Federal Register / Vol. 72, No.

139 / Friday, July 20, 2007 / Notices 39807

The ICR provides a detailed Geothermal Resources, El Centro which exceeds the geographic scope of
explanation of the Agency’s estimate, Field Office, Imperial County, CA. the salt ponds restoration project. EPA
which is only briefly summarized here: Summary: EPA expressed also expressed concerns about
Estimated average annual number of environmental concerns about impacts construction and operational emissions.
grants affected: between 240 and 480. on air quality, water resources, habitat, Rating EC2.
Estimated annual frequency of and recreational use in the OWSVRA. EIS No. 20070096, ERP No. D–USA–
response: Quarterly or less often. Additionally, EPA is concerned that the D15000–MD, Garrison Aberdeen
Estimated annual average number of geothermal resources within the Proving Ground, Base Realignment
responses for each grant: 4. Truckhaven GLA may be and Closure Actions, Realignment of
Estimated total annual respondent underestimated, and that cumulative Assets and Staff, Implementation,
burden hours: 12,820 hours. impacts associated with multiple Harford and Baltimore Counties, MD.
Estimated total annual respondent geothermal projects on private and Summary: EPA expressed
costs: $359,149. This includes an public land have not been analyzed. environmental concern about potential
estimated labor cost of $359,149 and $0 Rating EC2. impacts to natural resources. EPA stated
for capital investment or maintenance EIS No. 20070061, ERP No. D–BLM– that this project also presents an
and operational costs. K09810–CA, Mountain View IV Wind excellent opportunity to implement the
What Is the Next Step in the Process for Energy Project, Construction and President’s Executive Order 13423,
This ICR? Operation, Wind Turbine Generators Strengthening Federal Environmental,
on Public Lands in Section 22 and 28 Energy and transportation management
EPA will consider the comments and Private Land Section 27, Right-of-
received and amend the ICR as by incorporating energy efficiency into
Way Grant and Conditional Use the retrofit or construction efforts for
appropriate. The final ICR package will Permit in the City of Palm Springs,
then be submitted to OMB for review this project. Rating EC2.
CA . EIS No. 20070049, ERP No. DA–FTA–
and approval pursuant to 5 CFR
Summary: EPA does not object to the K40208–CA, South Sacramento
1320.12. At that time, EPA will issue
project as proposed, but suggests Corridor Phase 2, Improve Transit
another Federal Register notice
incorporating additional mitigation Service and Enhance Regional
pursuant to 5 CFR 1320.5(a)(1)(iv) to
measures to minimize air quality Connectivity, Funding, in the City
announce the submission of the ICR to
impacts during construction. Rating LO. and County Sacramento, CA.
OMB and the opportunity to submit
additional comments to OMB. If you EIS No. 20070065, ERP No. D–BLM– Summary: EPA does not object to the
have any questions about this ICR or the K65326–CA, Eastern San Diego proposed project. Rating LO.
approval process, please contact the County Resource Management Plan,
Implementation, San Diego County, EIS No. 20070075, ERP No. DS–APH–
technical person listed under FOR A99222–00, Importation of Solid
FURTHER INFORMATION CONTACT.
CA.
Wood Packing Material, To Re-
Summary: EPA is supportive of an
Dated: July 13, 2007. evaluate and Refine Estimates of
alternative that balances ecological and
Kathleen Herrin, Methyl Bromide Usage in the
economic needs; however, the final EIS
Acting Director of the Office of Grants and Treatment, Implementation, United
should include additional information
Debarment. States.
on air and water quality impacts,
[FR Doc. E7–14064 Filed 7–19–07; 8:45 am] existing ecological conditions, and Summary: EPA does not object to the
BILLING CODE 6560–50–P future monitoring plans. Rating EC2. proposed action. Rating LO.
EIS No. 20070068, ERP No. D–BLM– EIS No. 20070112, ERP No. DS–SFW–
K65327–AZ, Ironwood Forest K99034–CA, Coachella Valley,
ENVIRONMENTAL PROTECTION National Monument, Resource Revision to the Multiple Species
AGENCY Management Plan, Implementation, Habitat Conservation Plan (MSHCP),
[ER–FRL–6689–2] Tucson Field Office, AZ. Natural Community Conservation
Summary: EPA expressed Plan, Santa Rosa and San Jacinto
Environmental Impact Statements and environmental concerns about Mountains Trails Plan, Issuance of
Regulations; Availability of EPA environmental impacts from off- Incidental Take Permit, Riverside
Comments highway vehicles (OHV), livestock County, CA.
grazing, and mining, and recommends Summary: No formal letter was sent to
Availability of EPA comments
restricting OHV use and implementing a the preparing agency. Rating NC.
prepared pursuant to the Environmental
Review Process (ERP), under section biological monitoring and adaptive Final EISs
309 of the Clean Air Act and Section management plan. Rating EC2.
EIS No. 20070083, ERP No. D–SFW– EIS No. 20070059, ERP No. F–NPS–
102(2)(c) of the National Environmental
K39015–CA, PROGRAMMATIC— K39094–NV, Clean Water Coalition
Policy Act as amended. Requests for
South Bay Salt Pond Restoration Systems Conveyance and Operations
copies of EPA comments can be directed
Project, Restored Tidal Marsh, Program, (SCOP) Construction,
to the Office of Federal Activities at
Managed Ponds, Flood Control Operation and Maintenance, Boulder
202–564–7167.
Measures and Public Access Features, Islands North is the Selected
An explanation of the ratings assigned
Don Edward San Francisco Bay Alternative, City of Las Vegas, NV.
to draft environmental impact
statements (EISs) was published in FR National Wildlife Refuge, Alameda, Summary: No formal comment letter
mstockstill on PROD1PC66 with NOTICES

