Federal Register / Vol. 72, No.

207 / Friday, October 26, 2007 / Notices 60913

ashore will be removed and non- Thursday, November 15, 2007 II


rechargeable batteries will be returned 8 a.m.–9 p.m. Hilton Arlington Hotel. On June 4, 2007, the NRC’s Office of
to South America for disposal. Open—Briefings and Panel Discussions Investigation (OI) initiated an
Conditions of the permit would include with Deputy Director, NSF. investigation into AIX’s activities at a
requirements to report on the removal of 9:30 a.m.–12n Science and facility, not owned by AIX, located in
materials and any accidental releases, Technology Policy Institute. Open— Anchorage, Alaska. This off-site facility
and management of all waste, including Presentations and briefing by STPI. is owned by an AIX client, and AIX has
human waste, in accordance with 12n–2 p.m. Science and Technology been performing radiography at that
Antarctic waste regulations. Policy Institute. Closed—Review and location since the 1990s. Based on
Application for the permit is made by: information obtained during the
evaluation of the use and need for the
Jon S. Bowermaster, OCEANS 8 investigation, serious concerns were
Institute.
Productions, Box 730, Stone Ridge, NY identified concerning the AIX senior
2:30 p.m.–4:30 p.m. Office of Science
12484. managers’ oversight of licensed
Location: Antarctic Peninsula. and Technology Policy. Closed—
Dates: December 1, 2007 to January Briefings and discussions with OSTP activities and AIX’s ability to protect the
30, 2008. representatives. public health and safety. Specifically,
AIX radiographers, including the
Nadene G. Kennedy, Friday, November 16, 2007 company Radiation Safety Officer,
Permit Officer. 8 a.m.–1:30 p.m. Hilton Arlington knowingly conducted radiography
[FR Doc. E7–21176 Filed 10–25–07; 8:45 am] Hotel. Closed—Meetings with NSF activities without the two individuals
BILLING CODE 7555–01–P representatives and other government required by 10 CFR 34.41(a) (sometimes
clients. Review and prepare report. called the 2-person rule). This occurred
Reason for Closing: The contract being on numerous instances over a period of
NATIONAL SCIENCE FOUNDATION reviewed includes information of a up to three years and presented
proprietary or confidential nature, unnecessary risk to the public health
Advisory Panel for Integrative including technical information; and safety.
Activities; Notice of Meeting financial data, such as salaries; and In the 1990s, AIX constructed a
In accordance with the Federal personal information concerning facility that was referred to as a ‘‘vault’’
Advisory Committee Act (Pub. L. 92– individuals associated with the contract. at its client’s facility. AIX applied to the
463 as amended), the National Science Discussions will include the NRC to have the ‘‘vault’’ approved as a
Foundation announces the following development of negotiating and Permanent Radiographic Installation as
meeting: implementing strategies. These matters described in 10 CFR 34.33. Radiography
Name: Advisory Panel for Integrative are exempt under 5 U.S.C. 552b(c), (4) conducted in an authorized permanent
Activities (#1373). and (6) and (9)(B) of the Government in radiographic installation could be
Dates & Times: November 14, 2007— the Sunshine Act. conducted with a single radiographer;
1 p.m.–5:30 p.m.; November 15, 2007— Dated: October 23, 2007. otherwise, 10 CFR 34.41(a) requires, in
8 a.m.–4:30 p.m.; November 16, 2003— Susanne Bolton,
part, that at least two qualified
7:30 a.m.–12:30 p.m. individuals be present during
Committee Management Officer.
Places: radiography. However, the NRC never
[FR Doc. E7–21164 Filed 10–25–07; 8:45 am] approved the ‘‘vault’’ as a Permanent
Hilton Arlington Hotel, 950 North
BILLING CODE 7555–01–P Radiographic Installation because of
Stafford Street, Arlington, Virginia.
Science and Technology Policy serious deficiencies in the design and
Institute (STPI), 1899 Pennsylvania Ave, requested further information from AIX.
NW., Washington, DC. NUCLEAR REGULATORY One of the design deficiencies was that
Office of Science and Technology COMMISSION the ‘‘vault’’ had very little shielding on
Policy (OSTP), Old Executive Office most of the front of the vault; the
Building, Washington, DC. [Docket No. 030–10346; License No. 50– shielding consisted of a lead-lined steel
Type of Meeting: Part-Open. 16084–01; EA–07–261] frame gate that was only about 31⁄2 feet
Contact Person: Connie Della-Piana, tall and an industrial tarp that was
PhD. Office of Integrative Activities, In the Matter of Alaska Industrial X- pulled across the front. As such, AIX
Office of the Director, Room 1270, Ray, Inc., Anchorage, AK; Order estimated radiation exposures 20 feet in
National Science Foundation, 4201 Suspending Licensed Activities front of the ‘‘vault’’ exceeded many
Wilson Blvd., Arlington, VA 22230. (Effective Immediately) hundred times the NRC’s 2 mR/hr limit.
Telephone: 703/292–8040. In addition, the NRC believes there was
Purpose of Meeting: To provide I
access to the roof of the facility, which
advice and recommendations Alaska Industrial X-Ray, Inc., (AIX or was made of 3⁄4 inch plywood (very
concerning the use of and need for the Licensee) is the holder of NRC License limited shielding material), resulting in
Science and Technology Policy No. 50–16084–01 issued by the Nuclear dose rates in excess of the NRC’s 2 mR/
Institute. Regulatory Commission (NRC or hr limit. The licensing action was closed
Agenda Commission) pursuant to 10 CFR Part in 2002 after AIX did not make the
34. The license authorizes the Licensee structural changes necessary to obtain
Wednesday, November 14, 2007 to conduct industrial radiography at approval.
1 p.m.–4 p.m. Hilton Arlington Hotel. temporary job sites anywhere in the The investigation revealed that on
Open—Overview and history of United States where the NRC maintains numerous occasions over a period of up
rmajette on PROD1PC64 with NOTICES

