kg

118.72

5.96

08.01.10

TARRAJEO INTERIOR CON IMPERMEABILIZANTE

m2

500.28

18.81

08.01.11

TARRAJEO EN EXTERIORES, MORTERO 1:5

m2

575.48

27.81

08.01.12

MURO DE BLOQUETA

m2

530.68

47.20

08.01.13

BRUA DE 1.0x1.0 cm

284.00

1.58

08.01.14

COBERTURA DE CALAMINA GALVANIZADA

m2

280.00

23.28

08.01.15

PUERTA DE MADERA

und

40.00

76.28

08.01.16

INODORO EN LETRINAS

und

40.00

360.60

08.01.17

INSTALACION DE SISTEMA DE AGUA FRIA EN LETRINAS

und

40.00

320.00

08.01.18

SUMINISTRO E INST. DE ACCESORIOS EN LETRINAS

GLB

40.00

171.00

08.01.19

PINTURA EN MUROS EXTERIORES CON ESMALTE SINTETICO

m2

132.40

16.42

08.02

POZO SEPTICO ( 40 UND)

08.02.01

LIMPIEZA DE TERRENO MANUAL

m2

70.69

1.60

08.02.02

TRAZO Y REPLANTEO

m2

70.69

2.09

08.02.03

EXCAVACION MANUAL EN MATERIAL SUELTO

m3

39.27

17.85

08.02.04

RELLENO COMPACTADO CON MATERIAL SELECCIONADO, PARA ESTRUCTURAS

m3

18.00

23.79

08.02.05

ELIMINACION LATERAL DE MATERIAL EXCEDENTE

m3

47.12

8.93

08.02.06

CONCRETO F'C= 175 KG/CM2.

m3

9.00

449.68

08.02.07

ACERO FY= 4200 KG/CM2.

kg

649.60

5.96

08.02.08

FILTTRO CON AGREGADOS

m3

9.26

79.39

09

COMPONENTE III ADECUADA GESTION OPERATIVA COMERCIAL Y ADMINISTRATIVA

09.01

CAPACITACION A JASS

GLB

1.00

19,500.00

10

COMPONENTE IV "ALTOS NIVELES DE EDUCACION SANITARIA Y AMBIENTAL"

10.01

CAPACITACION A USUARIOS

GLB

1.00

19,500.00

Costo Directo

420,436.14

GASTOS GENERALES (10%)

42,043.61

COSTO DE EXPEDIENTE (3%)

12,613.08

GASTOS DE SUPERVISION (4%)

16,817.45

GASTOS DE LIQUIACION (2.5%)

10,510.90

TOTAL PRESUPUESTO
SON :

502,421.18

QUINIENTOS DOS MIL CUATROCIENTOS VEINTIUNO Y 18/100 NUEVOS SOLES

Fecha :

P
gi
na

20/05/2015

Parcial S/.

12,787.20

12,787.20
5,000.00

7,287.20
500.00

5,094.47
687.96

668.40

19.56
494.80

126.68
11.45

19.59
11.58

27.02

232.93

65.55
1,045.89

46.80
196.25

457.74
345.10

1,376.40
516.91

335.49
524.00

339.70

154.35
71.67

102.46
11.22

1,149.72
128.98

78.98
346.32

334.32

30.93
19.15

39.86
43.86

89.88
37.44

8,105.28

1,031.40

1,031.40
4,418.92

2,429.03
240.30

191.97
1,369.55

188.07
2,654.96

2,308.50
68.36
278.10
90,912.07

13,358.54

13,358.54
47,754.58

9,833.35
18,352.01

3,112.33
12,431.84

2,463.64
1,561.41

29,798.95

1,795.50
19,135.54

5,166.00

100.00
3,601.91
16,578.07

3,242.68
4.73

9.24

84.55
5.92

10.99
51.35

63.81
1,073.96

692.37
496.13

242.84

139.28
104.28

86.88
32.89

19.15
30.93

52.02
41.36

2,119.39
31.17

20.09

359.74

307.44
120.38

631.84
442.56

175.68

30.49
707.04

46.67
30.43

10.81
106.35

89.94
76.86
30.10
157.96

106.64
43.92

7.36
815.43

60.91

3.86
40.58

34.65
153.72

212.71
265.08

43.92

3,184.23
7.84

175.04
3.34

92.99

29.65
89.34

853.15
576.45

1,016.78
159.14

19.15
20.00

100.00

41.36
6,509.30

13.67
132.00

28.18
378.61

1,982.31
827.49

774.75
433.38

835.68

197.34

45.01
114.90

643.44
102.54

115,975.61
9,375.17

23.99
23.99

362.98
158.76

9.11

14.37
180.74

242.48
242.48
5,298.97
2,945.86

1,161.35
1,191.76

1,851.90
804.27

572.76
474.87

1,594.85
257.96

60.32

165.96

47.33
200.00

100.00
41.36

283.60
438.32

32,253.01
311.83

1,250.05
4,901.51

4,593.92

2,667.10
2,098.44

3,726.00
3,080.40

805.41
3,574.76

5,243.59
16,605.87

9,500.00

9,500.00
7,105.87

5,350.41
1,755.46

57,741.56
45,000.00

7,156.02

5,585.54
131,983.44

121,518.74

828.27
1,983.64

493.83
901.76

4,948.25
11,025.56

3,398.42

512.64
707.57

9,410.27
16,004.10

25,048.10
448.72
6,518.40
3,051.20

14,424.00
12,800.00

6,840.00
2,174.01

10,464.70
113.10

147.74

700.97

428.22
420.78

4,047.12
3,871.62

735.15

19,500.00

19,500.00

19,500.00

19,500.00

420,436.14

###

MEDICIONES DE AGUA
1. METODO VOLUMETRICO
Q = V/T (lit/seg)
Donde:
Q = caudal (lit/seg)
V = volumen (m3 o lit)
T = tiempo (seg)
DATOS:
ANEXO
POCPOQQERAY
NOMBRE DE LA FUENTE : ATUN PUJIO
FECHA
: 23 ABRIL del 2015
N
PRUEBA
1
2
3
4
PROM.

