Sie sind auf Seite 1von 4

Mugesh Babu.

Mobile: +919677627127
Skype: Mugeshk
Email: mighty.mugesh@gmail.com

OBJECTIVE
To settle myself in a globally competitive environment on challenging tasks that shall yield
the twin benefits of the job satisfaction and a steady-paced professional growth.
PROFESSIONAL SYNOPSIS

A dynamic professional with 7 years of experience in the field of Non-Destructive


Inspection. Being an effective communicator with the ability to work with Team, Coordinate and Contribute to the team goals.
Working knowledge with various standards like ASME SecV & VIII Div.1, AWS D1.1,
ASME B 31.1 & 31.3, EN 1712, EN 10160, etc.

JOB DESCRIPTION

UT co-ordination and cross-checking.


Requesting Permit to work and conducting pre-safety meet with the crew members.
UT Flaw Detection check on pressure vessels & raw materials.
UT Lamination check on raw materials of pressure vessel and process piping.
Corrosion survey of vessels and pipe lines.
UT thickness survey on raw materials and equipment.
Finding surface defects in weld joints and parent metal areas with PT and MPT.
Report preparation for UT, PT and MPT.
Eddy current testing on plates and material sorting.
Tube inspection using Eddy current.
Interpretation of drawings and other documents.

EMPLOYMENT DETAILS

Dec14 to till date with "M/s. STORK COPPERHEAT MIDDLE EAST" QATAR.

Jan'14 to July14 with "M/s. DRY DOCKS WORLD" DUBAI.

Mar13 to Jan14 M/s. SIEVERT INTERNATIONAL INSPECTION- QATAR.

May11 to Jan13 M/s. ACOUSTICS INDIA PRIVATE LIMITED - INDIA.

June07 to March11 M/s. NATIONAL INSPECTION SERVICES INDIA.

PROFESSIONAL CERTIFICATION

Rope Access (IRATA) Level 1.

PCN- LEVEL II Personnel in Nondestructive Testing Ultrasonic Testing


Composite grade for 3.1 92.56%
Composite grade for 3.2 92.53%

Composite grade for 3.9 93.94%.


PCN- LEVEL II Personnel in Nondestructive Testing Magnetic Particle Testing
Composite grade 93.43%

ASNT - LEVEL II Personnel in Nondestructive Testing for the following methods


Eddy Current testing
Ultrasonic testing
Liquid penetrant testing
Magnetic particle testing
Radiography testing

PROJECTS WORKED
At Stork Copperheat Middle East
Working in ORYX GTL Shutdown 2014 as Site Supervisor.
At Drydocks World - Dubai Ship yard.

Premier Oil Solan Subsea Oil Storage Tank (SOST) The critical component of
Solan Oil Field. This tank is the first of its kind, with dimensions 45 x 45m & 25.5m tall
which is supported by piled steel jackets.
Aibel, Tennet, ABB Dolwin Beta - The worlds largest HVDC Offshore Wind
Platform. The dimension of the platform is 100.1 x 74.1m & 83 m tall with accommodation
and weighs 20,000 metric tonnes approximately.

At Sievert International Inspection Co. Wll.

Ras Laffan Power Company (RLPC) - Tank inspection.


Qatar Petroleum Refinery Shutdown 2013 as Team Lead with Weld Scanning
Approval.
ORYX GTL Shutdown 2013 as Site Supervisor.
Worked in various sites like QAFCO, Descon etc.

At Acoustics India Private Limited


For BOC India Limited
Liquid Oxygen Storage Tank of Capacity 25KL,40KL & 75KL for BOC India
Cryogenic Vessels of Capacity 2KL, 10KL, 50KL & 60KL Storage Tanks for Liquid
Nitrogen
Fabrication of Argon Column I & II - 27m Height OD 530mm, Column Packed with
Structured Packing for Purification of Argon
Fabrication of Double Column - 35m Height with Maximum OD 1400mm, Column
packed with Structured Packing, Collector & Distributor, Aluminium Trays, Heat
Exchangers for Separation of Oxygen, Nitrogen & Argon
Nitrogen Separator, PPU Dryer Vessels, Moisture Separator with internals & Post Filter
U Stamps Vessels, Storage Tank & Ducts

1760 KW, 350 KW, 325 KW Electric Reactivation Heater for M/s Sandvik

EHA Column Reboiler Electric Heater for M/s Air Liquide


Shell & Tube Type Heat Exchangers 350 KW & 14 KW Fuel Gas Heater for M/s Petrofac.
100KL LDO Storage Tank for M/s Cethar Limited
1000L Water Wash System for M/s Atlas Copco
Reactor Vessel & Hot Gas Chamber
Star Column & Box Column for M/s BHEL
Hot Gas & Waste Gas Main Duct for M/s Posco

At National Inspection Services


For Altec Fabricators
Performed UT on Weldments for all Windmill tubular towers .
For Tool Fab Industries
Performed Ultrasonic Test on Weldments for Crawler Links and Tower Shell and Flange
Butt Joints.
For Master Fabricators
Performed ultrasonic test on weldments of windmill towers and flange joints.
For Metal Fabricators
UT on weldments of wind mill tower, PT on bow nuts etc.
For Vasudha Enng Works
UT on weldments of flanges, doors of windmill tower, etc
For Price tec Manufacturing Pvt,Ltd.
Lamination check in raw materials of machinery parts like bearing carriage shaft etc.
Also worked in various sites like Baby Engg. Pvt. Ltd., Barakath Engg. Industries etc.

ACADEMIC PROFILE

B.E. (Mechanical) from J. J. College Of Engineering and Technology, Tamilnadu with 80%.
H.S.E. from Sacred Heart Higher Secondary School, Tamilnadu with 83.5%.
SSLC from Sacred Heart Higher Secondary School, Tamilnadu with 92.6%.

PERSONAL PROFILE
Father Name
Gender
Date of Birth
Martial Status
Language Known
Passport Number
Validity

:
:
:
:
:
:
:

Mr. V. Krishna Moorthy


Male
24.10.1989
Married
Tamil, English & Hindi
J 4332780
01/02/2022

DECLARATION
I hereby declare that the informations furnished above is true to the best of my knowledge.

PLACE: TRICHY
DATE:

(MUGESH BABU. K)

Das könnte Ihnen auch gefallen