Sie sind auf Seite 1von 6

41360 Federal Register / Vol. 72, No.

144 / Friday, July 27, 2007 / Notices

impacts of growing pinniped Dated: July 25, 2007. the Public Electronic Reading Room
populations, possible resumption of Timothy J. Ragen, (PERR) link: http://www.nrc.gov/
whaling activities by the Makah Tribe, Executive Director. reading-rm.html at the NRC Homepage.
research related to the tuna-dolphin [FR Doc. 07–3703 Filed 7–25–07; 1:25 pm] A request for a hearing or petition for
issue in the eastern tropical Pacific BILLING CODE 6820–31–M leave to intervene may be filed within
Ocean, and conservation of certain 30 days after publication of this notice
marine mammal species, including in the Federal Register. Any request for
northern and southern sea otters and NUCLEAR REGULATORY hearing or petition for leave to intervene
southern resident killer whales. COMMISSION shall be served by the requestor or
petitioner upon the applicant, the Office
CONTACT PERSON FOR MORE INFORMATION: Request To Amend a License To of the General Counsel, U.S. Nuclear
Suzanne Montgomery, Special Assistant Import Radioactive Waste Regulatory Commission, Washington,
to the Executive Director, Marine DC 20555; the Secretary, U.S. Nuclear
Mammal Commission, 4340 East-West Pursuant to 10 CFR 110.70(c) ‘‘Public
notice of receipt of an application,’’ Regulatory Commission, Washington,
Highway, Room 905, Bethesda, MD DC 20555; and the Executive Secretary,
please take notice that the Nuclear
20814, 301–504–0087; e-mail: U.S. Department of State, Washington,
Regulatory Commission (NRC) has
smontgomery@mmc.gov. DC 20520.
received the following request to amend
an import license. Copies of the request The information concerning this
are available electronically through import license amendment application
ADAMS and can be accessed through follows.

NRC IMPORT LICENSE AMENDMENT APPLICATION


Description of material
Name of applicant, date of
application, date received, Country of
application No., docket No. Material type Total volume and activity level End use origin

Diversified Scientific Services, Class A radioactive mixed Total Volume: 378,000 kg ..... Volume Reduction. ................ Canada.
Inc. (DSSI/Perma-Fix) May waste consisting of solids, Total Activity Level: 7,500 cu- Amend to: (1) increase the
14, 2007, June 18, 2007, semi-solids, and liquids ries. total activity level to 7,500
IW012/03 11005322. contaminated with various curies; (2) extend the expi-
materials including tritium, ration date to March 31,
C–14, mixed fission product 2010; and (3) change the li-
radionuclides and other censee’s point of contact.
contaminants.

Dated this 18th day of July 2007 at associated with implementation of U.S. mail. Submit written comments to
Rockville, Maryland. WCAP–16011–P–A, ‘‘Startup Test Chief, Rules and Directives Branch,
For the Nuclear Regulatory Commission. Activity Reduction (STAR) Program.’’ Division of Administrative Services,
Stephen Dembek, The NRC staff has also prepared a model Office of Administration, Mail Stop: T–
Acting Deputy Director, Office of license amendment request and a model 6 D59, U.S. Nuclear Regulatory
International Programs. no significant hazards consideration Commission, Washington, DC 20555–
[FR Doc. E7–14566 Filed 7–26–07; 8:45 am] (NSHC) determination relating to this 0001. Hand deliver comments to: 11545
BILLING CODE 7590–01–P matter. The purpose of these models are Rockville Pike, Rockville, Maryland,
to permit the NRC to efficiently process between 7:45 a.m. and 4:15 p.m. on
amendments that propose to modify TS Federal workdays. Copies of comments
NUCLEAR REGULATORY MTC surveillance requirements for received may be examined at the NRC’s
COMMISSION implementing the STAR Program. Public Document Room, 11555
Licensees of nuclear power reactors to Rockville Pike (Room O–1F21),
Notice of Opportunity To Comment on which the models apply could then Rockville, Maryland. Comments may be
Model Safety Evaluation on Technical request amendments, confirming the submitted by electronic mail to
Specification Improvement To Revise applicability of the SE and NSHC CLIIP@nrc.gov.
MTC Surveillance for Startup Test determination to their reactors. The
FOR FURTHER INFORMATION CONTACT:
Activity Reduction (STAR) Program NRC staff is requesting comment on the
Timothy Kobetz, Mail Stop: O–12H2,
(WCAP–16011) model SE and model NSHC
Techncial Specifications Branch,
determination prior to announcing their
AGENCY: Nuclear Regulatory Division of Inspection & Regional
availability for referencing in license
Commission. Support, Office of Nuclear Reactor
amendment applications.
ACTION: Request for comment. Regulation, U.S. Nuclear Regulatory
DATES: The comment period expires
Commission, Washington, DC 20555–
SUMMARY: Notice is hereby given that August 27, 2007. Comments received 0001, telephone 301–415–1932.
the staff of the Nuclear Regulatory after this date will be considered if it is
SUPPLEMENTARY INFORMATION:
Commission (NRC) has prepared a practical to do so, but the Commission
jlentini on PROD1PC65 with NOTICES

model safety evaluation (SE) relating to is able to ensure consideration only for Background
the modification of technical comments received on or before this Regulatory Issue Summary 2000–06,
specification (TS) moderator date. ‘‘Consolidated Line Item Improvement
temperature coefficient (MTC) ADDRESSES: Comments may be Process for Adopting Standard
surveillance requirements (SR) submitted either electronically or via Technical Specification Changes for

