Sie sind auf Seite 1von 9

Erection contractor Evaluation & Assessment

Date of Issue

tt-01-2012

TRUCK / TRAILOR
OIL FILTER MACHINE
FERRULE PRINTING MACHINE
WELDING TRANSFORMERS
WELDING RECTIFIERS
GAS CUTTING SETS
ANGLE CUTTING MACHINE
MAGNETIC DRILL MACHINE
HAMMERING DRILL MACHINE
HS DRILL MACHINE

BLOWER / VACUUM CLEANER


HYDRAULIC CRIPPLING TOOL
ELECTRICIAN TOOLS
FITTER & WELDER TOOLS
KNOCK OUT PUNCH I HOIE SRW
LIFTING TOOLS & TACKLES
ALL OTHER REQUIRED TOOLS

oPERATIoNAL CAPABlLlrlES : Organization Structure submitted


additionat Manpower
generally hired as per project requirements.

1'
2'

HEAD oFFlcE SET UP (Building, Number of employees at Ho, tnfrastructure


etc.)

site office establishment ( Type of site office, indoor & outdoor stores,
staff & employee
accommodation, conveyance, health & hygiene)

[ffiXn:3ffii3iJIl?:,(YearlY

1-

turnover or the companv ror erection & suppties separatery,


Number or jobs

Erection (rn Mir BDT): Fy2009: 3.5,


Y2012: 1.0, Fy2013: 16.5

srpply(in

Fy 2010:4.2,F y2011:7.1,

Mil. USD), FY2010'0.63, FY2011,0.45, Fy2012,0.51,


Fy2013:0.25

\rfi
.l(p
I/I<

^-"
sbl

Page 6

of9

ABB
Prepared by

AKK

Erection contractor Evaluation & Assessment


Checked bv

Approved by

SPD

RS

Date of Issue

Revision

lt-0t-2012

Revised: 2210112014

ERECTION CONTRACTOR
EVALUATION
&
ESSMENT

ffim
Y/&
Page

I of9

rlHry-

:i-1{::iq=eeP.

l-

rc<E{

ABB
Prenared bv

AKK

Erection contractor Bvaluation & Assessment


Checked bv

Approved bv

SPD

RS

Date of Issue

Revision

ll-01-2012

Page 9

of9

ABB

Erection contractor Evaluation & Assessment

Prepared by

Checked bv

Anproved bv

SPD

RS

AKK

Date of Issue

Revision

ll-01-20t2

DECLARATION
l, ...Md.

Nurul lslam

the undersigned, declare

that the above information is correct & complete to the best of my knowledge and belief.

o^r"4-?/or

f ft,

Signature of authorised
(With company seal)

,,r""

Tleb,

AKA) gl

1,.f,

Name:Md, Nurulslam

Designation: CEO

sEcrloN c - EVALUATION & REGOMMENDATION (For ABB use onty):


INSTALLATION MANAGEMENT TEAM'S COMMENT & REMARKS

RECOMMENDATION: tr

RECOMMENDED

tr

NOT RECOMMENDED

DATE OF EVALUATION:

SIGNATURE OF INSTALLATION MANAGER

NAME OF INSTALLATION MANAGER

REVIEWER'S (INSTALLATION & SITE MANAGEMENT HEAD) COMMENTS:

CONCLUSION:

tr APPROVED

tr

NOT APPROVED

VALUE OF THE JOB


Below 5 MINR

Page 8

of9

TYPE OF PROJECTS EXECUTED IN PAST:

n orulv LABoUR supply (wrrHour coNSUMABLES)

corurnncr wrrH

encr ro BAcK (REcErvrNG, uNLoADrNc, sroRAGE, EREcroN,

coNSUMABLES

coMMrssroNrNG ASSTSTANCE AND HANDTNG OVER COMPLETE)

coNrnncr

TNcLUDTNG

suppy & EREcroN.

LIST OF COMPLETION CERTIFICATES AND CUSTOMER APPRECIATION LETTERS (Documents to be


attached, if any) :

1.