Volumen (lit)
EMBALSE
4
4
4
4
4

Tiempo (seg.)
3.8
3.7
3.75
3.7
3.7375

Q (l/seg) ojo 1= 1.07


Q (l/seg) total= 1.07
NOTA: El caudal de aforo corresponde en epoca de estiaje. El caudal
en estacion lluviosa se incrementara en 5 a 20 %
% INCREMENTO maximmo
20.00%
Q (l/seg)= 0.89

CALCULO DE LA POBLACION FLOTANTE


ITEM

HOSPEDAJES
n DE CAMAS
HUANCALLO

HOSPEDAJE VALICHA

11

2
1
2

HospedajeABARCA
BARRIO PAMPAA
Hospedaje MARLY
Hospedaje LEO

17
8

3
4
5

Hospedaje MENDOZA
Hospedaje HILA
Hospedaje TAMBO

6
8
21

CHECHECHCALLA
1

HOSTAL PALCARO
TOTAL
TOTAL DEMANDA DE AGUA

16
93

CALCULO DE LA POBLACION FLOTANTE


ITEM
DOTACION DE AGUA=600L/D
500

0.5

500

0.5

500

500

0.5

500

0.5

500

0.5

500

0.5

500

0.5

HOSPEDAJES
HUANCALLO
HOSPEDAJE
VALICHA

n DE CAMAS

11

1
2

HospedajeABARCA
BARRIO PAMPAA
Hospedaje MARLY
Hospedaje LEO

17
8

3
4
5

Hospedaje
MENDOZA
Hospedaje HILA
Hospedaje TAMBO

6
8
21

CHECHECHCALLA
1
HOSTAL PALCARO
0.5
TOTAL
0.5
0.5 TOTAL DEMANDA DE AGUA

2.5
500
500
500

1.5

16
93

FLOTANTE

DE CAMAS
DOTACION DE AGUA=600L/D
6600
3600
0
10200
4800
3600
4800
12600
0
9600
55800
55.8

BARRIO SAN MARTIN


N ALUMNOS
UNBAMBA

1000

I.S JOSE CARLOS MARIATEGUI

19

RUEDO DE TOROS

1000

I.E.I. APLICACIN

48

SALON COMUNAL SAN MARTIN

200

I.E.I SAN MARTIN

13

I.E. ERNESTO CASTEEDA CARAY

212

SED(CUNA)
GARAJE MUNICIPAL
M2

BARRIO PAMPAA
CARACTERISTICAS

20
40X35APOR
1400

DOTacion
de AGUA
=A

M2, CAMA,
POR
DOTACION
AHITANTE=
B

IVP TAMBOBAMBA

15

50

15

50

100

600

45

LOSA DEPORTIVA PAMPAA

875M2

CENTRO DE SALUD DE TAMBOBAMBA

42 CAMAS

ESSALUD

150M2

50

100

I.E.P SAN FRANSISCO DE ASIS

549 PBLACION

25

549

SALON COMUNAL PAMPAA

100 HABIT

25

100

MERCADO CENTRAL DE TAMBOBAMBA

13 PUESTOS 750M2

200

15

BIBLIOTECA MUNICIPAL

25 HB

25

100

FISCALIA

10

50

50

SED

25

25

50

120

120

restaurants

120

15

grifos

120

area comorecial
hospedajes

TOTAL

CAMAS =120

CAMAL MUNICIPAL
992 BOVINOS
PORCINOS
2400

1408 OVINOS
AVES

5
2
6
0

86400

TOTAL
DOTACION
DE AGUA
DOTACION LITROS=A*
B
M3

750

BARRIO HUANCALOS

750

0.750

0.00868056 MUNICIPALIDAD PROVINCIAL DE COTABAMBAS

5000

5.000

0.05787037 GOBERNATURA

27000

27.000

0.3125 BANCO DE LA NACION

5000

5.000

0.05787037 IE.PS Erasmo delgado vivanco

13725

13.725

0.15885417 salon comunal huancallo

2500

2.500

0.02893519 cementerio tambobamba

3000

3.000

0.03472222 fiscalia

2500

2.500

0.02893519 losa deportiva huancallo

2500

2.500

0.02893519 I.EI HUANCALLO

1250

1.250

0.01446759 SED(CUNA)

0.000

14400

14.400

0.16666667 area comorecial

1800

1.800

0.02083333 hospedajes 30

600

0.600

0.00694444 restaurants

80025
80.025

0 IGLESIA TAMBOBAMBA

80 0.92621528 grifos
TOTAL

CAMAS

DOATACION

TOTAL

500

2500

300

600

250

1500
0
4600

O HUANCALOS
DOTacion de A M2, CAMA, POR AHITANTM3

1050M2

50

100

5000

50

20

1000

126 M2

50

10

500

0.5

53 HAB

25

53

1325

1.325

200 HAB

25

100

2500

2.5

2500M2

25

100

2500

2.5

50

10

500

0.5

750M2

25

100

2500

2.5

18 HAB

20

50

1000

25

50

1250

1.25

25

100

2500

2.5

50

420 M2

120

30

3600

3.6

120

60

7200

7.2

120

600

0.6

31975

31.975

BARRIO SAN MARTIN


DOTACION

UNIVERSIDAD NACIONAL M. B.(UNAMBA)


INSTITUTO S.P." JCMT"
RUEDO DE TOROS

1000ALUM

25

19 HAB

25

200

25

CAMAL MUNICIPAL
I.E.I APLICACIN

200
48 HAB

25

SALON COMUNAL SAN MARTIN

200

25

I.E.I ERNESTO CASTAEDA GARAY

212

25

SED
GARGE MUNICIPAL

25
1400 M2

25

hospedajes 40 CAMAS

120

restaurants

10

grifos

area comorecial

BARRIO CHECCHECALLA

1000

25000

25

0.28935185

COMPLEJO DEPORTIVO

19

475

0.475

0.00549769

TEATRIN MUNICIPAL

800

20000

20

0.23148148

JUSGADO MIXTO

10

2000

0.02314815

PNP

48

1200

1.2

0.01388889

UGEL COTABAMBAS

200

5000

0.05787037

TEMPLO PALCCARO

212

5300

5.3

0.06134259

FISCALIA(MEDICINA LEGAL)

