46454 Federal Register / Vol. 72, No.

160 / Monday, August 20, 2007 / Notices

protests on persons other than the The U.S. Army Corps of Engineers the Calhoun LNG Project. Calhoun Point
Applicant. (Corps), U.S. Coast Guard, (Coast Comfort would use the CCND’s turning
The Commission encourages Guard), U.S. Fish and Wildlife Service basin to maneuver its LNG ships.
electronic submission of protests and (FWS); National Oceanic and Dependent upon Commission
interventions in lieu of paper using the Atmospheric Administration, National approval, Calhoun Point Comfort
‘‘eFiling’’ link at http://www.ferc.gov. Marine Fisheries Service (NOAA anticipates it would complete
Persons unable to file electronically Fisheries); U.S. Environmental construction and begin operating the
should submit an original and 14 copies Protection Agency (EPA); and the U.S. proposed Project in 2010.
of the protest or intervention to the Department of Transportation (DOT) are The Final EIS has been placed in the
Federal Energy Regulatory Commission, federal cooperating agencies for the public files of the FERC and is available
888 First Street, NE., Washington, DC development of this EIS. A federal for public inspection at: Federal Energy
20426. cooperating agency has jurisdiction by Regulatory Commission, Public
This filing is accessible on-line at law or special expertise with respect to Reference Room, 888 First Street NE.,
http://www.ferc.gov, using the any environmental impact involved Room 2A, Washington, DC 20426, (202)
‘‘eLibrary’’ link and is available for with the proposal and is involved in the 502–8371.
review in the Commission’s Public NEPA analysis. A limited number of copies of the
Reference Room in Washington, DC. The general purpose of the proposed Final EIS are available from the Public
There is an ‘‘eSubscription’’ link on the Project is to import, store, and vaporize Reference Room identified above. In
Web site that enables subscribers to on average about 1.0 billion cubic feet addition, the Final EIS has been mailed
receive e-mail notification when a per day (bcfd) of LNG to provide a to affected landowners; various federal,
document is added to a subscribed competitive supply of natural gas to state, and local government agencies;
docket(s). For assistance with any FERC local industrial customers and to deliver elected officials; environmental and
natural gas into existing interstate and public interest groups; Native American
Online service, please e-mail
intrastate natural gas pipelines. tribes; local libraries and newspapers;
FERCOnlineSupport@ferc.gov, or call
The Final EIS addresses the potential intervenors; and other individuals that
(866) 208–3676 (toll free). For TTY, call
environmental impacts from the expressed an interest in the proposed
(202) 502–8659.
construction and operation of the Project.
Kimberly D. Bose, following facilities: In accordance with the Council on
Secretary. • A new marine terminal on the Environmental Quality’s (CEQ)
[FR Doc. E7–16245 Filed 8–17–07; 8:45 am] southeastern shore of Lavaca Bay, south regulations implementing NEPA, no
BILLING CODE 6717–01–P of Point Comfort, in Calhoun County, agency decision on a proposed action
Texas that could accommodate about may be made until 30 days after the EPA
120 LNG vessels per year; publishes a notice of availability of a
DEPARTMENT OF ENERGY • two full containment LNG storage Final EIS. However, the CEQ regulations
tanks each with a nominal working provide an exception to this rule when
Federal Energy Regulatory volume of approximately 160,000 m3 an agency decision is subject to a formal
Commission (1,006,000 barrels equivalent); internal process that allows other
• associated LNG vaporization and agencies or the public to make their
[Docket Nos. CP05–91–000; CP05–380–000] processing equipment; views known. In such cases, the agency
• an approximately 27.1-mile-long, decision may be made at the same time
Calhoun LNG, L.P., Point Comfort 36-inch-diameter natural gas pipeline the notice of the Final EIS is published,
Pipeline Company, L.P.; Notice of extending northward from the LNG allowing both periods to run
Availability of the Final Environmental terminal to natural gas pipeline concurrently. Should the FERC issue
Impact Statement for the Proposed interconnects southwest of Edna, Texas; Calhoun Point Comfort authorizations
Calhoun LNG Terminal and Pipeline • a 0.25-mile-long, 8-inch-diameter for the proposed Project, it would be
Project natural gas pipeline lateral extending subject to a 30-day rehearing period.
from the proposed pipeline to a meter Therefore, the Commission could issue
August 10, 2007. station servicing the Formosa its decision concurrently with the EPA’s
The staff of the Federal Energy Hydrocarbons Company (Formosa notice of availability.
Regulatory Commission (FERC or Lateral); Additional information about the
Commission) has prepared this Final • a 0.25-mile-long, 16-inch-diameter proposed Project is available from the
Environmental Impact Statement (EIS) natural gas pipeline lateral extending Commission’s Office of External Affairs,
for a liquefied natural gas (LNG) import from the proposed pipeline to a meter at 1–866–208–FERC or on the FERC
terminal and natural gas pipeline station servicing the Transcontinental Internet Web site (http://www.ferc.gov).
facilities proposed by Calhoun LNG, Gas Pipeline Corporation (Transco To access information via the FERC Web
L.P. and Point Comfort Pipeline Lateral); site click on the ‘‘eLibrary’’ link then
Company, L.P. (collectively referred to • ten delivery points/interconnects; click on ‘‘General Search’’ and enter the
as Calhoun Point Comfort) in the above- and docket number (CP05–91) excluding the
referenced dockets. The Calhoun LNG • associated pipeline facilities last three digits in the Docket Number
Terminal and Pipeline Project (Project) including pig launcher and receiver field. Be sure you have selected an
would be located in Calhoun and facilities and three mainline valves. appropriate date range. The ‘‘eLibrary’’
Jackson Counties, Texas. In a separate, but related action, the link provides access to the texts of
The Final EIS was prepared to satisfy Calhoun County Navigational District formal documents issued by the
the requirements of the National (CCND) would dredge a turning basin Commission, such as orders, notices,
pwalker on PROD1PC71 with NOTICES

