Sie sind auf Seite 1von 37

Signaling

procedures
MINA ADLY

Understand signaling procedures for:


Call process
Intra Frequency HO process
Intra freq HO signaling RL addition
Intra freq HO signaling RL deletion
Intra freq inter RNC HO signaling RL addition
Inter freq ho signaling

Inter RAT ho signaling


Location update process

M.Adly

Page 3

Outgoing Call process signaling


In the coming slides we will explain the main signaling stages for an
outgoing call signaling process which is divided into the following
main parts

1.

RRC setup

2.

Signaling connection setup

3.

Authentication and Security Mode Control Procedure

4.

Call Setup Procedure (Outgoing Call)

5.

The RAB setup procedure is performed to set up a user plane bearer.

M.Adly

Page 3

Outgoing Call process signaling


RRC setup
First a UE send a request for RRC

M.Adly

Page 3

Outgoing Call process signaling


RRC setup
Then the RNC start negotiating with the Node B to activate a Radio

link

M.Adly

Page 3

Outgoing Call process signaling


RRC setup
Then the RNC start preparing a transmission channel on the IUB

between it and the Node b

M.Adly

Page 3

Outgoing Call process signaling


RRC setup
Finally the RNC send a setup request to the mobile and when the UE

send back a setup complete message so the RRC is successfully


assigned

M.Adly

Page 3

Outgoing Call process signaling


RRC setup
Now if we are checking from Assistant what we will get is like this:

1
2
3

M.Adly

Page 3

Outgoing Call process signaling


Signaling connection setup:
The signaling connection setup procedure is performed between the

UE and the CN to exchange NAS information, such as information


about authentication, service request, and connection setup.

CC --------connection confirm
CJ -------- connection reject
M.Adly

Page 3

Outgoing Call process signaling


Signaling connection setup:
And from assistant it is like below:

M.Adly

Page 3

Outgoing Call process signaling


Authentication and Security Mode Control Procedure :

Auth

Security
M.Adly

Page 3

Outgoing Call process signaling


Authentication and Security Mode Control Procedure :

M.Adly

Page 3

Outgoing Call process signaling


Call Setup Procedure :
The UE sends to the SRNC an UPLINK DIRECT TRANSFER

message that contains the number of the called number and the
information about the bearing capability of the call.

M.Adly

Page 3

Outgoing Call process signaling


Call Setup Procedure :
The UE sends to the SRNC an UPLINK DIRECT TRANSFER

message that contains the number of the called number and the
information about the bearing capability of the call.

M.Adly

Page 3

Outgoing Call process signaling

Call Setup Procedure :


The SRNC transparently sends the contents of the UPLINK DIRECT

TRANSFER message to the CN through a DIRECT TRANSFER


message.

M.Adly

Page 3

Outgoing Call process signaling


Call Setup Procedure :

The CN sends a DIRECT TRANSFER message to the SRNC. The

message indicates CALL PROCEEDING and contains the


information about the negotiated bearing capability of the call.

M.Adly

Page 3

Outgoing Call process signaling


Call Setup Procedure :
The SRNC transparently sends the contents of the DIRECT

TRANSFER message to the UE through a DOWNLINK DIRECT


TRANSFER message.

M.Adly

Page 3

Outgoing Call process signaling


Call Setup Procedure :
Then the RAB assignment process starts (we will explain in details)

M.Adly

Page 3

Outgoing Call process signaling


Call Setup Procedure :
RAB assignment
The CN sends an RAB ASSIGNMENT REQUEST message to the

SRNC to initiate the RAB setup procedure.

M.Adly

Page 3

Outgoing Call process signaling


Call Setup Procedure :
RAB assignment
Then the CN and the SRNC start arranging the transmission link for

this specific service and according to its QOS

M.Adly

Page 3

Outgoing Call process signaling


Call Setup Procedure :
RAB assignment
The SRNC sends to the NodeB a RADIO LINK RECONFIGURATION

PREPARE message, requesting the NodeB to prepare for adding one or more
DCHs to the existing radio links for carrying the RAB.
The NodeB allocates the appropriate resources and then sends a RADIO

LINK RECONFIGURATION READY message to the SRNC.

M.Adly

Page 3

Outgoing Call process signaling


Call Setup Procedure :
RAB assignment
The Iub ALCAP at the SRNC initiates a setup procedure for an Iub user plane

transport bearer. The NodeB and the SRNC perform synchronization by


exchanging uplink and downlink synchronization frames in the DCH frame
protocol.

M.Adly

Page 3

Outgoing Call process signaling


Call Setup Procedure :
RAB assignment
The SRNC sends a RADIO BEARER SETUP message to the UE.
The SRNC sends a RADIO LINK RECONFIGURATION COMMIT message to the NodeB.

M.Adly

Page 3

Outgoing Call process signaling


Call Setup Procedure :
RAB assignment
After performing radio bearer setup, the UE sends a RADIO BEARER

SETUP COMPLETE message to the SRNC.


The SRNC sends an RAB ASSIGNMENT RESPONSE message to the CN.

M.Adly

Page 3

Outgoing Call process signaling


Call Setup Procedure :
RAB assignment
And from assistant it is so easy .

1
2

M.Adly

Page 3

Outgoing Call process signaling


Call Setup Procedure :
When the called UE rings, the CN sends to the SRNC a DIRECT

TRANSFER message, indicating ALERTING

M.Adly

Page 3

Outgoing Call process signaling


Call Setup Procedure :
The SRNC transparently sends the contents of the DIRECT

TRANSFER message to the UE through a DOWNLINK DIRECT


TRANSFER message.

M.Adly

Page 3

Outgoing Call process signaling


Call Setup Procedure :
The CN sends to the SRNC a DIRECT TRANSFER message,

indicating CONNECT. This means the called has answered the call.

M.Adly

Page 3

Outgoing Call process signaling


Call Setup Procedure :

The SRNC transparently sends the contents of the DIRECT TRANSFER

message to the UE through a DOWNLINK DIRECT TRANSFER message.


The UE sends an UPLINK DIRECT TRANSFER message to the SRNC.

The SRNC transparently sends the contents of the UPLINK DIRECT

TRANSFER message to the CN through a DIRECT TRANSFER message,


indicating CONNECT ACKNOWLEDGE.

M.Adly

Page 3

Outgoing Call process signaling


Call Setup Procedure :
In case of a PS session we will find a PDP activation request and success in the

signaling like below


As you can see it start with the RAB start and success after the RAB success

1
2
2

M.Adly

Page 3

Intra freq HO signaling RL addition

M.Adly

Page 3

Intra freq HO signaling RL deletion

M.Adly

Page 3

Intra freq inter RNC HO signaling RL


addition

M.Adly

Page 3

Inter freq ho signaling

M.Adly

Page 3

Inter RAT ho signaling

M.Adly

Page 3

Location update process

M.Adly

Page 3

Das könnte Ihnen auch gefallen