50

1250

1.25

0.01446759

SALON COMUNAL CHECCHECALLA

50

1250

1.25

0.01446759

PARROQUIA VIGEN ASUNTA

109

40

4800

4.8

0.05555556

I.EI. N 701 PALLCCARO

120

1200

1.2

0.01388889

ODEC TAMBOBAMBA

I,E,I CHECCHECALLA

67.475

CASA NAZARET

SED CUNA
FOSBAM
area comorecial
hospedajes 40 CAMAS
restaurants
grifos

BARRIO CHECCHECALLA

7275M2

25

300

7500

7.5

200 HAB

25

400

10000

10

25

100

2500

2.5

25

100

2500

2.5

2250 M2

50

48

2400

2.4

1050 M2

25

200

5000

25

10

250

0.25

200 HA

25

100

2500

2.5

200 HA

25

50

1250

1.25

200 HA

25

50

1250

1.25

145 HAB

25

145

3625

3.625

300

200

25

50

1250

1.25

9000

19 HB

25

19

475

0.475

25

19

475

0.475

25

19

475

0.475

25

19

475

0.475

120

20

2400

2.4

120

480

0.48

120

600

0.6

20 CAMAS

45.405

30

BARRIO INQUI

SUB REGION APURIMAC

500 M2

50

100

5000

CEMETERIO INQUI

1125 M2

25

100

2500

2.5

25

100

2500

2.5

25

100

2500

2.5

SALON COMUNAL INQUI

200

SED(CUNA)
TOTAL

12.5

7500
7.5

157

Proyecto

VIVIENDAS BENEFICIARIA DEL PROYECTO S.


PAMPAA

AOS

SAN
CHECCHECA
INQUI
MARTIN LLA

2011

-4

1085

670

335

550

390

2012

-3

1180

745

365

575

425

2013

-2

1385

840

550

610

425

2014

-1

1450

880

565

605

445

2015
2016
2017

0
1
2

2060
2124
2190

1280
1314
1348

560
588
617

1080
1095
1109

560
569
579

0
0
0

2018
2019
2020

3
4
5

2258
2328
2400

1383
1419
1456

647
679
712

1123
1138
1153

588
597
607

0
0
0

2021
2022
2023
2024

6
7
8
9

2475
2551
2630
2712

1494
1532
1572
1613

747
783
822
862

1168
1183
1198
1214

616
626
636
646

0
0
0
0

2025
2026
2027
2028

10
11
12
13

2796
2883
2972
3064

1655
1698
1742
1788

904
948
995
1043

1229
1245
1262
1278

657
667
678
689

0
0
0
0

2029
2030
2031

14
15
16

3159
3257
3358

1834
1882
1931

1095
1148
1204

1295
1311
1328

700
711
722

0
0
0

2032

17

3462

1981

1263

1346

734

2033
2034

18
19

3569
3680

2032
2085

1325
1390

1363
1381

746
758

0
0

2035

20

3794

2139

1458

1399

770

YE
C
TO
PR
O
SI
N

HUANCALLO

Fuente: Elaboracin Propia del Consu+A25:J25ltor con datos del Padron . Cuya densidad poblacional en promedio es de 5 personas/familia.

TASA DE CRECIMIENTO POR CADA BARRIO PARA LA PROYECCIO N DE N DE VIVIENDAS

0.031

0.026

0.049

0.013

0.016

VIVIENDAS BENEFICIARIA DEL PROYECTO S.


AOS

2011

-4

2012

-3

2013

-2

2014

-1

PAMPAA

HUANCALLO

217
236
277
290

134
149
168
176

SAN MARTIN CHECCHECALLA

67
73
110
113

110
115
122
121

INQUI

78
85
85
89

304

113

128

94

2015

412

256

112

216

112

2016

425

263

117

219

114

2017

438

269

123

222

116

2018

452

276

129

225

117

2019

466

284

136

227

119

2020

480

291

142

230

121

2021

495

299

149

233

123

2022

510

306

157

236

125

2023

526

314

164

240

127

2024

542

323

172

243

129

2025

10

559

331

181

246

131

2026
2027
2028
2029
2030
2031
2032
2033
2034
2035

11

576

340

190

249

133

12

594

348

199

252

136

13

613

357

209

255

138

14

632

367

219

259

140

15

651

376

230

262

142

16

671

386

241

266

144

17

692

396

253

269

147

18

714

406

265

273

149

19

736

417

278

276

151

20

759

428

292

280

154

CUADRA
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

178

2015

6 PAMP
20 PAMP
29 PAMPAA
16 PAMPAA
6 PAMPAA
19 PAMPAA
8 PAMPAA
3 PAMPAA
15 PAMPAA
18 PAMPAA
6 PAMPAA
15 PAMPAA
10 PAMPAA
43 PAMPAA
6 PAMPAA
15 PAMPAA
15 PAMPAA
10 PAMPAA
8 PAMPAA
6 PAMPAA
2 PAMPAA
20 PAMPAA

412

23
24

4 PAMPAA
4 PAMPAA

25
26
27
28
29
30
31
32
33

14 PAMPAA
7 PAMPAA
18 PAMPAA
14 PAMPAA
30 PAMPAA
1 PAMPAA
8 PAMPAA
16 PAMPAA
30 SAN

112

34

11 HUNC

256

35
36

0 HUNCALLO
46 HUNCALLO

37
38

13 SAN
11 SAN

39

12 SAN

40

8 SAN

41
42

1 SAN
18 SAN

43
44
45

7 SAN
12 SAN
2 HUNCALLO

46
47
48
49
50
51
52
53
54
55
56
57

1 HUNCALLO
10 HUNCALLO
7 HUNCALLO
18 HUNCALLO
10 HUNCALLO
8 HUNCALLO
13 HUNCALLO
10 HUNCALLO
4 HUNCALLO
10 HUNCALLO
2 HUNCALLO
7 HUNCALLO