Federally Funded Research and jurisdiction for regulating licensed to three years, AIX would send two
Development Center (FFRDC); Briefings material. The license was issued on qualified individuals to the off-site
and Panel Discussions. October 24, 1990, was most recently facility to perform radiography, and that
4:30 p.m.–5:30 p.m. Hilton Arlington, renewed on March 13, 2001, and is due AIX would commence radiography in
Hotel. Closed—Review of contract. to expire on March 31, 2011. compliance with 10 CFR 34.41(a).

VerDate Aug<31>2005 15:23 Oct 25, 2007 Jkt 214001 PO 00000 Frm 00118 Fmt 4703 Sfmt 4703 E:\FR\FM\26OCN1.SGM 26OCN1
60914 Federal Register / Vol. 72, No. 207 / Friday, October 26, 2007 / Notices

However, AIX radiographers, including issued to AIX for the violation of 10 CFR 2.202 and 10 CFR part 34, it is hereby
the company radiation safety officer, 34.41(a). AIX’s corrective actions were ordered, effective immediately, that:
admitted that eventually, one individual provided by letters dated February 25, A. The authority to perform
would return to the company’s shop 2001, and March 12, 2001. radiographic operations under License
(located several miles away) to develop The NRC is continuing its review of No. 50–16084–01 is hereby suspended
film; while the remaining radiographer the information obtained through the pending further notice by the NRC. The
continued with radiography operations, investigation. However, based on the Licensee shall cease all radiographic
without the second qualified individual, information gathered thus far, the NRC operations and return all byproduct
unnecessarily endangering the public has serious concerns about the potential material possessed under this license to
health and safety. In addition, one safety consequences inherent in not locked, safe storage at the Licensee’s
radiographer admitted to performing complying with regulatory requirements facilities. All other requirements of the
radiography activities without the during radiography activities. Such License and applicable Commission
second qualified individual, at a second activities are among the most risk- requirements, including those in 10 CFR
facility owned by the licensee, several significant activities conducted by part 20 remain in effect.
times over the past year, also in material licensees and, in the absence of B. Within 24 hours following issuance
violation of 10 CFR 34.41(a). The appropriate controls, may lead to of this Order, the Licensee shall contact
company president stated he had ‘‘an significant radiation exposures to Mr. Leonard Wert, Director, Division of
inkling of what was going on’’ and that individuals. The deficiencies in the Nuclear Materials Safety, NRC Region
he ‘‘suspected it.’’ All individuals design of the ‘‘vault’’ raised numerous IV, or his designee, through the NRC
interviewed justified the violation due questions and did not meet NRC Operations Center at telephone number
to the additional safeguards that had requirements for designation as a (301) 816–5100, and advise him of the
been installed at the ‘‘vault’’ which AIX Permanent Radiographic Installation. As current location, physical status, and
had attempted to gain NRC approval as such, the NRC is concerned that a storage arrangements of licensed
a Permanent Radiographic Installation. member of the public could material. A written response
However, as noted above, the ‘‘vault’’ unknowingly be exposed as a result of documenting this information shall be
was not approved by the NRC and was AIX’s failures to follow the 2-person submitted, under oath or affirmation, to
therefore not adequate to ensure the rule. In addition, the NRC has found the Regional Administrator, U.S. NRC
protection of the public health and that AIX radiographers, including the Region IV, 611 Ryan Plaza Drive, Suite