Environmental Policy Act (NEPA). The and ship berth affecting about 49 acres and rulemakings. For assistance with
FERC staff concludes that the proposed of Lavaca Bay, resulting in the need to ‘‘eLibrary’’, please contact FERC Online
Project, with the appropriate mitigation dispose of approximately 2.7 million Support at FercOnlineSupport@ferc.gov
measures as recommended, would have cubic yards of dredged material. This or toll free at 1–866–208–3676, or for
limited adverse environmental impact. activity is essential to the operation of TTY, contact (202) 502–8659.

VerDate Aug<31>2005 16:53 Aug 17, 2007 Jkt 211001 PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 E:\FR\FM\20AUN1.SGM 20AUN1
Federal Register / Vol. 72, No. 160 / Monday, August 20, 2007 / Notices 46455

In addition, the Commission now extend from CIG’s existing Cheyenne on August 28, 2007, at the following
offers a free service called eSubscription Compressor Station to an interconnect location: Best Western Hotel, 701 8th
which allows you to keep track of all point on the proposed Line 251A in Street, Greeley, CO 80631, (970) 353–
formal issuances and submittals in northeast Adams County; 8444.
specific dockets. This can reduce the • Line 251A: 57.9 miles of 24-inch- The public comment meetings will be
amount of time you spend researching diameter pipeline between CIG’s posted on the FERC’s calendar located
proceedings by automatically providing existing Watkins and Fort Morgan at http://www.ferc.gov/EventCalendar/
you with notification of these filings, Compressor Stations; EventsList.aspx. Interested groups and
document summaries and direct links to • Line 252A: 14.9 miles of 30-inch- individuals are encouraged to attend
these documents. To learn more about diameter pipeline extending westward and present oral comments on the Draft
eSubscription and to sign-up for this from a point on the proposed Line 250A EIS. Transcripts of the meetings will be
service please go to http://www.ferc.gov/ about one mile north of the existing prepared. This notice is being mailed to
esubscribenow.htm. Hudson Power Plant in the Town of parties who are on the mail list for the
Hudson, Colorado, to a new Draft EIS.
Kimberly D. Bose, interconnect with Public Service After the comments received are
Secretary . Company of Colorado’s existing Tri- reviewed, any significant new issues are
[FR Doc. E7–16252 Filed 8–17–07; 8:45 am] Town facilities in Weld County, investigated, and modifications are
BILLING CODE 6717–01–P Colorado; made to the Draft EIS, a Final EIS will
• Line 253A: 6.1 miles of 24-inch- be published and distributed by the
diameter pipeline extending westward FERC staff. The Final EIS will contain
DEPARTMENT OF ENERGY from the Watkins Compressor Station to the staff’s responses to timely comments
CIG’s existing East Denver measurement received on the Draft EIS.
Federal Energy Regulatory facility in Adams County, Colorado; Comments will be considered by the
Commission • Ten new meter stations and 19 new Commission but will not serve to make
[Docket No. CP07–207–000] block valves; and the commentor a party to the
• Twelve pig launcher/receivers. proceeding. Any person seeking to
Colorado Interstate Gas Company; The entire project would be capable of become a party to the proceeding must
Notice of Availability of the Draft transporting about 899,000 decatherms file a motion to intervene pursuant to
Environmental Impact Statement and of gas per day. CIG proposes to begin Rule 214 of the Commission’s Rules of
Public Comment Meeting for the construction in January 2008. It would Practice and Procedures (18 CFR
Proposed High Plains Expansion put each pipeline segment into service 385.214). Anyone may intervene in this
Project as it is completed, and the entire Project proceeding based on this Draft EIS. You
would be in service by October 2008. must file your request to intervene as