58
59
60

7 HUNCALLO
17 HUNCALLO
13 HUNCALLO

61

15 HUNCALLO

62
63
64

9 HUNCALLO
27 HUNCALLO
9 HUNCALLO

PAMPAA
N VIVIENDAS
HOPESDAJES
RESTAURANT
GRIFOS
INSTIUCIONES

412
5
9
0
11

HUANCALSAN MARTIN CHECCHEINQUI


256
112
216
112
3
1
1
0
3
2
2
0
0
0
1
0
11
9
12
4

POBLACIN
PROYECTAD
A

3030
3290
3810
3945

RESUMEN USUARIOS
PAMPAA
HUANCALLO
SAN MARTIN
CHECCHECALLA
INQUI
TOTAL USUARIOS TAMBOBAMBA

5540
5690
5843
5999
6161
6328
6500
6675
6858
7047

FUENTE: MUNICIPALIDAD DE PROVINCIAL DE COTABAMBAS-OFICINA DE

7241
7441
7649
7862

POBLACION AO 2000
APURIMAC
419585
PROVINCIA COTABAMBAS
46831.000
DISTRITO TAMBOBAMBA
10559
DISTRITO DE CHALLHUAHUACHO
6381
PADRON DE LOS VIVIENDAS
FUENTE:PER:
PROMEDIO
Estimaciones y Proyecciones de Poblacin por Sexo, segn Departam
Distrito, 2000-2015

8083
8309
8543
8786
9035
9294

ESPINAR

9560

63801

CUSCO PROVINCIA

0.0270

LOCALIDAD
DE
TAMBOBAM
BA

606
658
762
789

RELACION DE LAS VIVIENDAS


2011 2012
2013
217
236
277
134
149
168
67
73
110
110
115
122
78
85
85
606
658
762

337326

EMIGRACION

0.005

TASA DE CRECIMIEN
TOTAL DE TASA DE

0.022
0.027

0.0018832816

0.0015776692

3.1

817
1108
1138
1168
1199
1232
1265
1299
1335
1371
1409
1448
1488
1529
1572
1616
1661
1708
1757
1807
1858
1912

Caracteristicas Generales PAMPAA


Variables y supuestos
Poblacin Ao 0

Cantidad
2015

Tasa crecim. Poblacional anual

1824
6.98%

Poblacin servida
Consumo per capita

2015

304
100

Consumo por racionamiento

Habitantes por vivienda

Instituciones Publicas

10

Consumo en lts/h/d

80025

Consumo Total

80

IVP TAMBOBAMBA

LOSA DEPORTIVA PAMPAA

CENTRO DE SALUD DE TAMBOBAMBA

36 CAMAS

ESSALUD

I.E.P SAN FRANSISCO DE ASIS

SALON COMUNAL PAMPAA


MERCADO CENTRAL DE TAMBOBAMBA

1
13 PUESTOS

BIBLIOTECA MUNICIPAL

FISCALIA

SED

area comorecial

19

hospedajes
restaurants

CAMAS =120

9
9

grifos

Prdidas fsicas ao 1-20 = K

20%

Coberturas del servicio Ao 0

0%

Coberturas del servicio Ao 1

100%

Coberturas del servicio Ao 20

100%

Capacidad de Regulacion = R

25%

FACTOR K1 (Dem. Max. Diaria)


FACTOR K2 (Dem. Max. Horaria)

1.3
2

TOTAL
1108
10
16
1
47

CION DE LAS VIVIENDAS


2014
290
176
113
121
89
789

2015 TC
304 0.06975117 6.975116951
178 0.058432193 5.843219305
113 0.110198735 11.0198735
128 0.030774003 3.077400338
94 0.03802222 3.802222005
817 0.061573055 6.157305452

3.128101386 312.8101
0.02620484
0.049420364
0.013801088
0.017051665
2.229824449
0.647

0.031
0.026
0.049
0.014
0.017

E COTABAMBAS-OFICINA DE SERVICIOS DE AGUAS


0.307178321

POBLACION AO 2015
458830 0.005978711 0.597871114
52766.000 0.007986501 0.798650111
100%
2.230 3.1281013863
11582 0.006183948 0.618394828 6.975116951 M
9908 0.029769007 2.976900742
0.061573055 6.157305452
NTE:PER:
0.022 2.229824449
n por Sexo, segn Departamento, Provincia y
o, 2000-2015
0.022298 EQUIVALENTE
0.111491222
33242 -0.04253264
450095 0.019413291

0.0051017555
0.5101755506
3.136363636

0.031281

0.031363636
940.9090909

Caracteristicas Generales HUANCALLO


Und
hab

Variables y supuestos
Poblacin Ao 0

Cantidad
2015

hab

5.84%

anual

178
80

hab
lts/h/d
lts/h/d

anual

Tasa crecim. Poblacional anual

hab
lts/h/d

Poblacin servida
Consumo per capita

lts/h/d

Consumo por racionamiento

Habitantes por vivienda

2015

Instituciones Publicas
lts

Consumo en lts/h/d

m3

Und

1068

1
31975

lts

Consumo Total

32

m3

MUNICIPALIDAD PROVINCIAL DE COTABAMBAS

GOBERNATURA

BANCO DE LA NACION

IE.PS Erasmo delgado vivanco

salon comunal huancallo

cementerio tambobamba

fiscalia

losa deportiva huancallo

I.EI HUANCALLO

SED(CUNA)

IGLESIA TAMBOBAMBA

area comorecial

hospedajes

restaurants

grifos

Prdidas fsicas ao 1-20 = K

25%

Coberturas del servicio Ao 0

0%

Coberturas del servicio Ao 1

100%

Coberturas del servicio Ao 20

100%

Capacidad de Regulacion = R

25%

FACTOR K1 (Dem. Max. Diaria)


FACTOR K2 (Dem. Max. Horaria)

1.3
2

0.031
0.026
0.049
0.014
0.017
0.0274

0.0274

27.00
29.03
29.06
29.08
29.11
29.14
29.17
29.20
29.23
29.26
29.29
29.32
30.35
30.38
30.41
30.44
30.47
30.50
30.53
30.56
30.59

Caracteristicas Generales SAN MARTIN


Variables y supuestos
Poblacin Ao 0

Cantidad
2015

Caracteristicas Generales CHECCHECALLA


Und

Variables y supuestos

678

hab

11.02%

anual

Tasa crecim. Poblacional anual

113
80

hab
lts/h/d

Poblacin servida
Consumo per capita

Consumo por racionamiento

lts/h/d

Consumo por racionamiento

Habitantes por vivienda

Tasa crecim. Poblacional anual


Poblacin servida
Consumo per capita

2015

Instituciones Publicas
Consumo en lts/h/d

Poblacin Ao 0

Habitantes por vivienda

Instituciones Publicas

67475

lts

Consumo en lts/h/d

Consumo Total

67

m3

Consumo Total

UNIVERSIDAD NACIONAL M. B.(UNAMBA)