VerDate Aug<31>2005 16:53 Jul 26, 2007 Jkt 211001 PO 00000 Frm 00076 Fmt 4703 Sfmt 4703 E:\FR\FM\27JYN1.SGM 27JYN1
Federal Register / Vol. 72, No. 144 / Friday, July 27, 2007 / Notices 41361

Power Reactors,’’ was issued on March control changes to the TS Bases in dated March 10, 2007, (Reference 3) the
20, 2000. The consolidated line item accordance with the licensees TS Bases TSTF submitted TSTF–486, Revision 2,
improvement process (CLIIP) is Control Program. The CLIIP does not for NRC review. TSTF–486 is proposing
intended to improve the efficiency of prevent licensees from requesting an to change NUREG 1432, ‘‘Standard
NRC licensing processes, by processing alternative approach or proposing the Technical Specifications Combustion
proposed changes to the standard changes without the requested TS Bases. Engineering Plants,’’ (CE STS) Revision
technical specifications (STS) in a However, deviations from the approach 3.1 (Reference 4), to generically
manner that supports subsequent recommended in this notice may require implement moderator temperature
license amendment applications. The additional review by the NRC staff and coefficient (MTC) surveillance
CLIIP includes an opportunity for the may increase the time and resources requirement changes associated with
public to comment on proposed changes needed for the review. implementation of WCAP–16011–P–A,
to the STS after a preliminary ‘‘Startup Test Activity Reduction
Public Notices
assessment by the NRC staff and finding (STAR) Program,’’ (Reference 5).
that the change will likely be offered for This notice requests comments from WCAP–16011–P–A describes methods
adoption by licensees. This notice interested members of the public within to reduce the time required for startup
solicits comment on a proposed change 30 days of the date of publication in the testing. To this end, WCAP–16011–P–A
to the STS that modifies MTC Federal Register. After evaluating the proposes methods to eliminate the
surveillance requirements for comments received as a result of this control element assembly (CEA) worth
implementing the STAR Program. The notice, the staff will either reconsider and isothermal temperature coefficient
CLIIP directs the NRC staff to evaluate the proposed change or announce the (ITC) measurements at hot zero power
any comments received for a proposed availability of the change in a (HZP). The measured ITC is used to
change to the STS and to either subsequent notice (perhaps with some calculate the HZP MTC. WCAP–16011–
reconsider the change or announce the changes to the safety evaluation or the P–A includes a method to substitute the
availability of the change for adoption proposed no significant hazards measured verification of MTC at HZP
by licensees. Licensees opting to apply consideration determination as a result with an alternate MTC verification
for this TS change are responsible for of public comments). If the staff consisting of the predicted (calculated)
reviewing the staff’s evaluation, announces the availability of the MTC and measured critical boron
referencing the applicable technical change, licensees wishing to adopt the concentration (CBC) at HZP. When this
justifications, and providing any change must submit an application in alternate MTC verification is utilized,
necessary plant-specific information. accordance with applicable rules and WCAP–16011–P–A adds the
Each amendment application made in other regulatory requirements. For each requirement for the early in cycle MTC
response to the notice of availability application the staff will publish a measurement to verify MTC is not more
will be processed and noticed in notice of consideration of issuance of negative than allowed is also used to
accordance with applicable rules and amendment to facility operating verify MTC is not more positive than
NRC procedures. licenses, a proposed no significant allowed. WCAP–16011–P–A adds an
This notice involves the modification hazards consideration determination, ITC measurement at intermediate to hot
of TS MTC surveillance requirements and a notice of opportunity for a full power (HFP) and applicability
for implementing the STAR Program. hearing. The staff will also publish a requirements for core design,
This change was proposed for notice of issuance of an amendment to fabrication, refueling, startup testing,
incorporation into the standard operating license to announce the and CEA lifetime viability requirements.
technical specifications by the Owners modification of MTC surveillance WCAP–16011–P–A methods can only be
Groups participants in the Technical requirements for implementing the applied to cores that are well
Specification Task Force (TSTF) and is STAR program for each plant that characterized by an existing database.
designated TSTF–486. TSTF–486 can be receives the requested change. WCAP–16011–P–A is only applicable to
viewed on the NRC’s Web page at http:// the particular plants that participated in
www.nrc.gov/reactors/operating/ Proposed Safety Evaluation its development, as indicated in the
licensing/techspecs.html. U.S. Nuclear Regulatory Commission, document.
Office of Nuclear Reactor Regulation, TSTF–486 will provide standardized
Applicability Consolidated Line Item Improvement, wording in the CE STS for plants
To efficiently process the incoming Technical Specification Task Force implementing the WCAP–16011–P–A
license amendment applications, the (TSTF) Change TSTF–486, Modification alternate MTC verification at startup.
staff requests that each licensee of Technical Specification Moderator
applying for the changes proposed in 2.0 Regulatory Evaluation
Temperature Coefficient Surveillance
TSTF–486 include TS Bases for the Requirements associated with In 10 CFR 50.36, the Commission
proposed TS consistent with the TS implementation of the Startup Test established its regulatory requirements
Bases proposed in TSTF–486. The staff Activity Reduction (STAR) Program. related to the content of TS. Pursuant to
is requesting that the TS Bases be 10 CFR 50.36, TS are required to
included with the proposed license 1.0 Introduction include items in the following five
amendments in this case because the By letter dated June 3, 2005, specific categories related to station
changes to the TS and the changes to the (Reference 1) the Technical operation: (1) Safety limits, limiting
associated TS Bases form an integral Specifications Task Force (TSTF), a safety system settings, and limiting
change to a plant’s licensing basis. To joint owners group activity, submitted control settings; (2) limiting conditions
ensure that the overall change, TSTF–486, ‘‘Revise MTC Surveillance for operation (LCOs); (3) surveillance
including the TS Bases, includes for Startup Test Activity Reduction requirements (SRs); (4) design features;
jlentini on PROD1PC65 with NOTICES

