Sie sind auf Seite 1von 2

Federal Register / Vol. 72, No.

207 / Friday, October 26, 2007 / Notices 60845

biostatistics, statistical modeling, Panel Formation Process at the ENVIRONMENTAL PROTECTION


epidemiology, meta-analysis, Bayesian Environmental Protection Agency, AGENCY
analysis and toxicology of inhaled Science Advisory Board (EPA–SAB–EC–
[ER–FRL6692–4]
particles. COM–02–010), on the SAB Web site at:
The SAB is a chartered Federal http://www.epa.gov/sab/pdf/ Environmental Impact Statements and
Advisory Committee, established by 42 ec02010.pdf. The SAB Staff Office will Regulations; Availability of EPA
U.S.C. 4365, to provide independent acknowledge receipt of nominations and Comments
scientific and technical advice, inform nominees of the panel for which
consultation, and recommendations to Availability of EPA comments
they have been nominated. From the
the EPA Administrator on the technical prepared pursuant to the Environmental
nominees identified by respondents to
bases for EPA policies and actions. The Review Process (ERP), under section
SAB expert panel will provide technical this Federal Register notice (termed the
309 of the Clean Air Act and section
advice to EPA through the chartered ‘‘Widecast’’), the SAB Staff Office will 102(2)(c) of the National Environmental
SAB. The SAB Asbestos Panel will develop a smaller subset (known as the Policy Act as amended. Requests for
comply with the provisions of the ‘‘Short List’’) for more detailed copies of EPA comments can be directed
Federal Advisory Committee Act consideration. The Short List will be to the Office of Federal Activities at
(FACA) and all appropriate SAB posted on the SAB Web site at: http:// 202–564–7167.
procedural policies. www.epa.gov/sab and will include the An explanation of the ratings assigned
Request for Nominations: The SAB nominee’s name and biographical to draft environmental impact
Staff Office is requesting nominations sketch. Public comments on the Short statements (EISs) was published in FR
for nationally and internationally List will be accepted for 21 calendar dated April 6, 2007 (72 FR 17156).
recognized non-EPA scientists with days. During this comment period, the
demonstrated expertise in biostatistics, Draft EISs
public will be requested to provide
statistical modeling, epidemiology, information, analysis or other EIS No. 20070285, ERP No. D–COE–
meta-analysis, Bayesian analysis and documentation on nominees that the K35044–CA, Berth 136–147 [TraPac]
toxicology of inhaled particles. The SAB Staff Office should consider in Container Terminal Project, Upgrade
previously submitted nominations of evaluating candidates for the panel. Existing Wharf Facilities, Install a
individuals for this Asbestos Expert Buffer Area between the Terminal and
Panel need not be re-submitted, as they For the SAB, a balanced panel is Community, US Army COE Section
will still be considered. characterized by inclusion of nominees 10 and 404 Permit, West Basin
Process and Deadline for Submitting who possess the necessary domains of Portion of the Port of Los Angeles,
Nominations: Any interested person or knowledge, the relevant scientific CA.
organization may nominate individuals perspectives (which, among other Summary: EPA expressed
qualified in the areas of expertise factors, can be influenced by work environmental concerns because the
described above to serve on the SAB history and affiliation), and the preferred alternative may not represent
Asbestos Expert Panel. Nominations collective breadth of experience to the least environmentally damaging
may be submitted in electronic format adequately address the charge. Public practicable alternative, as required
through the Form for Nominating responses to the Short List will be under the Clean Water Act Section
Individuals to Panels of the EPA Science considered in the selection of the panel 404(b)(1) Guidelines. EPA also
Advisory Board which can be accessed members, along with information expressed environmental concerns
through a link on the blue navigational provided by nominees and information about impacts to air quality and
bar on the SAB Web site at: http:// minority and low-income communities,
independently gathered by SAB Staff
www.epa.gov/sab. Please follow the and requested that the Final EIS discuss
(e.g., financial disclosure information
instructions for submitting nominations mitigation in more detail. Rating EC2.
carefully, and include all of the and computer searches to evaluate a
nominee’s prior involvement with the EIS No. 20070296, ERP No. D–AFS–
information requested on that form. The
topic under review). Specific criteria to K65332–CA, Eldorado National Forest
nominating form requests contact
be used in evaluating Short List Public Wheeled Motorized Travel
information of the person making the
nominees include: (a) Scientific and/or Management Project, Proposes to
nomination; contact information for the
technical expertise, knowledge, and Regulate Unmanaged Public Wheeled
nominee; the disciplinary and specific
experience (primary factors); (b) absence Motor Vehicle, Implementation,
areas of expertise of the nominee; the
nominee’s curriculum vita; and a of financial conflicts of interest; (c) Alpine, Amador, El Dorado and Placer
biographical sketch of the nominee scientific credibility and impartiality; Counties, CA.
indicating current position, educational (d) availability and willingness to serve; Summary: EPA expressed
background, research activities, and and (e) ability to work constructively environmental concerns about impacts
recent service on other national and effectively on committees. to water quality, meadows, riparian
advisory committees or national areas, critical habitat, and watersheds,
Dated: October 19, 2007. and requested additional information on
professional organizations. Anyone
unable to submit nominations using the Anthony F. Maciorowski, the above issues, monitoring and
electronic form, or who may have Deputy Director, EPA Science Advisory Board enforcement commitments. Rating EC2.
questions concerning the nomination Staff Office. EIS No. 20070297, ERP No. D–AFS–
process or any other aspect of this [FR Doc. E7–21092 Filed 10–25–07; 8:45 am] J65486–UT, Big Creek Vegetation
notice may contact Ms. Vivian Turner, BILLING CODE 6560–50–P Treatment Project, To Treat 4,800
DFO, at the contact information. Acres of Aspen Conifer and Sagebrush
rmajette on PROD1PC64 with NOTICES