COMPLEJO DEPORTIVO

INSTITUTO S.P." JCMT"

TEATRIN MUNICIPAL

RUEDO DE TOROS

JUSGADO MIXTO

CAMAL MUNICIPAL

PNP

I.E.I APLICACIN

UGEL COTABAMBAS

SALON COMUNAL SAN MARTIN

TEMPLO PALCCARO

I.E.I ERNESTO CASTAEDA GARAY

FISCALIA(MEDICINA LEGAL)

SED

SALON COMUNAL CHECCHECALLA

GARGE MUNICIPAL

PARROQUIA VIGEN ASUNTA

area comorecial

CASA NAZARET

hospedajes

I.EI. N 701 PALLCCARO

restaurants

ODEC TAMBOBAMBA

grifos

I,E,I CHECCHECALLA

2015
2015

SED CUNA

FOSBAM

area comorecial

hospedajes

restaurants

grifos

Prdidas fsicas ao 1-20 = K

25%

Prdidas fsicas ao 1-20 = K

Coberturas del servicio Ao 0

0%

Coberturas del servicio Ao 0

Coberturas del servicio Ao 1

100%

Coberturas del servicio Ao 1

Coberturas del servicio Ao 20

100%

Coberturas del servicio Ao 20

Capacidad de Regulacion = R

25%

Capacidad de Regulacion = R

FACTOR K1 (Dem. Max. Diaria)


FACTOR K2 (Dem. Max. Horaria)

1.3
2

FACTOR K1 (Dem. Max. Diaria)


FACTOR K2 (Dem. Max. Horaria)

Caracteristicas Generales INQUI

s Generales CHECCHECALLA
Cantidad

Und

726

hab

3.08%

anual

Tasa crecim. Poblacional anual

121
80

hab
lts/h/d

Poblacin servida
Consumo per capita

lts/h/d

6
2

Variables y supuestos
Poblacin Ao 0

Cantidad

Und

510

hab

3.80%

anual

85
80

hab
lts/h/d

Consumo por racionamiento

lts/h/d

Habitantes por vivienda

Instituciones Publicas

45405

lts

Consumo en lts/h/d

45

m3

2015
2015

1
12500

lts

Consumo Total

13

m3

SUB REGION APURIMAC

CEMETERIO INQUI

SALON COMUNAL INQUI

SED(CUNA)

25%

Prdidas fsicas ao 1-20 = K

0%

Coberturas del servicio Ao 0

0%

100%

Coberturas del servicio Ao 1

100%

100%

Coberturas del servicio Ao 20

100%

25%

Capacidad de Regulacion = R

25%

FACTOR K1 (Dem. Max. Diaria)

1.3

1.3
2

FACTOR K2 (Dem. Max. Horaria)

25%

PROYECCION DE LA DEMANDA AGUA POTABLE


PAMPAA
POBLACION
N DE
N DE
CONSUMO
AO POBLACIN COBERTUR SERVIDA A MIEMBROS CONEXIO
PERCAPITA
(1)
(2)
A(%) (3) CONEXIONES /FAMILIA
NES
(7)
(hab) (4)=(2x3)
(5)
(6)=(2/5)

0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

2060
2124
2190
2258
2328
2400
2475
2551
2630
2712
2796
2883
2972
3064
3159
3257
3358
3462
3569
3680
3794

86%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

1774
2124
2190
2258
2328
2400
2475
2551
2630
2712
2796
2883
2972
3064
3159
3257
3358
3462
3569
3680
3794

5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5

355
425
438
452
466
480
495
511
526
543
560
577
595
613
632
652
672
693
714
736
759

60.00
120.00
120.00
120.00
120.00
120.00
120.00
120.00
120.00
130.00
120.00
130.00
130.00
130.00
130.00
130.00
130.00
130.00
130.00
130.00
130.00

CONSUMO DE AGUA (l/da)

LT/DIA
(8)=(4X7)

186468
334905
342825
350985
359385
368025
377025
386145
395625
432585
415545
454815
466385
478345
490695
503435
516565
530085
543995
558425
573245

M3/ANO
LT/SEG
(9)=(8)X365/100 (10)=8/8640
0
0

68061
122240
125131
128110
131176
134329
137614
140943
144403
157894
151674
166007
170231
174596
179104
183754
188546
193481
198558
203825
209234

2.16
3.88
3.97
4.06
4.16
4.26
4.36
4.47
4.58
5.01
4.81
5.26
5.40
5.54
5.68
5.83
5.98
6.14
6.30
6.46
6.63

20

HUANCALLO
POBLACION
N DE
N DE
CONSUMO
AO POBLACIN COBERTUR SERVIDA A MIEMBROS CONEXIO
PERCAPITA
(1)
(2)
A(%) (3) CONEXIONES /FAMILIA
NES
(7)
(hab) (4)=(2x3)
(5)
(6)=(2/5)

0
1
2
3
4
5
6
7
8
9
10
11

1280
1314
1348
1383
1419
1456
1494
1532
1572
1613
1655
1698

81%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

1036
1314
1348
1383
1419
1456
1494
1532
1572
1613
1655
1698

5
5
5
5
5
5
5
5
5
5
5
5

207
263
270
277
284
292
299
307
315
323
331
340

60.00
120.00
120.00
120.00
120.00
120.00
120.00
120.00
120.00
120.00
130.00
130.00

CONSUMO DE AGUA (l/da)

LT/DIA
(8)=(4X7)

94113
189655
193735
197935
202255
206695
211255
215815
220615
225535
247125
252715