appropriate regulatory controls, the staff (STAR) Program (WCAP–16011),’’ and (5) administrative controls. The
plans to condition the issuance of each Revision 0, for NRC review. By letter regulations do not specify the particular
license amendment on the licensee’s dated February 20, 2007, (Reference 2) requirements to be included in a plant’s
incorporation of the changes into the TS the TSTF submitted TSTF–486, TS and do not explicitly prescribe
Bases document and that the licensee Revision 1, for NRC review. By letter specific post-refueling startup testing.

VerDate Aug<31>2005 16:53 Jul 26, 2007 Jkt 211001 PO 00000 Frm 00077 Fmt 4703 Sfmt 4703 E:\FR\FM\27JYN1.SGM 27JYN1
41362 Federal Register / Vol. 72, No. 144 / Friday, July 27, 2007 / Notices

However, the genesis for post-refueling specified in the Core Operating Limits becomes the fourth paragraph and is
startup testing can be traced to the Report (COLR). modified to state the end of cycle MTC
preoperational testing required to be • The proposed change revises MTC limit is specified in the COLR. (Analog)
specified in the Final Safety Analysis (Digital) SR 3.1.3.1, Frequency, to add a (Digital)
Report by 10 CFR 50.34. Additionally, requirement to verify MTC is within the • The References section is modified
10 CFR 50.36 specifies SRs relating to upper limit within seven (7) EFPD of to add, in brackets, WCAP–16011–P–A.
test, calibration, or inspection to assure reaching 40 EFPD of core burnup. This (Analog) (Digital)
that the necessary quality of systems verification would only be required if 3.0 Technical Evaluation
and components is maintained, that the MTC determined prior to entering
facility operation will be within safety Mode 1 is determined using an adjusted As stated previously WCAP–16011–
limits, and that the limiting conditions predicted MTC. P–A describes methods to reduce the
for operation will be met. Additionally, • The proposed change revises MTC time required for startup testing. The
10 CFR Part 50, Appendix A, ‘‘General (Digital) SR 3.1.3.2, Surveillance, and NRC approved WCAP–16011–P–A on
Design Criteria’’ (GDC) apply, in that the accompanying Note to indicate the MTC January 14, 2005, for referencing in
GDC establish the necessary design, lower limit is specified in the COLR. license applications to the extent
fabrication, construction, testing, and • The proposed change revises MTC specified and under the limitations
performance requirements for (Analog) SR 3.1.3.2, Frequency, to stated in the topical report and NRC
structures, systems, and components replace the phrase ‘effective full power evaluation.
days’ with the acronym ‘EFPD.’ TSTF– CE STS SR 3.1.3.1 (Analog) and SR
important to safety. Additionally, 10
486 includes changes to the CE STS 3.1.3.1 (Digital) are being revised to add
CFR Part 50, Appendix B, ‘‘Quality
Bases B 3.1.3 contained in NUREG– a frequency that is required by WCAP–
Assurance Criteria for Nuclear Power
1432. 16011–P–A when the alternate MTC
Plants and Fuel Reprocessing Plants’’
• Deletes the last sentence of the verification method is used to verify
apply, in that Criterion III ‘‘Design
second paragraph of the Background MTC is within the upper limit during
Control’’ requires that ‘‘* * * measures startup testing. That frequency
shall provide for verifying or checking section. (Analog) (Digital)
the adequacy of design, such as by the • Modifies the first sentence of the coincides with the SR 3.1.3.2
first paragraph in the LCO section to verification that MTC is within the
performance of design reviews, by the lower limit at 40 EFPD. This frequency
use of alternate or simplified state that the COLR contains both
positive and negative MTC limits. is consistent with WCAP–16011–P–A
calculational methods, or by the and therefore acceptable.
performance of a suitable testing Modifies the third sentence of the first
paragraph in the LCO section to state CE STS SR 3.1.3.1 (Analog), and SR
program.’’ Specifically, MTC is a 3.1.3.1 (Digital) are also being revised to
parameter controlled in the licensee’s the purpose of the positive MTC limit in