Nominations should be submitted in Communities, Ogden Ranger District,


time to arrive no later than November Wasatch-Cache National Forest, Rich
16, 2007. County, UT.
The process for forming an SAB panel Summary: While EPA does not object
is described in the Overview of the to the proposed action, it requested

VerDate Aug<31>2005 15:23 Oct 25, 2007 Jkt 214001 PO 00000 Frm 00050 Fmt 4703 Sfmt 4703 E:\FR\FM\26OCN1.SGM 26OCN1
60846 Federal Register / Vol. 72, No. 207 / Friday, October 26, 2007 / Notices

clarification of impacts to migratory EIS No. 20070318, ERP No. F–FHW– floodplains, and the loss of upland
birds, regeneration of big sagebrush, and K40257–CA, Los Banos Bypass forest habitat. However, EPA supports
mitigation of impacts from illegal ORV Project, Construct from CA–152 in the mitigation measures and monitoring
use. Rating LO. Merced County beginning near Volta programs as described in the Final
EIS No. 20070315, ERP No. D–NOA– Road west to Los Banos, bypassing Supplemental EIS.
L91029–AK, Alaska Eskimo Whaling Los Banos, ending near the Santa Fe Dated: October 23, 2007.
Commission for a Subsistence Hunt Grade Road, U.S. Army COE Section Robert W. Hargrove,
on Bowhead Whale for the Years 2008 404 Permit, Merced County, CA.
Director, NEPA Compliance Division, Office
through 2012 for Issuing Annual Summary: EPA continues to have of Federal Activities.
Quotas, Proposes to Authorize environmental concerns about the [FR Doc. E7–21089 Filed 10–25–07; 8:45 am]
Subsistence Harvests of the Western proposed project related to induced
BILLING CODE 6560–50–P
Arctic Stock of Bowhead Whales, growth. Also, EPA recommends that the
Bering, Chukchi and Beaufort Seas, project sponsor develop a strategy to
AK. facilitate protection of valuable habitat ENVIRONMENTAL PROTECTION
Summary: While EPA does not object areas. AGENCY
to the proposed action, it requested EIS No. 20070379, ERP No. F–AFS–
L65525–AK, Baht Timber Sale Project, [ER–FRL–6692–3]
clarification on the exchange of non-
food portions of the whales between Proposes to Harvest Timber and Environmental Impacts Statements;
native villages as a commodity. Rating Temporary Road Construction on Notice of Availability
LO Zarembo Island, Wrangell Ranger
EIS No. 20070365, ERP No. D–USA– District, Tongass National Forest, AK. Responsible Agency: Office of Federal
A15000–00, PROGRAMMATIC— Summary: EPA continues to have Activities, General Information (202)
Army Growth and Force Structure concerns about potential impacts to 564–7167 or http://www.epa.gov/
Realignment, Implementation, water quality and impacts to old growth compliance/nepa/.
Nationwide. habitat, and recommends water quality Weekly receipt of Environmental Impact
Summary: EPA does not object to the monitoring, preservation of riparian Statements
proposed action. Rating LO. buffers and reduced new road Filed 10/15/2007 through 10/19/2007.
construction. Pursuant to 40 CFR 1506.9.
EIS No. 20070393, ERP No. DS–AFS–
J65424–MT, Fishtrap Project, Updated EIS No. 20070402, ERP No. F–FRC– EIS No. 20070435, Draft EIS, BLM, UT,
Information on Past Maintenance/ K03030–00, Phoenix Expansion Richfield Field Office Resource
Restorative Treatments within Old Project, Construction and Operation Management Plan, Implementation,
Growth Stands, 200 Timber Harvest, of Existing Natural Gas Transmission Future Management of the Public
Prescribed Burning, Road Pipeline, Right-of-Way Grant and Lands and Resource, Glen Canyon
