56752 Federal Register / Vol. 72, No.

192 / Thursday, October 4, 2007 / Notices

EQR DATA DICTONARY.—APPENDIX C. HUB—Continued


HUB Definition

NP15 .................................... The set of delivery points north of Path 15 on the California transmission grid commonly identified as and agreed
to by the counterparties to constitute the NP15 Hub.
NWMT .................................. The set of delivery points commonly identified as and agreed to by the counterparties to constitute delivery into
the Northwestern Energy Montana balancing authority.
PJM East Hub ...................... The aggregated Locational Marginal Price nodes (‘‘LMP’’) defined by PJM Interconnection, LLC as the PJM East
Hub.
PJM South Hub .................... The aggregated Locational Marginal Price (‘‘LMP’’) nodes defined by PJM Interconnection, LLC as the PJM
South Hub.
PJM West Hub ..................... The aggregated Locational Marginal Price (‘‘LMP’’) nodes defined by PJM Interconnection, LLC as the PJM
Western Hub.
Palo Verde ........................... The switch yard at the Palo Verde nuclear power station west of Phoenix in Arizona. Palo Verde Hub includes
the Hassayampa switchyard 2 miles south of Palo Verde.
SOCO (into) ......................... The set of delivery points commonly identified as and agreed to by the counterparties to constitute delivery into
the Southern Company balancing authority.
SP15 ..................................... The set of delivery points south of Path 15 on the California transmission grid commonly identified as and agreed
to by the counterparties to constitute the SP15 Hub.
TVA (into) ............................. The set of delivery points commonly identified as and agreed to by the counterparties to constitute delivery into
the Tennessee Valley Authority balancing authority.
ZP26 ..................................... The set of delivery points associated with Path 26 on the California transmission grid commonly identified as and
agreed to by the counterparties to constitute the ZP26 Hub.

EQR DATA DICTIONARY—APPENDIX D. EQR DATA DICTIONARY—APPENDIX F. DEPARTMENT OF ENERGY


TIME ZONE RATE UNITS
Federal Energy Regulatory
Time zone Definition Rate units Definition Commission
[Project No. 2210–155]
AD ............................. Atlantic Daylight. $/KV ......... Dollars per kilovolt.
AP ............................. Atlantic Prevailing. $/KVA ...... Dollars per kilovolt amperes. Appalachian Power Company; Notice
AS ............................. Atlantic Standard. $/KVR ...... Dollars per kilovar. of Application for Amendment of
CD ............................. Central Daylight. $/KW ........ Dollars per kilowatt.
CP ............................. Central Prevailing.
License and Soliciting Comments,
$/KWH ..... Dollars per kilowatt hour. Motions To Intervene, and Protests
CS ............................. Central Standard.
$/KW–DAY Dollars per kilowatt day.
ED ............................. Eastern Daylight. September 27, 2007.
$/KW–MO Dollars per kilowatt month.
EP ............................. Eastern Prevailing.
$/KW–WK Dollars per kilowatt week. Take notice that the following
ES ............................. Eastern Standard.
MD ............................ Mountain Daylight. $/KW–YR Dollars per kilowatt year. hydroelectric application has been filed
MP ............................ Mountain Prevailing. $/MW ....... Dollars per megawatt. with the Commission and is available
MS ............................ Mountain Standard. $/MWH ..... Dollars per megawatt hour. for public inspection:
NA ............................. Not Applicable. $/MW– Dollars per megawatt day. a. Type of Application: Amendment
PD ............................. Pacific Daylight. DAY. of license for variance of minimum flow
PP ............................. Pacific Prevailing. $/MW–MO Dollars per megawatt month. release.
PS ............................. Pacific Standard. $/MW–WK Dollars per megawatt week. b. Project No.: 2210–155.
UT ............................. Universal Time. $/MW–YR Dollars per megawatt year. c. Date Filed: September 24, 2007.
$/MVAR– Dollars per megavar year. d. Applicant: Appalachian Power
YR. Company.
EQR DATA DICTIONARY—APPENDIX E. $/RKVA .... Dollars per reactive kilovar e. Name of Project: Smith Mountain
UNITS amperes. Pumped Storage Hydroelectric Project.
CENTS .... Cents. f. Location: On the Roanoke River, in
Units Definition CENTS/ Cents per kilovolt amperes. Bedford, Campbell, Franklin,
KVR. Pittsylvania, and Roanoke Counties,
KV ................................. Kilovolt. CENTS/ Cents per kilowatt hour. Virginia.
KVA .............................. Kilovolt Amperes. KWH.
KVR .............................. Kilovar.
g. Filed Pursuant to: Federal Power
FLAT Rate not specified in any Act, 16 U.S.C. 791a–825r.
KW ................................ Kilowatt. RATE. other units.
KWH ............................. Kilowatt Hour. h. Applicant Contact: Teresa P.
KW–DAY ...................... Kilowatt Day. Rogers, Environmental and Regulatory
[FR Doc. E7–19484 Filed 10–3–07; 8:45 am]
KW–MO ........................ Kilowatt Month. Affairs Supervisor, Appalachian Power
BILLING CODE 6717–01–P Company, P.O. Box No. 2021, Roanoke,
KW–WK ........................ Kilowatt Week.
KW–YR ......................... Kilowatt Year. VA 24022, (703) 985–2348.
MVAR–YR .................... Megavar Year. i. FERC Contact: CarLisa Linton-
MW ............................... Megawatt. Peters, Telephone (202) 502–8416; e-
MWH ............................ Megawatt Hour. mail: carlisa.linton-peters@ferc.gov.
MW–DAY ...................... Megawatt Day. j. Deadline for filing comments,
MW–MO ....................... Megawatt Month. motions to intervene and protests:
pwalker on PROD1PC71 with NOTICES