the COLR. (Analog) (Digital) state the upper MTC limit is in the
TS, including surveillance COLR. Currently, the location of the
• Inserts a new paragraph in the LCO
requirements. As a value in the TS, upper limit is not specified in either
section, between the existing first and
MTC and the applicable SRs are subject Analog or Digital CE STS SR. CE STS
second paragraphs, into the LCO section
to regulatory oversight. 3.1.3 (Analog) LCO states, ‘‘The MTC
to explain the positive MTC limits
2.1 Proposed Change contained in CE STS LCO 3.1.3. shall be maintained within the limits
(Analog) (Digital) specified in the COLR. The maximum
TSTF–486 would make the following
• Modifies the current second positive limit shall be that specified in
changes to the CE STS contained in Figure 3.1.3–1.’’ Figure 3.1.3–1 is
paragraph in the LCO section to include
NUREG–1432. contained in the CE STS. CE STS 3.1.3
a discussion of how MTC may be
• The proposed change revises the controlled using CEA position and (Digital) LCO states, ‘‘The MTC shall be
MTC (Analog) Surveillance boron concentration. (Analog) (Digital) maintained within the limits specified
Requirement (SR) 3.1.3.1, Surveillance, • Modifies the Surveillance in the COLR, and a maximum positive
to indicate the MTC upper limit is Requirements section by adding a limit as specified below:’’ Two
specified in the Core Operating Limits Reviewer Note describing the use of the equations then follow for determining
Report (COLR). Alternate MTC verification method the maximum positive limit. The use of
• The proposed change revises the contained in WCAP–16011–P–A. the plural in the LCO statements
MTC (Analog) SR 3.1.3.1, Frequency, to (Analog) (Digital) indicate the STS expect there to be
add a requirement to verify MTC is • Modifies the first paragraph of the upper and lower limits in the COLR, of
within the upper limit within seven (7) Surveillance Requirements section which the upper limit would be
effective full power days (EFPD) of breaking it into three paragraphs. The bounded by the value in the TS.
reaching 40 EFPD of core burnup. This new first paragraph consists of the first Therefore, specifying in the SR that the
verification would only be required if and second sentences and precedes the upper limit be within the COLR limit is
the MTC determined prior to entering Reviewer’s Note; the text is otherwise consistent with the CE STS. The specific
Mode 1 is determined using an adjusted, unchanged. The new second paragraph wording is also consistent with current
predicted MTC. is the third sentence of the current first phrasing in the CE STS. Therefore, this
• The proposed change revises MTC paragraph; the text is otherwise change is acceptable.
(Analog) surveillance requirement (SR) unchanged. The new third paragraph is CE STS SR 3.1.3.2 (Digital) is also
3.1.3.2, Note, to indicate the MTC lower the remainder of the current first being revised to state the lower MTC
limit is specified in the COLR. paragraph, it is modified to state the limit is in the COLR. Currently, the
• The proposed change revises MTC MTC verification must occur within location of the lower limit is specified
(Analog) SR 3.1.3.2, Frequency, to seven (7) effective full power days of in the Note. This change makes the CE
jlentini on PROD1PC65 with NOTICES

replace the phrase ‘effective full power reaching 40 effective full power days STS SR 3.1.3.2 (Digital) consistent with
days’ with the acronym ‘EFPD.’ and that the MTC limits are in the the analog equivalent. The specific
• The proposed change revises MTC COLR. (Analog) (Digital) wording is also consistent with current
(Digital) SR 3.1.3.1, Surveillance, to • The existing second paragraph of phrasing in the CE STS. Therefore, this
indicate the MTC upper limit is the Surveillance Requirements section change is acceptable.

VerDate Aug<31>2005 16:53 Jul 26, 2007 Jkt 211001 PO 00000 Frm 00078 Fmt 4703 Sfmt 4703 E:\FR\FM\27JYN1.SGM 27JYN1
Federal Register / Vol. 72, No. 144 / Friday, July 27, 2007 / Notices 41363