M3/ANO
LT/SEG
(9)=(8)X365/100 (10)=8/8640
0
0

34351
69224
70713
72246
73823
75444
77108
78772
80524
82320
90201
92241

1.09
2.20
2.24
2.29
2.34
2.39
2.45
2.50
2.55
2.61
2.86
2.92

12
13
14
15
16
17
18

1742
1788
1834
1882
1931
1981
2032

100%
100%
100%
100%
100%
100%
100%

1742
1788
1834
1882
1931
1981
2032

5
5
5
5
5
5
5

349
358
367
377
387
397
407

130.00
130.00
130.00
130.00
130.00
130.00
130.00

258435
264415
270395
276635
283005
289505
296135

94329
96511
98694
100972
103297
105669
108089

2.99
3.06
3.13
3.20
3.28
3.35
3.43

19
20

2085
2139

100%
100%

2085
2139

5
5

417
428

130.00
130.00

303025
310045

110604
113166

3.51
3.59

PROYECCION DE LA DEMANDA AGUA POTABLE


SAN MARTIN
CONSUMO DE AGUA (l/da)
POBLACION
N DE
N DE
CONSUMO
AO POBLACIN COBERTUR SERVIDA A MIEMBROS CONEXIO
PERCAPITA
(1)
(2)
A(%) (3) CONEXIONES /FAMILIA
NES
(7)
(hab) (4)=(2x3)
(5)
(6)=(2/5)

0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

560
588
617
647
679
712
747
783
822
862
904
948
995
1043
1095
1148
1204
1263
1325
1390
1458

76.35%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

428
588
617
647
679
712
747
783
822
862
904
948
995
1043
1095
1148
1204
1263
1325
1390
1458

5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5

86
118
124
130
136
143
150
157
165
173
181
190
199
209
219
230
241
253
265
278
292

30.00
120.00
120.00
120.00
120.00
120.00
120.00
120.00
120.00
120.00
130.00
130.00
130.00
130.00
130.00
130.00
130.00
130.00
130.00
130.00
130.00

LT/DIA
(8)=(4X7)

80302
138035
141515
145115
148955
152915
157115
161435
166115
170915
184995
190715
196825
203065
209825
216715
223995
231665
239725
248175
257015

M3/ANO
LT/SEG
(9)=(8)X365/100 (10)=8/8640
0
0

29310
50383
51653
52967
54369
55814
57347
58924
60632
62384
67523
69611
71841
74119
76586
79101
81758
84558
87500
90584
93810

0.93
1.60
1.64
1.68
1.72
1.77
1.82
1.87
1.92
1.98
2.14
2.21
2.28
2.35
2.43
2.51
2.59
2.68
2.77
2.87
2.97

PROYECCION DE LA DEMANDA AGUA POTABLE


CHECCHECALLA
CONSUMO DE AGUA (l/da)
POBLACION
N DE
N DE
CONSUMO
AO POBLACIN COBERTUR SERVIDA A MIEMBROS CONEXIO
PERCAPITA
(1)
(2)
A(%) (3) CONEXIONES /FAMILIA
NES
(7)
(hab) (4)=(2x3)
(5)
(6)=(2/5)

0
1
2

1080
1095
1109

59.26%
100%
100%

640
1095
1109

5
5
5

128
219
222

30.00
120.00
120.00

LT/DIA
(8)=(4X7)

64605
176805
178485

M3/ANO
LT/SEG
(9)=(8)X365/100 (10)=8/8640
0
0

23581
64534
65147

0.75
2.05
2.07

3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

1123
1138
1153
1168
1183
1198
1214
1229
1245
1262
1278
1295
1311
1328
1346
1363
1381
1399

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

1123
1138
1153
1168
1183
1198
1214
1229
1245
1262
1278
1295
1311
1328
1346
1363
1381
1399

5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5

225
228
231
234
237
240
243
246
249
253
256
259
263
266
270
273
277
280

120.00
120.00
120.00
120.00
120.00
120.00
120.00
130.00
130.00
130.00
130.00
130.00
130.00
130.00
130.00
130.00
130.00
130.00

180165
181965
183765
185565
187365
189165
191085
205175
207255
209465
211545
213755
215835
218045
220385
222595
224935
227275

65760
66417
67074
67731
68388
69045
69746
74889
75648
76455
77214
78021
78780
79586
80441
81247
82101
82955

2.09
2.11
2.13
2.15
2.17
2.19
2.21
2.37
2.40
2.42
2.45
2.47
2.50
2.52
2.55
2.58
2.60
2.63

PROYECCION DE LA DEMANDA AGUA POTABLE


INQUI
POBLACION
N DE
N DE
CONSUMO
AO POBLACIN COBERTUR SERVIDA A MIEMBROS CONEXIO
PERCAPITA
(1)
(2)
A(%) (3) CONEXIONES /FAMILIA
NES
(7)
(hab) (4)=(2x3)
(5)
(6)=(2/5)

0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

560
569
579
588
597
607
616
626
636
646
657
667
678
689
700
711
722
734
746
758
770
0

87.04%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

487
569
579
588
597
607
616
626
636
646
657
667
678
689
700
711
722
734
746
758
770

5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5

97
114
116
118
120
122
124
126
128
130
132
134
136
138
140
143
145
147
150
152
154

30.00
120.00
120.00
120.00
120.00
120.00
120.00
120.00
120.00
120.00
130.00
130.00
130.00
130.00
130.00
130.00
130.00
130.00
130.00
130.00
130.00

CONSUMO DE AGUA (l/da)


LT/DIA
(8)=(4X7)

27122
80780
81980
83060
84140
85340
86420
87620
88820
90020
97910
99210
100640
102070
103500
104930
106360
107920
109480
111040
112600

M3/ANO
LT/SEG
(9)=(8)X365/100 (10)=8/8640
0
0

9900
29485
29923
30317
30711
31149
31543
31981
32419
32857
35737
36212
36734
37256
37778
38299
38821
39391
39960
40530
41099

0.31
0.93
0.95
0.96
0.97
0.99
1.00
1.01
1.03
1.04
1.13
1.15
1.16
1.18
1.20
1.21
1.23
1.25
1.27
1.29
1.30

PROYECCION DE LA DEMANDA TOTAL AGUA POTABLE


151.4253107846
POBLACION
N DE
N DE
CONSUMO
AO POBLACIN COBERTUR SERVIDA A MIEMBROS CONEXIO
PERCAPITA
(1)
(2)
A(%) (3) CONEXIONES /FAMILIA
NES
(7)
(hab) (4)=(2x3)
(5)
(6)=(2/5)