safety; without NRC approval of this radiation safety officer, have violated 10 400, Arlington, Texas 76011 within
facility the licensee is required to follow CFR 34.41(a) on numerous instances for seven days of the date of this Order.
10 CFR 34.41(a). Use of two qualified a period of up to three years, and that C. If the Licensee removes licensed
persons observing radiographic the company president, who at a material from locked storage, the
operations provides a high level of minimum suspected violations were Licensee shall notify NRC Region IV no
assurance that members of the public occurring, did not take appropriate less than 48 hours before removal of the
will be prevented from entering the actions to stop them. In addition, the licensed material. This notice shall be
restricted area during those operations NRC had previously issued an escalated provided to Mr. Leonard Wert, Director,
and risk receiving radiation exposure enforcement action to AIX for a willful Division of Nuclear Materials Safety, or
well in excess of regulatory limits. Also, violation of the same regulation at the his designee, at telephone number (817)
the requirement of two individuals can same location. This conduct 860–8106.
further protect against high doses to undermines the trust the NRC had D. The Licensee shall not receive any
either of the qualified persons in placed in AIX’s senior officials. NRC-licensed material while this Order
circumstances whereby one of them III is in effect.
becomes incapacitated during E. All records related to licensed
Consequently, in light of the above, I activities shall be maintained in their
radiographic source exposure. lack the requisite reasonable assurance current form and must not be altered in
The NRC notes that enforcement that the Licensee’s current operations any way.
action was taken against AIX on April can be conducted under License No. 50– F. Within 60 days of the date of this
25, 2001 (EA–01–015) for a willful 16084–01 in compliance with the Order, the Licensee shall provide, in
failure to follow 10 CFR 34.41(a), while Commission’s requirements and that the writing, specific actions that are
conducting radiography at the same off- health and safety of the public, acceptable to the NRC and that provide
site facility. During an OI investigation including the Licensee’s employees, adequate assurance by independent
in 2000, a radiographer admitted he did will be protected. Therefore, the public, means that the Licensee, if it conducts
not always follow the 2-person rule on health, safety and interest require that radiography activities, will comply with
limited occasions at this same ‘‘vault’’ License No. 50–16084–01 be suspended NRC regulations.
that AIX had constructed. At the time of in part and that licensed material be The Regional Administrator, Region
the predecisional enforcement placed in locked, safe storage, pending IV, may, in writing, relax or rescind this
conference, AIX was trying to get the further review of the information in this order upon demonstration by the
‘‘vault’’ approved as a Permanent case. Furthermore, pursuant to 10 CFR Licensee of good cause.
Radiographic Installation. The company 2.202, I find that the significance of the
president and the company radiation V
violation and conduct described above
safety officer attended the predecisional is such that the public health, safety and In accordance with 10 CFR 2.202, the
enforcement conference with AIX on interest require that this Order be Licensee must, and any other person
March 13, 2001. A central issue was that immediately effective. adversely affected by this Order may,
the ‘‘vault’’ was not approved as a submit an answer to this Order within
rmajette on PROD1PC64 with NOTICES