STEMENS BANGLADESH LTMTTED (COPY ENCLOSED)

DOES CONTRACTOR HAVE ANY SAFETY, ENVIORNMENT, QUALITY POLICY FOR THE ORGNISATION
(Documents to be attached, if any) :

1.

Not yet (under implementation)

ls CoNTRACTOR CERTTFIED

BY ANY REPUTED CERTTF|CATION BODY (QUALITY / SAFETY &


ENVIORNMENT) (Documents to be attached, if any) : NOT YET.

DOES CONTRACTOR POSSESS'A'CLASS ELECTRICAL CONTRACTOR'S LICENCE FOR ANY STATE, IF


so, ATTAQH DETATL / COpy OF THE VALTD LTCENCE:

Applied for "A" Class Electrical Contractor Licence, which wil! be available within
February, 2014.

Page 4

of9

ABB

Erection contractor Evaluation & Assessment

Prenared bv

Checked bv

Annroved bv

SPD

RS

AKK

SECTION A

Date of Issue

Revision

rt-01-2012

BASIC DETAIIS (To be filled by erection contractor)

NAME OF THE COMPANY

ADDRESS FOR COMMUNICATION

SCIENTECH ENGINEERING AND


SERVICES.

HOUSE # 67, ROAD # 15, BLOCK # D,


DHAKA.I 2{ 3, BANGLADESH

CONTACT PERSON WITH


DESIGNATION:

MOBILE & TELEPHONE NUMBERS

MD. NURUL ISLAM, CEO.

+880 18415 20023


+880 28815164

E-MAIL ID & FAx

NUMBER:
Nurul. islam5T@yahoo.com
+88 02 881 5164

TypE oF coMpANy I tNDUSTRY / FtRM (T|CK AS AppROpRtATE)

PUBLtc I pRtvATE ! GovERNMENT !

rZCor'rrnACToRS

SECTION B

eARTNERSHIe Ednopnrerny

!oTHERS(SPEoIFY)

EVALUATION REQUIREMENTS (To be filled by erection contractor)

TYPE OF ERECTION & INSTALLATION / ENGG SERVTCES WHTCH CONTRACTOR CAN pROVtDE (T|CK AS

APPROPRTATE)

lEfN

o u SrR tAL E LEcTRt Ft CAT| O N

rz'-rnnrusMrssroN

LINE

I rNsrnuHaENTATtoN
lEGxorruEERtNG

sERVtcES

IE

fwrrcHyARD

E nunnl

ELECTRTFToATToN

rpc coNTRACTS

)E-erre / sroRE /ADMN sERVtcES

senuces FoR supERvrsroN oF ERECTToN & coMMrssroNrNG woRKS

CIrya",;\
Dh4K4\?

;"-.(9

Page2 of9

Erection contractor Evaluation & Assessment


I

It-01-20t2
STATUS oF LEGAL coMpLtANCE (Documents to be attached, if any)

1.
2.
3.
4.
5.

TtN

6.

Bank Certificate: Enctosed.

pF REGtsTRATtoN : Trade
ESI REGISTRAION',VAT

Licence No. 0S - 15437.

Registration No. 5071040106, Area code: 50202.

SERVICE TAX REGISTRAION : TIN CErtifiCAtE


PAN

ENCIOSEd.

CARD:N/A

No

: Enclosed

CONTRACTOR ORGANISATION

NEED TO PROVIDE DETAILS OF LIST OF EMPLOYEES WORKING IN THE


ORGANISATION INCLUDING
ENGINEERS, SUPERVISORS, STOREKEEPERS, SAFETY OFF|CERS, reCHrrrrcrnrus,
elecrnrcArus,'
WELDEER, FlrrERS, RTGGERS ETC (Documents to be attached) :

Organogram
1.

2.
3.

4.
5.
6,
7.
8.
9.

10.

11.
12.

13.
14.