The first sentence of the Note in CE being modified by breaking it into three Program: The amendment also changes
STS SR 3.1.3.2 (Analog) and SR 3.1.3.2 paragraphs. record keeping, reporting, or
(Digital) is being revised from, ‘‘If the • The new first paragraph consists of administrative procedures or
MTC is more negative than the COLR the first and second sentences and requirements.] The NRC staff has
limit * * *’’ to ‘‘If the MTC is more precedes the Reviewer Note, the text is determined that the amendments
negative than the limit specified in the otherwise unchanged. This is an involve no significant increase in the
COLR * * *’’ SR 3.1.3.2 (Digital) is editorial change and acceptable. amounts and no significant change in
being revised from ‘‘Verify MTC is • The new second paragraph is the the types of any effluents that may be
within the lower limit.’’ to ‘‘Verify MTC third sentence of the current first released offsite, and that there is no
is within the lower limit specified in the paragraph, the text is otherwise significant increase in individual or
COLR.’’ In all instances the MTC lower unchanged. Making the sentence a cumulative occupational radiation
limit is specified in the COLR. The separate paragraph is an editorial exposure. The Commission has
revised wording is consistent with other change and acceptable. previously issued a proposed finding
CE STS references to the COLR. • The new third paragraph is the that the amendments involve no
Therefore, this change is acceptable. remainder of the current first paragraph; significant hazards considerations, and
The revision to the CE STS Bases for it is modified to state the MTC there has been no public comment on
B 3.1.3 (Analog) and B 3.1.3 (Digital) verification must occur withing seven the finding [FR]. Accordingly, the
Background section is removing an (7) effective full power days of reaching amendments meet the eligibility criteria
incorrect statement in the CE STS that 40 effective full power days and that the for categorical exclusion set forth in 10
was identified during the staff’s review MTC limits are in the COLR. These CFR 51.22(c)(9) [and (c)(10)]. Pursuant
associated with Reference 1. The TSTF changes are editorial and acceptable. to 10 CFR 51.22(b), no environmental
has agreed to remove the sentence as Moving the existing second paragraph impact statement or environmental
part of TSTF–486 Revision 2. Therefore, of the Surveillance Requirements assessment need be prepared in
this change is acceptable. section to become the fourth paragraph connection with the issuance of the
The modification of the first and modifying it to state the end of amendments.
paragraph in the CE STS Bases for B cycle MTC limit is specified in the
COLR are editorial changes. These 6.0 Conclusion
3.1.3 (Analog) and B 3.1.3 (Digital) LCO
section is intended to identify the changes are acceptable. The Commission has concluded, on
location of the upper and lower MTC Adding WCAP–16011–P–A, in the basis of the considerations discussed
limits. This change is consistent with brackets, to the References section is above, that (1) There is reasonable
the proposed changes to CE STS appropriate. The brackets indicate assurance that the health and safety of
described above and therefore WCAP–16011–P–A is an optional the public will not be endangered by
acceptable. reference. It would only be included on operation in the proposed manner, (2)
The addition of a new second plants that have implemented the such activities will be conducted in
paragraph in the CE STS Bases for B Alternate MTC surveillance. This compliance with the Commission’s
3.1.3 (Analog) and B 3.1.3 (Digital) LCO change is acceptable. regulations, and (3) the issuance of the
section is intended to describe the 3.1 Summary amendments will not be inimical to the
purpose of the limits and reinforce that common defense and security or to the
TSTF–486 would provide health and safety of the public.
the upper MTC limit in the COLR must standardized wording in the CE STS for
be bounded by that in the TS. This plants implementing the WCAP–16011– 7.0 References
change is consistent with the proposed P–A alternate MTC verification at 1. Letter from the Technical Specifications
changes to CE STS described above and startup. The changes to NUREG–1432 Task Force (TSTF), a joint owners group
therefore acceptable. proposed by TSTF–486 have been activity, re: TSTF–486, ‘‘Revise MTC
The modification to the current reviewed for consistency with the Surveillance for Startup Test Activity
second paragraph in the LCO section current NUREG–1432 and WCAP– Reduction (STAR) Program (WCAP–16011),’’
adds a discussion of how MTC may be dated June 3, 2005. (ADAMS ML051580191)
16011–P–A. The proposed changes have 2. Letter from the Technical Specifications
controlled using CEA position and been found to be consistent with
boron concentration. While staff Task Force (TSTF), a joint owners group
NUREG–1432 and WCAP–16011–P–A, activity, re: ‘‘Response to NRC Request for
acknowledges that the combination of therefore the proposed changes are Additional Information Regarding TSTF–486,
CEA position and boron concentration acceptable. Revision 0,’’ ‘‘Revise MTC Surveillance for
can be used to control MTC, the staff Startup Test Activity Reduction (STAR)
believes it is an incomplete discussion 4.0 State Consultation Program (WCAP–16011),’’ and ‘‘Submittal of
that ignores the effects of temperature, In accordance with the Commission’s Revision 1,’’ dated February 20, 2007.
pressure, and power level. However, (ADAMS ML070510667)
regulations, the [ ] State official was 3. Letter from the Technical Specifications
there is no intention that the STS Basis notified of the proposed issuance of the Task Force (TSTF), a joint owners group
become a tutorial. Therefore, while the amendment. The State official had [(1) activity, re: TSTF–486, Revision 2, ‘‘Revise
discussion is incomplete it is not No comments or (2) the following MTC Surveillance for Startup Test Activity
detrimental to safety and the change is comments—with subsequent Reduction (STAR) Program (WCAP–16011),’’
acceptable. disposition by the staff]. dated March 10, 2007. (ADAMS
The Reviewer’s Note added to the ML071300267)
Surveillance Requirements section 5.0 Environmental Consideration 4. NUREG 1432, ‘‘Standard Technical
describes the restrictions on the use of The amendments change a Specifications Combustion Engineering
Plants,’’ Tevision 3.1. (ADAMS
the Alternate MTC surveillance. The requirement with respect to the ML062510040 and ML062510042)
jlentini on PROD1PC65 with NOTICES