MW–WK ....................... Megawatt Week. October 29, 2007.


MW–YR ........................ Megawatt Year. Please include the project number (P–
RKVA ............................ Reactive Kilovolt
2210) on any comments or motions
Amperes.
FLAT RATE .................. Flat Rate. filed. All documents (an original and
eight copies) should be filed with:

VerDate Aug<31>2005 16:20 Oct 03, 2007 Jkt 214001 PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 E:\FR\FM\04OCN1.SGM 04OCN1
Federal Register / Vol. 72, No. 192 / Thursday, October 4, 2007 / Notices 56753

Kimberly D. Bose, Secretary, Federal register online at http://www.ferc.gov/ DEPARTMENT OF ENERGY


Energy Regulatory Commission, 888 docsfiling/esubscription.asp to be
First Street, NE., Washington, DC 20426. notified via e-mail of new filings and Federal Energy Regulatory
Comments, protests, and issuances related to this or other Commission
interventions may be filed electronically pending projects. For assistance, call 1– [Project No. 2232–543]
via the Internet in lieu of paper filings, 866–208–3676 or email
see 18 CFR 385.2001 (a)(1)(iii) and the ferconlinesupport@ferc.gov, for TTY, Duke Energy Carolinas, LLC; Notice of
instructions on the Commission’s Web call (202) 502–8659. A copy is also Amendment of License and Soliciting
site under the ‘‘e-filing’’ link. The Comments, Motions To Intervene, and
available for inspection and
Commission strongly encourages Protests
reproduction at the address listed in
electronic filings. The Commission’s
Rules of Practice and Procedure require item (h) above. September 27, 2007.
all intervenors filing documents with m. Individuals desiring to be included Take notice that the following
the Commission to serve a copy of that on the Commission’s mailing list should application has been filed with the
document on each person whose name so indicate by writing to the Secretary Commission and is available for public
appears on the official service list for of the Commission. inspection:
the project. Further, if an intervenor n. Comments, Protests, or Motions to a. Type of Application: Non-Project
files comments or documents with the Use of Project Lands And Waters.
Intervene: Anyone may submit
Commission relating to the merits of an b. Project Number: 2232–543.
comments, a protest, or a motion to c. Date Filed: August 29, 2007.
issue that may affect the responsibilities
of a particular resource agency, they intervene in accordance with the d. Applicant: Duke Energy Carolinas,
must also serve a copy of the document requirements of Rules of Practice and LLC.
on that resource agency. A copy of any Procedure, 18 CFR 385.210, 385.211, e. Name of Project: Catawba-Wateree
motion to intervene must also be served and 385.214. In determining the Hydroelectric Project No. 2232.
upon each representative of the appropriate action to take, the f. Location: The project is located on
Applicant specified in the particular Commission will consider all protests or the Catawba and Wateree Rivers, in nine
application. other comments filed, but only those counties in North Carolina (Burke,
k. Description of Request: who file a motion to intervene in Alexander, McDowell, Iredell, Caldwell,
Appalachian Power Company (licensee) accordance with the Commission’s Lincoln, Catawba, Gaston, and
is requesting modifications to and a Rules may become a party to the Mecklenburg Counties) and five
continuance of its current 45-day proceeding. Any comments, protests, or counties in South Carolina (York,
temporary variance of the minimum motions to intervene must be received Chester, Lancaster, Fairfield, and
flow release requirement under license on or before the specified comment date Kershaw Counties). The proposed action
