Sie sind auf Seite 1von 2

46050 Federal Register / Vol. 72, No.

158 / Thursday, August 16, 2007 / Notices

to the National Environmental Policy and principal place of business in Copies of this application will be
Act of 1969, and a determination is Toronto, Ontario, Canada, has requested made available, upon request, for public
made by the DOE that the proposed an electricity export authorization with inspection and copying at the address
action will not adversely impact on the a 5-year term. RBC Energy does not own provided above and at http://
reliability of the U.S. electric power or control any electric generation, www.oe.energy.gov/304.htm.
supply system. transmission, or distribution assets, nor Issued in Washington, DC, on August 10,
Copies of this application will be does it have a franchised service area. 2007.
made available, upon request, for public The electric energy which RBC Energy Anthony J. Como,
inspection and copying at the address proposes to export to Canada would be Director, Permitting and Siting, Office of
provided above or by accessing the surplus energy purchased from electric Electricity Delivery and Energy Reliability.
program’s Home Page at http:// utilities, Federal power marketing [FR Doc. E7–16105 Filed 8–15–07; 8:45 am]
www.oe.energy.gov/304.htm. agencies, and other entities within the
BILLING CODE 6450–01–P
Issued in Washington, DC on August 10, United States.
2007. RBC Energy will arrange for the
Anthony J. Como, delivery of exports to Canada over the DEPARTMENT OF ENERGY
Director, Permitting and Siting, Office of international transmission facilities
presently owned by Basin Electric [OE Docket No. EA–329]
Electricity Delivery and Energy Reliability.
[FR Doc. E7–16132 Filed 8–15–07; 8:45 am] Power Cooperative, Bonneville Power
Application to Export Electric Energy;
Administration, Eastern Maine Electric
BILLING CODE 6450–01–P Sierra Power Asset Marketing, LLC
Cooperative, International Transmission
Co., Joint Owners of the Highgate AGENCY: Office of Electricity Delivery
DEPARTMENT OF ENERGY Project, Long Sault, Inc., Maine Electric and Energy Reliability, DOE.
Power Company, Maine Public Service ACTION: Notice of Application.
[OE Docket No. EA–328] Company, Minnesota Power, Inc.,
Minnkota Power Cooperative, Inc., New SUMMARY: Sierra Power Asset Marketing,
Application To Export Electric Energy; LLC (Sierra Power) has applied for
York Power Authority, Niagara Mohawk
RBC Energy Services L.P. authority to transmit electric energy
Power Corp., Northern States Power
AGENCY: Office of Electricity Delivery Company, Vermont Electric Power from the United States to Canada
and Energy Reliability, DOE. Company, and Vermont Electric pursuant to section 202(e) of the Federal
ACTION: Notice of application. Transmission Co. Power Act.
The construction, operation, DATES: Comments, protests, or requests
SUMMARY: RBC Energy Services L.P. maintenance, and connection of each of to intervene must be submitted on or
(RBC Energy) has applied for authority the international transmission facilities before September 17, 2007.
to transmit electric energy from the to be utilized by RBC Energy has ADDRESSES: Comments, protests, or
United States to Canada pursuant to previously been authorized by a requests to intervene should be
section 202(e) of the Federal Power Act. Presidential permit issued pursuant to addressed as follows: Office of
DATES: Comments, protests, or requests Executive Order 10485, as amended. Electricity Delivery and Energy
to intervene must be submitted on or Procedural Matters: Any person Reliability, Mail Code: OE–20, U.S.
before September 17, 2007. desiring to become a party to these Department of Energy, 1000
ADDRESSES: Comments, protests, or proceedings or to be heard by filing Independence Avenue, SW.,
requests to intervene should be comments or protests to this application Washington, 20585–0350 (FAX 202–
addressed as follows: Office of should file a petition to intervene, 586–8008).
Electricity Delivery and Energy comment, or protest at the address FOR FURTHER INFORMATION CONTACT:
Reliability, Mail Code: OE–20, U.S. provided above in accordance with Ellen Russell (Program Office) 202–586–
Department of Energy, 1000 385.211 or 385.214 of the Federal 9624 or Michael Skinker (Program
Independence Avenue, SW., Energy Regulatory Commission’s Rules Attorney) 202–586–2793.
Washington, DC 20585–0350 (FAX 202– of Practice and Procedures (18 CFR SUPPLEMENTARY INFORMATION: Exports of
586–8008). 385.211, 385.214). Fifteen copies of each electricity from the United States to a
FOR FURTHER INFORMATION CONTACT: petition and protest should be filed with foreign country are regulated by the
Ellen Russell (Program Office) 202–586– DOE on or before the date listed above. Department of Energy (DOE) pursuant to
9624 or Michael Skinker (Program Comments on the RBC Energy sections 301(b) and 402(f) of the
Attorney) 202–586–2793. application to export electric energy to Department of Energy Organization Act
SUPPLEMENTARY INFORMATION: Exports of Canada should be clearly marked with (42 U.S.C. 7151(b), 7172(f)) and require
electricity from the United States to a Docket No. EA–328. Additional copies authorization under section 202(e) of
foreign country are regulated by the are to be filed directly with David J. the FPA (16 U.S.C.824a(e)).
Department of Energy (DOE) pursuant to Levine, Robin J. Bowen and Gregory K. On August 7, 2007, the Department of
sections 301(b) and 402(f) of the Lawrence, McDermott Will & Emergy Energy (DOE) received an application
Department of Energy Organization Act LLP, 600 13th Street, NW., Washington, from Sierra Power for authority to
(42 U.S.C. 7151(b), 7172(f)) and require DC 20005–3096. transmit electric energy from the United
authorization under section 202(e) of A final decision will be made on this States to Canada as a power marketer.
the FPA (16 U.S.C. 824a(e)). application after the environmental Sierra Power, a Colorado limited
On July 9, 2007, the Department of impacts have been evaluated pursuant liability corporation with its principal
Energy (DOE) received an application to the National Environmental Policy place of business in Denver, Colorado,
rwilkins on PROD1PC63 with NOTICES