Reviewer’s Note is consistent with installation or use of a facility 5. WCAP–16011–P–A, ‘‘Startup Test
WCAP–16011–P–A and therefore component located within the restricted Activity Reduction Program,’’ dated February
acceptable. area as defined in 10 CFR Part 20 and 2005. (ADAMS ML050660127)
The current first paragraph of the change surveillance requirements. [For The following example of an application
Surveillance Requirements section is licensees adding a TS Bases Control was prepared by the NRC staff to facilitate

VerDate Aug<31>2005 16:53 Jul 26, 2007 Jkt 211001 PO 00000 Frm 00079 Fmt 4703 Sfmt 4703 E:\FR\FM\27JYN1.SGM 27JYN1
41364 Federal Register / Vol. 72, No. 144 / Friday, July 27, 2007 / Notices

use of the consolidated line item Attachment 1—Description and Assessment analytical basis of the MTC utilizing the
improvement process (CLIIP). The model suggested changes in WCAP–16011–P. The
1.0 Description Bases modifications clarify the relationship
provides the expected level of detail and
content for an application to revise technical The proposed amendment would modify between the MTC limits specified in the Core
specifications regarding moderator TS requirements for moderator temperature Operating Limits Report (COLR) and the
temperature coefficient surveillance for coefficient (MTC) surveillance requirements maximum positive MTC value specified in
startup test activity reduction (STAR) (SR) associated with implementation of the LCO.
program using CLIIP. Licensees remain WCAP–16011–P–A, ‘‘Startup Test Activity
Reduction (STAR) Program.’’ 4.0 Environmental Evaluation
responsible for ensuring that their actual
application fulfills their administrative The changes are consistent with Nuclear [LICENSEE] has reviewed the
Regulatory Commission (NRC) approved environmental evaluation included in the
requirements as well as Nuclear Regulatory
Industry/Technical Specification Task Force model safety evaluation dated [DATE] as part
Commission regulations.
(TSTF) STS change TSTF–486 Revision 2. of the CLIIP. [LICENSEE] has concluded that
U.S. Nuclear Regular Commission, The Federal Register notice published on the staff’s findings presented in that
Document Control Desk, [DATE] announced the availability of this TS evaluation are applicable to [PLANT] and the
Washington, DC 20555. improvement through the consolidated line evaluation is hereby incorporated by
Subject: PLANT NAME, DOCKET NO. 50-, item improvement process (CLIIP). reference for this application.
APPLICATION FOR TECHNICAL
SPECIFICATION CHANGE REGARDING 2.0 Assessment Attachment 2—Proposed Technical
MODERATOR TEMPERATURE Specification Changes (Mark-Up)
2.1 Applicability of Published Safety
COEFFICIENT (MTC) SURVEILLANCE Evaluation Attachment 3—Proposed Technical
FOR STARTUP TEST ACTIVITY Specification Pages
[LICENSEE] has reviewed the safety
REDUCTION (STAR) PROGRAM USING evaluation dated [DATE] as part of the CLIIP.
THE CONSOLIDATED LINE ITEM Attachment 4—List Of Regulatory
This review included a review of the NRC Commitments
IMPROVEMENT PROCESS staff’s evaluation, as well as the supporting
Gentleman: In accordance with th provisions information provided to support TSTF–486 The following table identifies those actions
of 10 CFR 50.90 [LICENSEE] is submitting a Revision 2. [LICENSEE] has concluded that committed to by [LICENSEE] in this
request for an amendment to the technical the justifications presented in the TSTF document. Any other statements in this
specifications (TS) for [PLANT NAME, UNIT proposal and the safety evaluation prepared submittal are provided for information
NOS.]. by the NRC staff are applicable to [PLANT, purposes and are not considered to be
The proposed amendment would modify UNIT NOS.] and justify this amendment for regulatory commitments. Please direct
TS requirements for moderator temperature the incorporation of the changes to the questions regarding these commitments to
coefficient (MTC) surveillance requirements [PLANT] TS. [CONTACT NAME].
(SR) associated with implementation of
WCAP–16011–P–A, ‘‘Startup Test Activity 2.2 Optional Changes and Variations Regulatory commitments Due date/event
Reduction (STAR) Program.’’ [LICENSEE] is not proposing any variations
Attachment 1 provides a description of the or deviations from the TS changes described [LICENSEE] will establish [Complete, imple-
proposed change, the requested confirmation in the modified TSTF–486 Revision 2 and the the Technical Specifica- mented with
of applicability, and plant-specific NRC staff’s model safety evaluation dated tion Bases for TS [3.1.3] amendment
verifications. Attachment 2 provides the [DATE]. as adopted with the ap- OR within X
existing TS pages marked up to show the plicable license amend- days of imple-
3.0 Regulatory Analysis ment. mentation of
proposed change. Attachment 3 provides
3.1 No Significant Hazards Consideration amendment].
revised (clean) TS pages. Attachment 4
provides a summary of the regulatory Determination
commitments made in this submittal. [LICENSEE] has reviewed the proposed no Attachment 5—Proposed Changes to
[LICENSEE] requests approval of the significant hazards consideration Technical Specification Bases Pages
proposed License Amendment by [DATE], determination (NSHCD) published in the Proposed No Significant Hazards
with the amendment being implemented [BY Federal Register as part of the CLIIP. Consideration Determination
DATE OR WITHIN X DAYS]. [LICENSEE] has concluded that the proposed
NSHCD presented in the Federal Register Description of Amendment Request: [Plant
In accordance with 10 CFR 50.91, a copy
notice is applicable to [PLANT] and is hereby Name] requests adoption of an approved
of this application, with attachments, is being change to the standard technical
provided to the designated [STATE] Official. incorporated by reference to satisfy the
requirements of 10 CFR 50.91(a). specifications (STS) for Combustion
I declare under penalty of perjury under Engineering (CE) Plants (NUREG–1432) and
the laws of the United Stats of America that 3.2 Verification and Commitments plant specific technical specifications (TS), to
I am authorized by [LICENSEE] to make this allow modification of TS moderator
request and that the foregoing s true and As discussed in the notice of availability
published in the Federal Register on [DATE] temperature coefficient (MTC) surveillance
correct. (Note that request may be notarized requirements (SR) associated with
in lieu of using this oath or affirmation for this TS improvement, the [LICENSEE]
verifies the applicability of TSTF–486 to implementation of WCAP–16011–P–A,
statement). ‘‘Startup Test Activity Reduction (STAR)
If you should have any questions regarding [PLANT], and commits to establishing
Technical Specification Bases for TS [3.1.3] Program,’’ dated February 2005. The changes
this submittal, please contact [NAME, are consistent with NRC approved Industry/
as proposed in TSTF–486, Revision 2.
TELEPHONE NUMBER] Technical Specification Task Force (TSTF)
The proposed TSTF–486 change revises SR
Sincerely, STS Traveler, TSTF–486, Revision 1, ‘‘Revise
3.1.3.1 in the digital and analog Combustion
[Name, Title] MTC Surveillance for Startup Test Activity
Engineering STS (NUREG–1432) by adding a
Attachments: second Frequency. This second Frequency Reduction (STAR) Program (WCAP–16011).’’
1. Description and Assessment. requires verifying that MTC is within the WCAP–16011–P–A describes methods to
2. Proposed Technical Specification upper limit each fuel cycle within 7 EFPD reduce the time required for startup testing.
Changes. after reaching 40 EFPD of core burnup, but To this end, WCAP–16011–P–A proposes
3. Revised Technical Specification Pages. only when the MTC determined prior to methods to eliminate the control element
4. Regulatory Commitments. assembly (CEA) worth and isothermal
jlentini on PROD1PC65 with NOTICES