Engr. Md. Nurul lslam, (EEE)


Engr. Abdul Baten (EEE)
Engr. Md. Nur Jamat Biswas, (ME)
Engr. Md. Showkotul lslam (EEE)
Engr. Saydur Rahman (EEE)
Md. Gulzar Hossain (ACAD Design)
Ripon Roy (Dip. Mec.)
lmam Hossain Babu, (Dip. Elect.)
Jahangir Alam Sr. Foreman
Akram Hossain, Sr. Mech. Fitter
Siddiqur Rahman, Mech. Fitter
Md. Sharfuddin, Sr. Commercial
M. A. Quadir, Administration & Store
Md. Omar Ali, Office Assistance

SPECIFY THE JOB / JOBS, WHERE CUSTOMER IMPOSED PENALTY


TO THE CONTRACTOR FOR THE
REASONS ATTRIBUTABLE oN ACcoUNT oF THE AGENCY:

N/A

LIST OF OWNED

ANDrAcKlesll@

Page 5

of9

EXPERIENCE AS ERECTION CONTRACTOR IN THIS FIELD

LIST OF PROJECTS EXECUTED IN PAST FOR ABB

SL
NO

NAME OF THE
PROJECT /
LOCATION

NAME OF

DtvtstoN

NAME OF
BU

VALUE OF
THE JOB

PERIOD OF
EXECUTION

MANPOWER
DEPLOYED
DUR!NG

PEAK

N/A

2
3

LIST OF PROJECTS EXECUTED IN PAST FOR OTHER CUSTOMERS (OTHER THAN ABB

VALUE OF
THE JOB

NAME OF THE
PROJECT / LOCATION

lnstallation of LV
Power & control cable
and cable trays for
100MW Power

Shahjibazar Power
Co. Ltd., Sylhet
BDT 4,200,000

usD
HV/MV Cable supply &
lnstallation

50MW Norther Power


Co. Ltd ( A project of

BDT 937,000
usD 397,964

Sylhet Plastic

BDT 2, 800,000
usD s5,000

2011t12

BDT 3,400,000

2012t13

lndustries Ltd
13Z33kV Substation
33/1 1kV 35MVA

630,000

Sitalpur Steel Mills


Ltd, Chittagong

BDT 3,034,000

Substation at
CEPZ&DEPZ

Page 3

of9

SAFETY TRACK RECORD (LIST OF PROJECTS WITH ANY LOST TIME INJURY RECORD FOR PAST THREE
YEARS To BE MENTIONED AND RECORDS TO BE ATTACHED ): N/A

PROPOSED EXISTING SITES BY ERECTION CONTRACTOR WHICH ARE OFFERED TO ABB FOR
INSPECTION:

NAME OF THE SITE /


LOCATION

Modern Steel Mills,


Chittagong

Regent Power
(A Project of Siemens
Bangladesh Limited)
Ghorashal, Narshingdi

Installation of
132t11 kV
3OMVA GlS
Substation
lnstallation of
230 t11 KV
,I5O
MVA
Substation

Mr. Mohammad
Ali, Chief
Engineer.

Engr. Md.
Asaduzzaman
Siemens
Bangladesh Ltd.

or
Mr. lsmail, GM.
Regent Power,
Ghorashal.

REFERENCES (Feedback about the contractor from the customer):


PERSONS REFFERED (Organisation, Name , Designation & Contact number)
1. Mr. Asaduzzaman, Div. Head, Energy, Siemens Bangladesh Limited: Mob: +880 1711520026
2. Mr. Mohammad Ali, Chief Engineer, Modern Steel Mills Limited, mob: +880 1199215497

LATEST CREDENTIALS (On going projects)

NAME OF THE
PROJECT / LOCATION

NAME OF
CUSTOMER

230 kV Substation
including 230kV
Transmission line for
108MW Power plant

Regent Energy &


Power
( A project of
Siemens
Bangladesh

BDT.

230 kV U/G Cable


including outdoor
terminations for
108MW Power plant

Regent Energy &


Power
( A project of
Siemens
Bangladesh

BDT. 2,995,000
us$. 194,500

17,803,429
us$. 59,000

2013t14

2013t14

,'
'Koru

Page 7

of9

Das könnte Ihnen auch gefallen