permanent radiographic installation, IV 20 days of its issuance. In addition, the


and so the radiographer’s actions were Accordingly, pursuant to Sections 81, Licensee and any other person adversely
in violation of 10 CFR 34.41(a). The 161b, 161i, 182 and 186 of the Atomic affected by this Order may request a
NRC’s April 25, 2001, letter also made Energy Act of 1954, as amended, and hearing on this Order within 20 days of
this point, and a Notice of Violation was the Commission’s regulations in 10 CFR its issuance. Where good cause is

VerDate Aug<31>2005 15:23 Oct 25, 2007 Jkt 214001 PO 00000 Frm 00119 Fmt 4703 Sfmt 4703 E:\FR\FM\26OCN1.SGM 26OCN1
Federal Register / Vol. 72, No. 207 / Friday, October 26, 2007 / Notices 60915

shown, consideration will be given to EIE system also distributes an e-mail filings and would constitute a Fair Use
extending the time to answer or request notice that provides access to the application, Participants are requested
a hearing. A request for extension of document to the NRC Office of the not to include copyrighted materials in
time must be directed to the Director, General Counsel and any others who their works.
Office of Enforcement, U.S. Nuclear have advised the Office of the Secretary
If a person other than the Licensee
Regulatory Commission, and include a that they wish to participate in the
requests a hearing, that person shall set
statement of good cause for the proceeding, so that the filer need not
extension. serve the document on those forth with particularity the manner in
A request for a hearing must be filed participants separately. Therefore, any which his interest is adversely affected
in accordance with the NRC E-Filing others who wish to participate in the by this Order and shall address the
rule, which the NRC promulgated in proceeding (or their counsel or criteria set forth in 10 CFR 2.309(d).
August, 2007, 72 FR 49,139 (Aug. 28, representative) must apply for and If a hearing is requested by a Licensee
2007). The E-Filing process requires receive a digital ID certificate before a or a person whose interest is adversely
participants to submit and serve hearing request is filed so that they may affected, the Commission will issue an
documents over the Internet or, in some obtain access to the document via the E- Order designating the time and place of
cases, to mail copies on electronic Filing system. any hearings. If a hearing is held, the
optical storage media. Participants may A person filing electronically may issue to be considered at such hearing
not submit paper copies of their filings seek assistance through the ‘‘Contact shall be whether this Order should be
unless they seek a waiver in accordance Us’’ link located on the NRC Web site
sustained. Pursuant to 10 CFR
with the procedures described below. at http://www.nrc.gov/site-help/e-
To comply with the procedural 2.202(c)(2)(i), the Licensee, or any other
submittals.html or by calling the NRC
requirements associated with E-Filing, technical help line, which is available person adversely affected by this Order,
at least five (5) days prior to the filing between 8:30 a.m. and 4:15 p.m., may, in addition to demanding a
deadline the requestor must contact the Eastern Time, Monday through Friday. hearing, at the time the answer is filed
Office of the Secretary by e-mail at The help line number is (800) 397–4209 or sooner, move the presiding officer to
HEARINGDOCKET@NRC.GOV, or by or locally, (301) 415–4737. set aside the immediate effectiveness of
calling (301) 415–1677, to request (1) a Participants who believe that they the Order on the ground that the Order,
digital ID certificate, which allows the have good cause for not submitting including the need for immediate
participant (or its counsel or documents electronically must file a effectiveness, is not based on adequate
representative) to digitally sign motion, in accordance with 10 CFR evidence but on mere suspicion,