Construction and Other Restoration Temporary Use Permit, San Juan and National Recreation Area, Capitol
Activities, Lolo National Forest, McKinley Counties, NM and Pinal Reef and Canyonlands National Parks,
Plains/Thompson Falls Ranger and Maricopa Counties, AZ. Sanpete, Sevier, Piute, Wayne and
District, Sanders County, MT. Summary: No formal comment letter Garfield Counties, UT. Comment
was sent to the preparing agency. Period Ends: 01/24/2008. Contact:
Summary: EPA does not object to the
EIS No. 20070058, ERP No. FA–FHW– Wayne Wetzel, 435–896–1500.
proposed action. Rating LO.
E40325–NC, Western Section of the EIS No. 20070436, Draft EIS, FHW, ME,
Final EISs Winston-Salem Northern Beltway, Wiscasset Route 1 Corridor Study
EIS No. 20070260, ERP No. F–COE– Updated Information, U.S. 158 north Project, To Relieve Traffic Congestion
K36142–CA, PROGRAMMATIC—San to U.S. 52, TIP Project No. R–2247, and Improve Safety, U.S. Army COE
Luis Obispo Creek Watershed, Forsyth County, NC. (THIS EIS section 404 Permit, Wiscasset and
Waterway Management Plan, Stream #20070058 AND EIS #20070057 ARE Edgecomb Counties, ME. Comment
Maintenance and Management Plan, COMBINED IN A SINGLE Period Ends: 12/21/2007. Contact:
City of San Luis Obispo and County DOCUMENT.) Mark Asselmann, 207622–8350.
of San Luis Obispo, Community of EIS No. 20070437, Draft EIS, NPS, HI,
Summary: EPA continues to have PROGRAMMATIC EIS—Ala Kahakai
Avila Beach, San Luis Obispo County, environmental concerns about the large
CA. National Historic Trail
bypass regarding 7–8 linear miles of Comprehensive Management Plan, To
Summary: EPA’s previous issues have stream impacts, sedimentation and Provide Long-Term Direction for
been resolved; therefore, EPA does not erosion control, terrestrial forest habitat Natural and Cultural Resource, Island
object to the proposed action. losses and impacts to migratory birds. of Hawii, HI. Comment Period Ends:
EIS No. 20070292, ERP No. F–COE– EPA requests that the Record of 12/26/2007. Contact: Aric Arakaki
K36055–CA, San Luis Rey Flood Decision disclose plans to mitigate these 808–326–6012.
Control Project, Operation and adverse impacts. EIS No. 20070438, Final Supplement,
Maintenance of the Vegetation and EIS No. 20070384, ERP No. FS–FHW– NOA, NC, Atlantic Sea Scallop
Sediment Management, from College E40714–GA, U.S. 411 Connector, Fishery Management Plan (FMP),
Blvd to the Pacific Ocean, San Diego From U.S. 411/GA–20 Interchange Amendment 11, Implementation to
County, CA. with U.S. 41 to U.S. 411 Interchange Control Capacity and Mortality in the
Summary: EPA continues to have with I–75, Updated Information, General Category Scallop Fishery,
environmental concerns because the Funding and U.S. Army COE Section Gulf of Maine, Georges Bank, NC.
rmajette on PROD1PC64 with NOTICES

preferred alternative may not represent 404 Permit, Bartow County, GA. Wait Period Ends: 11/26/2007.
the least environmentally damaging Summary: EPA continues to have Contact: Patricia A. Kurkal, 978–281–
practicable alternative, as required environmental concerns about the 9250.
under the Clean Water Act section preferred alternative regarding impacts EIS No. 20070439, Draft EIS, BOP, AL,
404(b)(1) Guidelines. to jurisdictional wetlands, regulatory Aliceville, Alabama Area, Proposed

VerDate Aug<31>2005 15:23 Oct 25, 2007 Jkt 214001 PO 00000 Frm 00051 Fmt 4703 Sfmt 4703 E:\FR\FM\26OCN1.SGM 26OCN1

Das könnte Ihnen auch gefallen