0
1
2
3
4
5
6
7
8

5540
5690
5843
5999
6161
6328
6500
6675
6858

77.94%
100%
100%
100%
100%
100%
100%
100%
100%

4318
5690
5843
5999
6161
6328
6500
6675
6858

5
5
5
5
5
5
5
5
5

864
1138
1169
1200
1233
1266
1300
1335
1372

30.00
120.00
120.00
120.00
120.00
120.00
120.00
120.00
120.00

9
10
11
12
13
14
15
16
17
18
19

7047
7241
7441
7649
7862
8083
8309
8543
8786
9035
9294

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

7047
7241
7441
7649
7862
8083
8309
8543
8786
9035
9294

5
5
5
5
5
5
5
5
5
5
5

1410
1449
1489
1530
1573
1617
1662
1709
1758
1807
1859

120.00
130.00
130.00
130.00
130.00
130.00
130.00
130.00
130.00
130.00
130.00

20

9560

100%

9560

1912

130.00

CONSUMO DE AGUA (l/da)


LT/DIA
(8)=(4X7)

299433
852705
871065
889785
909225
929265
949905
970905
992865
1015545
1111235
1137235
1164275
1191965
1220695
1250075
1280495
1312085
1344455
1378125
1412705

M3/ANO
LT/SEG
(9)=(8)X365/100 (10)=8/8640
0
0

109293
311237
317939
324772
331867
339182
346715
354380
362396

3.47
9.87
10.08
10.30
10.52
10.76
10.99
11.24
11.49

370674
405601
415091
424960
435067
445554
456277
467381
478911
490726
503016

11.75
12.86
13.16
13.48
13.80
14.13
14.47
14.82
15.19
15.56
15.95

515637

16.35

DA AGUA POTABLE
A
DEMANDA DE PRODUCCION DE AGUA
PERDIDAS
DE AGUA
(11)

20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%

LT/DIA
(12)=(8/0.80)

233,085
418,631
428,531
438,731
449,231
460,031
471,281
482,681
494,531
540,731
519,431
568,519
582,981
597,931
613,369
629,294
645,706
662,606
679,994
698,031
716,556

Volumen
Almacena
DEMANDA DEMANDA miento
LT/SEG
M3/AO
MAX
MAX
m3
(14)=(10/0.80
(13)=(9/0.80)
DIARIA
HORARIA
)
LTS/SEG LTS/SEG

85076
152800
156414
160138
163970
167911
172018
176179
180504
197368
189593
207509
212789
218245
223880
229693
235683
241851
248198
254781
261543

2.88
5.17
5.29
5.41
5.55
5.68
5.81
5.96
6.11
6.68
6.41
7.01
7.20
7.39
7.57
7.77
7.97
8.19
8.40
8.61
8.84

3.74
6.73
6.88
7.04
7.21
7.38
7.56
7.75
7.94
8.68
8.34
9.12
9.36
9.60
9.85
10.11
10.37
10.64
10.92
11.20
11.49

5.76
10.35
10.59
10.83
11.09
11.36
11.63
11.92
12.21
13.36
12.83
14.03
14.40
14.77
15.15
15.55
15.95
16.37
16.80
17.23
17.68

59.00
105.00
108.00
110.00
113.00
116.00
118.00
121.00
124.00
136.00
130.00
143.00
146.00
150.00
154.00
158.00
162.00
166.00
170.00
175.00
180.0

60
120
80
70
-89846
100
105
120
120
120
80
81

BALANCE - OFE RTA DEMANDA CON PROYECTO

120
120
120
120
120
120
120
120

LO
DEMANDA DE PRODUCCION DE AGUA
PERDIDAS
DE AGUA
(11)

20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%

LT/DIA
(12)=(8/0.80)

117,641
237,069
242,169
247,419
252,819
258,369
264,069
269,769
275,769
281,919
308,906
315,894

Volumen
Almacena
DEMANDA DEMANDA miento
LT/SEG
M3/AO
MAX
MAX
m3
(14)=(10/0.80
(13)=(9/0.80)
DIARIA
HORARIA
)
LTS/SEG LTS/SEG

42,939
86,530
88,391
90,308
92,279
94,305
96,385
98,465
100,655
102,900
112,751
115,301

1.45
2.93
2.99
3.05
3.12
3.19
3.27
3.33
3.40
3.48
3.81
3.89

1.89
3.81
3.88
3.97
4.06
4.14
4.25
4.33
4.42
4.52
4.96
5.06

2.91
5.87
5.97
6.11
6.24
6.37
6.53
6.67
6.80
6.96
7.63
7.79

30.00
60.00
61.00
62.00
64.00
65.00
67.00
68.00
69.00
71.00
78.00
79.00

60
120
80
70
90
100
105
120
120
120
80
81

BALANCE - OFERTA DEMANDA CON PROYECTO

20%
20%
20%
20%
20%
20%
20%

323,044
330,519
337,994
345,794
353,756
361,881
370,169

117,911
120,639
123,368
126,215
129,121
132,086
135,111

3.99
4.08
4.17
4.27
4.37
4.47
4.57

5.18
5.30
5.43
5.55
5.69
5.81
5.95

7.97
8.16
8.35
8.53
8.75
8.93
9.15

81.00
83.00
85.00
87.00
89.00
91.00
93.00

120

20%
20%

378,781
387,556

138,255
141,458

4.68
4.79

6.08
6.22

9.36
9.57

95.00
97.0

120

DA AGUA POTABLE
IN
DEMANDA DE PRODUCCION DE AGUA
PERDIDAS
DE AGUA
(11)

LT/DIA
(12)=(8/0.80)

20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%

100,378
172,544
176,894
181,394
186,194
191,144
196,394
201,794
207,644
213,644
231,244
238,394
246,031
253,831
262,281
270,894
279,994
289,581
299,656
310,219
321,269

Volumen
LT/SEG
DEMANDA DEMANDA Almacena
M3/AO
miento
(14)=(10/0.80
MAX
MAX
(13)=(9/0.80)
m3
)
DIARIA
HORARIA
LTS/SEG LTS/SEG

36,638
62,979
64,566
66,209
67,961
69,768
71,684
73,655
75,790
77,980
84,404
87,014
89,801
92,649
95,733
98,876
102,198
105,698
109,375
113,230
117,263

1.55
2.00
2.05
2.10
2.15
2.21
2.28
2.34
2.40
2.48
2.68
2.76
2.85
2.94
3.04
3.14
3.24
3.35
3.46
3.59
3.71