documents and access the E-Submittal 2.302(g), with their initial paper filing unfounded allegations, or error. In the
server for any NRC proceeding in which requesting authorization to continue to absence of any request for hearing, or
it is participating; and/or (2) creation of submit documents in paper format. written approval of an extension of time
an electronic docket for the proceeding Such filings must be submitted by (1) in which to request a hearing, the
(even in instances when the requestor first class mail addressed to the Office provisions specified in Section IV above
(or its counsel or representative) already of the Secretary of the Commission, U.S. shall be final 20 days from the date of
holds an NRC-issued digital ID Nuclear Regulatory Commission, this Order without further order or
certificate). Each requestor will need to Washington, DC 20555–0001, Attention:
proceedings. If an extension of time for
download the Workplace Forms Rulemaking and Adjudications Staff; or
requesting a hearing has been approved,
ViewerTM to access the Electronic (2) courier, express mail, or expedited
Information Exchange (EIE), a delivery service to the Office of the the provisions specified in Section IV
component of the E-Filing system. The Secretary, Sixteenth Floor, One White shall be final when the extension
Workplace Forms ViewerTM is free and Flint North, 11555 Rockville, Pike, expires if a hearing request has not been
is available at http://www.nrc.gov/site- Rockville, Maryland 20852, Attention: received. An answer or a request for
help/e-submittals/install-viewer.html. Rulemaking and Adjudications Staff. hearing shall not stay the immediate
Information about applying for a digital Participants filing a document in this effectiveness of this order.
ID certificate also is available on NRC’s manner are responsible for serving the For the Nuclear Regulatory Commission.
public Web site at http://www.nrc.gov/ document on all other participants. Dated this 19th day of October, 2007.
site-help/e-submittals/apply- Filing is considered complete by first-
certificates.html. class mail as of the time of deposit in Martin J. Virgilio,
Once a requestor has obtained a the mail, or by courier, express mail, or Deputy Executive Director for Materials,
digital ID certificate, had a docket expedited delivery service upon Waste, Research, State, Tribal, and
created, and downloaded the EIE depositing the document with the Compliance Programs and Compliance
viewer, it can then submit a request for provider of the service. Programs, Office of the Executive Director
a hearing through EIE. Submissions Documents submitted in adjudicatory for Operations.
should be in Portable Document Format proceedings will appear in NRC’s [FR Doc. E7–21117 Filed 10–25–07; 8:45 am]
(PDF) in accordance with NRC guidance electronic hearing docket which is BILLING CODE 7590–01–P
available on the NRC public Web site at available to the public at http://
http://www.nrc.gov/site-help/e- ehd.nrc.gov/EHD_Proceeding/home.asp,
submittals.html. A filing is considered unless excluded pursuant to an order of
complete at the time the filer submits its the Commission, an Atomic Safety and
document through EIE. To be timely, Licensing Board, or a Presiding Officer.
electronic filings must be submitted to Participants are requested not to include
the EIE system no later than 11:59 p.m. personal privacy information, such as
rmajette on PROD1PC64 with NOTICES

Eastern Time on the due date. Upon social security numbers, home
receipt of a transmission, the E-Filing addresses, or home phone numbers in
system time-stamps the document and their filings. With respect to copyrighted
sends the submitter an e-mail notice works, except for limited excerpts that
confirming receipt of the document. The serve the purpose of the adjudicatory

VerDate Aug<31>2005 15:23 Oct 25, 2007 Jkt 214001 PO 00000 Frm 00120 Fmt 4703 Sfmt 4703 E:\FR\FM\26OCN1.SGM 26OCN1

Das könnte Ihnen auch gefallen