August 10, 2007. Any person wishing to comment on specified above.1 You do not need
The staff of the Federal Energy the Draft EIS may do so. To ensure that intervenor status to have your
Regulatory Commission (FERC or your comments are timely and properly comments considered.
Commission) has prepared this Draft recorded so that they may be considered The Draft EIS has been placed in the
Environmental Impact Statement (EIS) in the Final EIS, please carefully follow public files of the FERC and is available
for the natural gas pipeline facilities these instructions: for public inspection at: Federal Energy
proposed by Colorado Interstate Gas • Send an original and two copies of Regulatory Commission, Public
Company’s (CIG) under the above- your letter to: Kimberly D. Bose, Reference Room, 888 First Street, NE.,
referenced docket. CIG’s High Plains Secretary, Federal Energy Regulatory Room 2A, Washington, DC 20426, (202)
Expansion Project (Project) would be Commission, 888 First Street, NE., 502–8371.
located in Weld, Morgan, and Adams Room 1A, Washington, DC 20426. A limited number of copies of the
Counties, Colorado. • Label one copy of your comments to Draft EIS are available from the Public
The Draft EIS was prepared to satisfy the attention of Gas Branch 2, DG2E; Reference Room identified above. In
the requirements of the National • Reference Docket No. CP07–207– addition, CD copies of the Draft EIS
Environmental Policy Act. The FERC 000 on the original and both copies; and have been mailed to affected
staff concludes that the proposed • Mail your comments so that they landowners; various federal, state, and
Project, with the appropriate mitigation will be received in Washington, DC, on local government agencies; elected
measures as recommended, would have or before October 1, 2007. officials; environmental and public
limited adverse environmental impact. Please note that the Commission interest groups; Native American tribes;
The purpose of the Project is to strongly encourages electronic filing of local libraries and newspapers;
expand CIG’s existing pipeline system any comments to this proceeding. intervenors; and other individuals that
along Colorado’s Front Range in order to Instructions on ‘‘eFiling’’ comments can expressed an interest in the proposed
provide additional transportation be found on the Commission’s Web site Project. Hard-copies of the Draft EIS
services to this rapidly growing market. at http://www.ferc.gov under the have also been mailed to those who
CIG is proposing to construct about ‘‘Documents and Filings’’ link and the requested that format during the scoping
163.7 miles of 24-inch and 30-inch- link to the User’s Guide. Before you can and comment periods for the proposed
diameter pipeline in four separate file comments, you will need to open a Project.
pipeline segments and associated free account which can be created on- Additional information about the
ancillary facilities. line. proposed Project is available from the
The Draft EIS addresses the potential In lieu of or in addition to sending
Commission’s Office of External Affairs,
environmental impacts resulting from written comments, we invite you to
pwalker on PROD1PC71 with NOTICES

at 1–866–208-FERC or on the FERC


the construction and operation of the attend a public comment meetings the
Internet Web site (http://www.ferc.gov).
following facilities: FERC will conduct in the Project area to
• Line 250A: 64.5 miles of 30-inch- receive comments on the Draft EIS. 1 Interventions may also be filed electronically via
diameter pipeline and 20.3 miles of 24- FERC staff will be in attendance. The the Internet in lieu of paper. See the previous
inch-diameter pipeline that would meeting is scheduled for 6:30 pm (MST) discussion on filing comments electronically.

VerDate Aug<31>2005 16:53 Aug 17, 2007 Jkt 211001 PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 E:\FR\FM\20AUN1.SGM 20AUN1