entering MODE 1 is verified using predicted


5. Proposed Technical Specification Bases MTC as adjusted for actual RCS boron temperature coefficient (ITC) measurements
Changes. concentration. The Frequency is consistent at hot zero power (HZP). The measured ITC
cc: NRC Project Manager, NRC Regional with the existing MODE 1 MTC Surveillance is then use to calculated the HZP MTC.
Office, NRC Resident Inspector, State Frequency. The Bases are revised to describe WCAP–16011–P–A includes a method to
Contact. the new requirements and to clarify the substitute the measured verification of MTC

VerDate Aug<31>2005 16:53 Jul 26, 2007 Jkt 211001 PO 00000 Frm 00080 Fmt 4703 Sfmt 4703 E:\FR\FM\27JYN1.SGM 27JYN1
Federal Register / Vol. 72, No. 144 / Friday, July 27, 2007 / Notices 41365

at HZP with an alternate MTC verification amendment request, the requested change Resolution of litigation claims; and
consisting of the predicted (calculated) MTC does not involve a significant hazards Other matters related to enforcement
and measured critical boron concentration consideration. proceedings.
(CBC) at HZP. When this alternate MTC At times, changes in Commission
Dated at Rockville, Maryland, this 19th day
verification is utilized, WCAP–16011–P–A priorities require alterations in the
of July, 2007.
adds the requirement for the early in cycle
MTC measurement to verify MTC is not more For The Nuclear Regulatory Commission. scheduling of meeting items.
negative than allowed is also used to verify Timothy J. Kobetz, For further information and to
MTC is not more positive than allowed. ascertain what, if any, matters have been
Section Chief, Technical Specifications
WCAP–16011–P–A adds an ITC Branch, Division of Inspection & Regional added, deleted or postponed, please
measurement at intermediate to hot full Support, Office of Nuclear Reactor contact:
power (HFP) and applicability requirements Regulation. The Office of the Secretary at (202)
for core design, fabrication, refueling, startup 551–5400.
testing, and CEA lifetime viability [FR Doc. E7–14573 Filed 7–26–07; 8:45 am]
requirements. WCAP–16011–P–A methods BILLING CODE 7590–01–P Dated: July 24, 2007
can only be applied to cores that are well Nancy M. Morris,
characterized by an existing database. Secretary.
Basis for proposed no significant hazards SECURITIES AND EXCHANGE [FR Doc. E7–14597 Filed 7–26–07; 8:45 am]
consideration determination: As required by
10 CFR 50.91(a), an analysis of the issue of
COMMISSION BILLING CODE 8010–01–P