2.02
2.60
2.67
2.73
2.80
2.88
2.96
3.04
3.12
3.22
3.48
3.59
3.71
3.82
3.95
4.08
4.21
4.36
4.50
4.66
4.83

3.10
4.00
4.10
4.20
4.30
4.43
4.55
4.68
4.80
4.95
5.35
5.53
5.70
5.88
6.08
6.28
6.48
6.70
6.93
7.18
7.43

25.09
44.00
45.00
46.00
47.00
48.00
50.00
51.00
52.00
54.00
58.00
60.00
62.00
64.00
66.00
68.00
70.00
73.00
75.00
78.00
81.00

DA AGUA POTABLE
LLA
DEMANDA DE PRODUCCION DE AGUA
PERDIDAS
DE AGUA
(11)

LT/DIA
(12)=(8/0.80)

20%
20%
20%

80,756
221,006
223,106

Volumen
Almacena
LT/SEG
DEMANDA
DEMANDA
M3/AO
miento
(14)=(10/0.80
MAX
MAX
(13)=(9/0.80)
m3
)
DIARIA
HORARIA
LTS/SEG LTS/SEG

29,476
80,668
81,434

1.25
2.56
2.59

1.63
3.33
3.36

2.50
5.13
5.18

20.19
56.00
56.00

120
120
120
120
120
120

20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%

225,206
227,456
229,706
231,956
234,206
236,456
238,856
256,469
259,069
261,831
264,431
267,194
269,794
272,556
275,481
278,244
281,169
284,094

82,200
83,021
83,843
84,664
85,485
86,306
87,183
93,611
94,560
95,569
96,518
97,526
98,475
99,483
100,551
101,559
102,626
103,694

2.61
2.64
2.66
2.69
2.71
2.74
2.76
2.96
3.00
3.03
3.06
3.09
3.13
3.15
3.19
3.23
3.25
3.29

3.40
3.43
3.46
3.49
3.53
3.56
3.59
3.85
3.90
3.93
3.98
4.01
4.06
4.10
4.14
4.19
4.23
4.27

5.23
5.28
5.33
5.38
5.43
5.48
5.53
5.93
6.00
6.05
6.13
6.18
6.25
6.30
6.38
6.45
6.50
6.58

57.00
57.00
58.00
58.00
59.00
60.00
60.00
65.00
65.00
66.00
67.00
67.00
68.00
69.00
69.00
70.00
71.00
72.00

DA AGUA POTABLE
DEMANDA DE PRODUCCION DE AGUA
PERDIDAS
DE AGUA
(11)

LT/DIA
(12)=(8/0.80)

40%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%

45,204
100,975
102,475
103,825
105,175
106,675
108,025
109,525
111,025
112,525
122,388
124,013
125,800
127,588
129,375
131,163
132,950
134,900
136,850
138,800
140,750

Volumen
DEMANDA DEMANDA Almacena
LT/SEG
M3/AO
MAX
MAX
miento
(14)=(10/0.80
(13)=(9/0.80)
DIARIA
HORARIA
m3
)
LTS/SEG LTS/SEG

16,500
36,856
37,404
37,896
38,389
38,936
39,429
39,976
40,524
41,071
44,671
45,265
45,918
46,570
47,223
47,874
48,526
49,239
49,950
50,663
51,374

0.52
1.16
1.19
1.20
1.21
1.24
1.25
1.26
1.29
1.30
1.41
1.44
1.45
1.48
1.50
1.51
1.54
1.56
1.59
1.61
1.63

0.67
1.51
1.54
1.56
1.58
1.61
1.63
1.64
1.67
1.69
1.84
1.87
1.89
1.92
1.95
1.97
2.00
2.03
2.06
2.10
2.11

1.03
2.33
2.38
2.40
2.43
2.48
2.50
2.53
2.58
2.60
2.83
2.88
2.90
2.95
3.00
3.03
3.08
3.13
3.18
3.23
3.25

11.30
26.00
26.00
26.00
27.00
27.00
28.00
28.00
28.00
29.00
31.00
32.00
32.00
32.00
33.00
33.00
34.00
34.00
35.00
35.00
36.00

TOTAL AGUA POTABLE

846
PERDIDAS
DE AGUA
(11)

40%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%

DEMANDA DE PRODUCCION DE AGUA


LT/DIA
(12)=(8/0.80)

499,055
1,065,881
1,088,831
1,112,231
1,136,531
1,161,581
1,187,381
1,213,631
1,241,081
1,269,431
1,389,044
1,421,544
1,455,344
1,489,956
1,525,869
1,562,594
1,600,619
1,640,106
1,680,569
1,722,656
1,765,881

DEMANDA DEMANDA Volumen


Almacena
LT/SEG
MAX
MAX
M3/AO
miento
(14)=(10/0.80 DIARIA
HORARIA
(13)=(9/0.80)
m3
)
LTS/SEG LTS/SEG

182,155
389,046
397,424
405,965
414,834
423,978
433,394
442,975
452,995
463,343
507,001
518,864
531,200
543,834
556,943
570,346
584,226
598,639
613,408
628,770
644,546

5.78
12.34
12.60
12.88
13.15
13.45
13.74
14.05
14.36

7.52
16.04
16.38
16.74
17.10
17.49
17.86
18.27
18.67

11.57
24.68
25.20
25.75
26.30
26.90
27.48
28.10
28.73

124.76
267.00
273.00
279.00
285.00
291.00
297.00
304.00
311.00

14.69
16.08
16.45
16.85
17.25
17.66
18.09
18.53
18.99
19.45
19.94

19.09
20.90
21.39
21.91
22.43
22.96
23.51
24.08
24.68
25.29
25.92

29.38
32.15
32.90
33.70
34.50
35.33
36.18
37.05
37.98
38.90
39.88

318.00
348.00
356.00
364.00
373.00
382.00
391.00
401.00
411.00
421.00
431.00

20.44

26.57

40.88

442.00

466.00

84.7457627119

102.7457627119

100
100
15.2542372881
1.3333333333
223,761.67

(85,706.25)
1.25
248,002.52

BALANCE - OFE RTA DEMANDA CON PROYECTO

12.00

0.34

BALANCE - OFERTA DEMANDA CON PROYECTO