from RBC Energy for authority to Act of 1969, and a determination is has requested an electricity export
transmit electric energy from the United made by DOE that the proposed action authorization with a 5-year term. Sierra
States to Canada as a power marketer. will not adversely impact on the Power does not own or control any
RBC Energy, an Ontario limited reliability of the U.S. electric power electric generation, transmission, or
partnership with its executive offices supply system. distribution assets, nor does it have a

VerDate Aug<31>2005 17:27 Aug 15, 2007 Jkt 211001 PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 E:\FR\FM\16AUN1.SGM 16AUN1
Federal Register / Vol. 72, No. 158 / Thursday, August 16, 2007 / Notices 46051

franchised service area. The electric provided above and at http:// Commission, 888 First Street, NE.,
energy which Sierra Power proposes to www.oe.energy.gov/304.htm. Washington, DC 20426, in accordance
export to Canada would be surplus Issued in Washington, DC, on August 10, with Rules 211 and 214 of the
energy purchased from electric utilities, 2007. Commission’s Rules of Practice and
Federal power marketing agencies, and Anthony J. Como, Procedure. 18 CFR 385.211, 385.214
other entities within the United States. Director, Permitting and Siting, Office of (2004).
Sierra Power will arrange for the Electricity Delivery and Energy Reliability. Notice is hereby given that the
delivery of exports to Canada over the [FR Doc. E7–16130 Filed 8–15–07; 8:45 am]
deadline for filing protests is September
international transmission facilities 10, 2007.
BILLING CODE 6450–01–P
owned by Basin Electric Power Absent a request to be heard in
Cooperative, Bonneville Power opposition to such blanket approvals by
Administration, Eastern Maine Electric DEPARTMENT OF ENERGY the deadline above, the BE Subsidiaries
Cooperative, International Transmission are authorized to issue securities and
Co., Joint Owners of the Highgate Federal Energy Regulatory assume obligations or liabilities as a
Project, Long Sault, Inc., Maine Electric Commission guarantor, indorser, surety, or otherwise
Power Company, Maine Public Service in respect of any security of another
Company, Minnesota Power, Inc., Notice of Issuance of Order person; provided that such issuance or
Minnkota Power Cooperative, Inc., New assumption is for some lawful object
August 9, 2007.
York Power Authority, Niagara Mohawk within the corporate purposes of the BE
Power Corp., Northern States Power BE Allegheny, LLC (Docket No. ER07– Subsidiaries, compatible with the public
Company, Vermont Electric Power 1112–000); BE CA LLC (Docket No. interest, and is reasonably necessary or
Company, and Vermont Electric ER07–1113–000); BE Cleco LLC (Docket appropriate for such purposes.
Transmission Co. No. ER07–1114–000); BE Colquitt LLC The Commission reserves the right to
The construction, operation, (Docket No. ER07–1115–000); BE require a further showing that neither
maintenance, and connection of each of Ironwood LLC (Docket No. ER07–1116– public nor private interests will be
the international transmission facilities 000); BE KJ LLC (Docket No. ER07– adversely affected by continued
to be utilized by Sierra Power has 1117–000); BE Rayle LLC (Docket No. approvals of the BE subsidiaries
previously been authorized by a ER07–1118–000); BE Red Oak LLC issuance of securities or assumptions of
Presidential permit issued pursuant to (Docket No. ER07–1119–000); BE Satilla liability.
Executive Order 10485, as amended. LLC (Docket No. ER07–1120–000); BE Copies of the full text of the Director’s
Procedural Matters: Any person Tenaska LLC (Docket No. ER07–1121– Order are available from the
desiring to become a party to these 000); and BE Walton LLC (Docket No. Commission’s Public Reference Room,
