Sie sind auf Seite 1von 1

55100 Federal Register / Vol. 72, No.

188 / Friday, September 28, 2007 / Rules and Regulations

⁄ inch ceramic sheathed, type K, grounded


1 16 horizontal or vertical position. Mount the the period the driver was placed out of
thermocouples with a nominal 30 American insulating material in the other position. service.
wire gage (AWG) size conductor. The seven (3) Position the burner so that flames will Penalty—Up to $16,000 per violation.
thermocouples must be attached to a steel not impinge on the specimen, turn the burner (This violation applies to motor carriers,
angle bracket to form a thermocouple rake for on, and allow it to run for 2 minutes. Rotate including an independent contractor who is
placement in the test stand during burner the burner to apply the flame to the specimen not a ‘‘driver,’’ as defined under paragraph
calibration. and simultaneously start the timing device. IVa above.)
(5) Apparatus Arrangement. The test (4) Expose the test specimen to the flame c. Violation—Operation of a commercial
burner must be mounted on a suitable stand for 5 minutes and then turn off the burner. motor vehicle by a driver after the vehicle
to position the exit of the burner cone a The test may be terminated earlier if flame was placed out of service and before the
distance of 8 inches from the ceiling liner penetration is observed. required repairs are made.
panel and 2 inches from the sidewall liner (5) When testing ceiling liner panels, Penalty—$2,100 each time the vehicle is so
panel. The burner stand should have the record the peak temperature measured 4 operated.
capability of allowing the burner to be swung inches above the sample. (This violation applies to drivers as defined
away from the test specimen during warm-up (6) Record the time at which flame in IVa above.)
periods. penetration occurs if applicable. d. Violation—Requiring or permitting the
(6) Instrumentation. A recording (h) Test Report. The test report must operation of a commercial motor vehicle
potentiometer or other suitable instrument include the following: placed out of service before the required
with an appropriate range must be used to (1) A complete description of the materials repairs are made.
measure and record the outputs of the tested including type, manufacturer, Penalty—Up to $16,000 each time the
calorimeter and the thermocouples. thickness, and other appropriate data. vehicle is so operated after notice of the
(7) Timing Device. A stopwatch or other (2) Observations of the behavior of the test defect is received.
device must be used to measure the time of specimens during flame exposure such as (This violation applies to motor carriers,
flame application and the time of flame delamination, resin ignition, smoke, etc., including an independent owner-operator
penetration, if it occurs. including the time of such occurrence. who is not a ‘‘driver,’’ as defined in IVa
(e) Preparation of Apparatus. Before (3) The time at which flame penetration above.)
calibration, all equipment must be turned on occurs, if applicable, for each of the three e. Violation—Failure to return written
and allowed to stabilize, and the burner fuel specimens tested. certification of correction as required by the
flow must be adjusted as specified in Issued in Washington, DC, on September out-of-service order.
paragraph (d)(2). 17, 2007 under authority delegated in 49 CFR Penalty—Up to $650 per violation.
(f) Calibration. To ensure the proper part 1. f. Violation—Knowingly falsifies written
thermal output of the burner the following certification of correction required by the
test must be made: Krista Edwards, out-of-service order.
(1) Remove the burner extension from the Acting Administrator. Penalty—Considered the same as the
end of the draft tube. Turn on the blower [FR Doc. E7–19207 Filed 9–27–07; 8:45 am] violations described in paragraphs IVc and
portion of the burner without turning the fuel BILLING CODE 4910–60–P IVd above, and subject to the same penalties.
or igniters on. Measure the air velocity using Note: Falsification of certification may also
a hot wire anemometer in the center of the result in criminal prosecution under 18
draft tube across the face of the opening. DEPARTMENT OF TRANSPORTATION U.S.C. 1001.
Adjust the damper such that the air velocity
g. Violation—Operating in violation of an
is in the range of 1550 to 1800 ft./min. If tabs Federal Motor Carrier Safety order issued under § 386.72(b) to cease all or
are being used at the exit of the draft tube,
they must be removed prior to this
Administration part of the employer’s commercial motor
vehicle operations, i.e., failure to cease
measurement. Reinstall the draft tube
49 CFR Part 386 operations as ordered.
extension cone.
Penalty—Up to $16,000 per day the
(2) Place the calorimeter on the test stand
Rules of Practice for Motor Carrier, operation continues after the effective date
as shown in Figure 2 at a distance of 8 inches
Broker, Freight Forwarder, and and time of the order to cease.
(203 mm) from the exit of the burner cone to
h. Violation—Conducting operations
simulate the position of the horizontal test Hazardous Materials Proceedings
during a period of suspension under
specimen.
CFR Correction §§ 386.83 or 386.84 for failure to pay
(3) Turn on the burner, allow it to run for
penalties.
2 minutes for warm-up, and adjust the In Title 49 of the Code of Federal Penalty—Up to $11,000 for each day that
damper to produce a calorimeter reading of Regulations, Parts 300 to 399, revised as operations are conducted during the
8.0 ±0.5 BTU per ft.2 sec. (9.1 ±0.6 Watts/ of October 1, 2006, on page 276, in suspension period.
cm2).
(4) Replace the calorimeter with the
Appendix A to Part 386, reinstate [FR Doc. 07–55515 Filed 9–27–07; 8:45 am]
thermocouple rake. Section IV to read as follows: BILLING CODE 1505–01–D
(5) Turn on the burner and ensure that Appendix A to Part 386—Penalty
each of the seven thermocouples reads 1700 Schedule; Violations of Notices and
°F. ±100 °F. (927 °C. ±38 °C.) to ensure steady DEPARTMENT OF TRANSPORTATION
state conditions have been achieved. If the
Orders
temperature is out of this range, repeat steps * * * * * Federal Motor Carrier Safety
2 through 5 until proper readings are Administration
obtained. IV. Out-of-Service Order
(6) Turn off the burner and remove the a. Violation—Operation of a commercial 49 CFR Part 386
thermocouple rake. vehicle by a driver during the period the
(7) Repeat (1) to ensure that the burner is driver was placed out of service. RIN 2126–AB12
in the correct range. Penalty—Up to $2,100 per violation.
(g) Test Procedure. (1) Mount a (For purposes of this violation, the term Civil Penalties Adjustments
thermocouple of the same type as that used ’’driver‘‘ means an operator of a commercial
for calibration at a distance of 4 inches (102 motor vehicle, including an independent AGENCY: Federal Motor Carrier Safety
rwilkins on PROD1PC63 with RULES

mm) above the horizontal (ceiling) test contractor who, while in the course of Administration (FMCSA), DOT.
specimen. The thermocouple should be operating a commercial motor vehicle, is ACTION: Final rule.
centered over the burner cone. employed or used by another person.)
(2) Mount the test specimen on the test b. Violation—Requiring or permitting a SUMMARY: This final rule specifies
stand shown in Figure 1 in either the driver to operate a commercial vehicle during inflation adjustments to civil penalties

VerDate Aug<31>2005 18:21 Sep 27, 2007 Jkt 211001 PO 00000 Frm 00090 Fmt 4700 Sfmt 4700 E:\FR\FM\28SER1.SGM 28SER1

Das könnte Ihnen auch gefallen