article 29 for the Smith Mountain for the particular application (see item will take place in Catawba County,
Pumped Storage Hydroelectric Project. (j) above). North Carolina. This project does not
Because of persistent drought occupy Tribal or federal lands.
conditions in the general project area o. Any filing must bear in all capital g. Filed Pursuant to: Federal Power
and the need to conserve water, letters the title ‘‘COMMENTS’’, Act, 16 U.S.C. 791(a) 825(r) and 799 and
Appalachian Power Company, after ‘‘PROTEST’’, or ‘‘MOTION TO 801.
consultation with state resource INTERVENE’’, as applicable, and the h. Applicant Contact: Mr. Kelvin
agencies, requests that it be allowed to Project Number of the particular Reagan, Lake Management
continue a temporary variance under application to which the filing refers. Representative; Duke Energy
several modifying conditions (see p. Agency Comments: Federal, State, Corporation; P.O. Box 1006, Charlotte,
licensee’s request filed September 24, and local agencies are invited to file NC 28201; telephone 704–382–8386.
2007), until Smith Mountain Lake comments on the described application. i. FERC Contact: Any questions on
returns to an adjusted elevation of 794.0 this notice should be addressed to Chris
A copy of the application may be
feet. Yeakel at telephone (202) 502–8132.
obtained by agencies directly from the j. Deadline for filing comments and or
Concurrent with this notice, the
Commission granted the licensee’s Applicant. If an agency does not file motions: October 29, 2007.
requests (see Order Granting Temporary comments within the time specified for All documents (original and eight
Amendment of Minimum Flow filing comments, it will be presumed to copies) should be filed with: Secretary,
Requirement per Article 29, Project No. have no comments. One copy of an Federal Energy Regulatory Commission,
2210–155), but reserved authority to agency’s comments must also be sent to 888 First Street, NE., Washington, DC
require changes to project operation the Applicant’s representatives. 20426.
based upon comments received from q. Comments, protests and The Commission’s Rules of Practice
this notice. interventions may be filed electronically and Procedure require all interveners
l. Location of the Application: The via the Internet in lieu of paper filings. filing documents with the Commission
filing is available for inspection and See, 18 CFR 385.2001(a)(1)(iii) and the to serve a copy of that document on
reproduction at the Commission’s instructions on the Commission’s Web each person whose name appears on the
Public Reference Room, located at 888 site at http://www.ferc.gov under the ‘‘e- official service list for the project.
First Street, NE., Room 2A, Washington, Filing’’ link. Further, if an intervener files comments
DC 20426, or by calling (202) 502–8371, or documents with the Commission
or by calling (202) 502–8371. This filing Kimberly D. Bose, relating to the merits of an issue that
may also be viewed on the may affect the responsibilities of a
pwalker on PROD1PC71 with NOTICES

Secretary.
Commission’s Web site at http://ferc.gov [FR Doc. E7–19590 Filed 10–3–07; 8:45 am] particular resource agency, they must
using the ‘‘eLibrary’’ link. Enter the also serve a copy of the document on
BILLING CODE 6717–01–P
docket number excluding the last three that resource agency. A copy of any
digits in the docket number field to motion to intervene must also be served
access the document. You may also upon each representative of the

VerDate Aug<31>2005 16:20 Oct 03, 2007 Jkt 214001 PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 E:\FR\FM\04OCN1.SGM 04OCN1