proceedings or to be heard by filing ER07–1122–000) 888 First Street, NE., Washington, DC
comments or protests to this application BE Allegheny LLC, BE CA LLC, BE 20426. The Order may also be viewed
should file a petition to intervene, Cleco LLC, BE Colquitt LLC, BE on the Commission’s Web site at
comment, or protest at the address Ironwood LLC, BE KJ LLC, BE Rayle http://www.ferc.gov, using the eLibrary
provided above in accordance with LLC, BE Red Oak LLC, BE Satilla LLC, link. Enter the docket number excluding
385.211 or 385.214 of the Federal BE Tenaska LLC and BE Walton LLC the last three digits in the docket
Energy Regulatory Commission’s Rules (collectively, the BE Subsidiaries) filed number filed to access the document.
of Practice and Procedures (18 CFR applications for market-based rate Comments, protests, and interventions
385.211, 385.214). Fifteen copies of each authority, with accompanying rate may be filed electronically via the
petition and protest should be filed with schedules. The proposed market-based Internet in lieu of paper. See, 18 CFR
DOE on or before the date listed above. rate schedules provide for the sale of 385.2001(a)(1)(iii) and the instructions
Comments on the Sierra Power energy, capacity and ancillary services on the Commission’s Web site under the
application to export electric energy to at market-based rates. The BE ‘‘e-Filing’’ link. The Commission
Canada should be clearly marked with Subsidiaries also requested waivers of strongly encourages electronic filings.
Docket No. EA–329. Additional copies various Commission regulations. In Kimberly D. Bose,
are to be filed directly with Doug White, particular, the BE Subsidiaries Secretary.
Brad Nesiba, Sierra Power Asset requested that the Commission grant [FR Doc. E7–16034 Filed 8–15–07; 8:45 am]
Marketing, 3773 Cherry Creek North blanket approval under 18 CFR Part 34 BILLING CODE 6717–01–P
Drive, Suite 655, Denver, CO 80209 and of all future issuances of securities and
Steven A. Weiler, Justin P. Moeller, assumptions of liability by BE
Leonard, Street and Deinard, PA, The Subsidiaries. DEPARTMENT OF ENERGY
Army and Navy Club Building, 1627 On August 9, 2007, pursuant to
Eye Street, NW., Suite 610, Washington, delegated authority, the Director, Federal Energy Regulatory
DC 20006. Division of Tariffs and Rates-Central, Commission
A final decision will be made on this granted the request for blanket approval
[Docket No. EL07–31–001]
application after the environmental under Part 34 (Director’s Order). The
impacts have been evaluated pursuant Director’s Order also stated that the DTE Pontiac North LLC; Notice of
to the National Environmental Policy Commission would publish a separate Filing
Act of 1969, and a determination is notice in the Federal Register
made by DOE that the proposed action establishing a period of time for the August 9, 2007.
will not adversely impact on the filing of protests. Accordingly, any Take notice that on June 19, 2007,
rwilkins on PROD1PC63 with NOTICES

reliability of the U.S. electric power person desiring to be heard concerning pursuant to section 1266 of the Public
supply system. the blanket approvals of issuances of Utility Holding Company Act of 2005
Copies of this application will be securities or assumptions of liability by (2005), 366.1 of the Federal Energy
made available, upon request, for public the BE Subsidiaries, should file a protest Regulatory Commission’s regulations,
inspection and copying at the address with the Federal Energy Regulatory 18 CFR 366.1 (2006) and Order No. 667,

VerDate Aug<31>2005 17:27 Aug 15, 2007 Jkt 211001 PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 E:\FR\FM\16AUN1.SGM 16AUN1

Das könnte Ihnen auch gefallen