no significant hazards consideration is


presented below: Sunshine Act Meetings
Criterion 1—The Proposed Change Does Not
SECURITIES AND EXCHANGE
Notice is hereby given, pursuant to
Involve a Significant Increase in the COMMISSION
the provisions of the Government in the
Probability or Consequences of an Sunshine Act, Public Law 94–409, that [Release No. 34–56109; File No. SR–CBOE–
Accident Previously Evaluated 2007–75]
the Securities and Exchange
The proposed change generically Commission will hold the following
implements MTC SR changes associated with Self-Regulatory Organizations;
implementation of WCAP–16011–P–A, STAR meetings during the week of July 30,
2007: Chicago Board Options Exchange,
Program. WCAP–16011–P–A describes Incorporated; Notice of Filing and
methods to reduce the time required for Closed Meetings will be held on
startup testing. The consequences of an Tuesday, July 31, 2007 at 2 p.m. and Immediate Effectiveness of a Proposed
accident after adopting TSTF–486 are no Thursday, August 2, 2007 at 2 p.m. Rule Change Relating to the Extension
different than the consequences of an Commissioners, Counsel to the of the Customer Portfolio Margin Pilot
accident prior to adoption. Therefore, this Commissioners, the Secretary to the Program
change does not involve a significant Commission, and recording secretaries
increase in the probability or consequences July 19, 2007.
of an accident previously evaluated. will attend the Closed Meetings. Certain Pursuant to section 19(b)(1) of the
Criterion 2—The Proposed Change Does Not
staff members who have an interest in Securities Exchange Act of 1934 (‘‘Act’’
Create the Possibility of a New or Different the matters may also be present. or ‘‘Exchange Act’’) 1 and Rule 19b–4
Kind of Accident From any Previously The General Counsel of the thereunder,2 notice is hereby given that
Evaluated Commission, or his designee, has on June 29, 2007, Chicago Board
The proposed change does not involve a certified that, in his opinion, one or Options Exchange, Incorporated
physical alteration of the plant (no new or more of the exemptions set forth in 5 (‘‘CBOE’’ or ‘‘Exchange’’) filed with the
different type of equipment will be installed) U.S.C. 552b(c)(3), (5), (7), (8), (9)(B), and Securities and Exchange Commission
or a change in the methods governing normal (10) and 17 CFR 200.402(a)(3), (5), (7),
plant operation. The proposed change will
(‘‘Commission’’) the proposed rule
(8), 9(ii) and (10), permit consideration change as described in Items I, II, and
not introduce new failure modes or effects
of the scheduled matters at the Closed III below, which Items have been
and will not, in the absence of other
unrelated failures, lead to an accident whose Meetings. substantially prepared by CBOE. CBOE
consequences exceed the consequences of Commissioner Nazareth, as duty has filed the proposed rule as a ‘‘non-
accidents previously analyzed. Thus, this officer, voted to consider the items controversial’’ proposed rule change
change does not create the possibility of a listed for the closed meetings in closed pursuant to section 19(b)(3)(A) of the
new or different kind of accident from any sessions. Act 3 and Rule 19b–4(f)(6) thereunder,4
accident previously evaluated. The subject matter of the Closed which renders the proposal effective
Criterion 3—The Proposed Change Does Not Meeting scheduled for Tuesday, July 31,
Involve a Significant Reduction in the
upon filing with the Commission. The
2007 will be: Commission is publishing this notice to
Margin of Safety Formal orders of investigations;
TSTF–486 provides the means and solicit comments on the proposed rule
Institution and settlement of change from interested persons.
standardized wording for CE STS plants injunctive actions;
implementing the previously approved I. Self-Regulatory Organization’s
Institution and settlement of
WCAP–16011–P–A alternate MTC
verification at startup. MTC is a parameter administrative proceedings of an Statement of the Terms of Substance of
controlled in the licensee’s TS, including enforcement nature; the Proposed Rule Change
surveillance requirements. As stated Resolution of litigation claims; and CBOE proposes to extend an existing
previously WCAP–16011–P–A describes Other matters related to enforcement customer portfolio margining pilot
methods to reduce the time required for proceedings. program (‘‘Pilot Program’’) through July
startup testing. The changes to NUREG–1432 The subject matter of the Closed
proposed by TSTF–486 have been reviewed
31, 2008. The Pilot Program is codified
Meeting scheduled for Thursday, in CBOE Rules 12.4, 9.15(c), 13.5 and
for and found to be consistent with the August 2, 2007 will be: 15.8A. There is no change to the rule
jlentini on PROD1PC65 with NOTICES

current NUREG–1432 and WCAP–16011–P–


A, and therefore the proposed changes are
Institution and settlement of
acceptable and do not involve a significant injunctive actions; 1 15 U.S.C. 78s(b)(1).
reduction in a margin of safety. Institution and settlement of 2 17 CFR 240.19b–4.
Based upon the reasoning presented above administrative proceedings of an 3 15 U.S.C. 78s(b)(3)(A).

and the previous discussion of the enforcement nature; 4 17 CFR 240.19b–4(f)(6).

VerDate Aug<31>2005 16:53 Jul 26, 2007 Jkt 211001 PO 00000 Frm 00081 Fmt 4703 Sfmt 4703 E:\FR\FM\27JYN1.SGM 27JYN1

Das könnte Ihnen auch gefallen