dated April 6, 2007 (72 FR 17156). Santa Clara and San Mateo Counties, was sent to the preparing agency.
CA. EIS No. 20070125, ERP No. F–NPS–
Draft EISs Summary: EPA expressed K65082–AZ, Walnut Canyon National
EIS No. 20070042, ERP No. D–BLM– environmental concerns about the Monument, General Management
K09809–CA, Truckhaven Geothermal programmatic approach taken by Plan, Implementation, Flagstaff Area,
Leasing Area, Addresses Leasing of USFWS for the related shoreline study Coconina County, AZ.

VerDate Aug<31>2005 16:19 Jul 19, 2007 Jkt 211001 PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 E:\FR\FM\20JYN1.SGM 20JYN1
39808 Federal Register / Vol. 72, No. 139 / Friday, July 20, 2007 / Notices

Summary: No formal letter was sent to EIS No. 20070179, ERP No. FS–AFS– Reliable, Ground Access Route, Logan
the preparing agency. L65509–WA, School Fire Salvage Ranger District, Wasatch-Cache
EIS No. 20070136, ERP No. F–COE– Recovery Project, To Clarify National Forest, Cache County, UT,
K39100–CA, Hemet/San Jacinto Definitions of Live and Dead Trees, Comment Period Ends: 09/04/2007,
Integrated Recharge and Recovery Implementation, Pomeroy Ranger Contact: Evelyn Sibbernsen 435–755–
Program, Construction and Operation, District, Umatilla National Forest, 3620.
US Army COE Section 404 Permit, Columbia and Garfield Counties, WA. EIS No. 20070299, Draft EIS, AFS, WY,
Riverside County, CA. Summary: EPA does not object to the Battle Park Cattle and Horse (C&H)
Summary: The final EIS has proposed action; however, EPA and Mistymoon Sheep and Goat (S&G)
addressed many of EPA’s earlier supports the monitoring of the survival Allotment Project, Proposes to
concerns; however, EPA continues to of fire-damaged trees across the project Continue Livestock Grazing on both
express concerns about impacts to area (both inside and outside of sale Allotments, Powder River District
waters of the U.S. and provided several units), to validate the predicted Ranger, Bighorn National Forest,
recommendations for inclusion in the outcomes. Bighorn County, WY, Comment
Record of Decision to address those Period Ends: 09/04/2007, Contact:
Dated: July 17, 2007. Mark Booth 303–684–7806.
impacts. Robert W. Hargrove, EIS No. 20070300, Legislative Draft EIS,
EIS No. 20070139, ERP No. F–MMS– Director, NEPA Compliance Division, Office USA, MT, Limestone Hills Training
A02245–00, Gulf of Mexico Outer of Federal Activities. Area (LHTA) Withdrawal Project, To
Continental Shelf Oil and Gas. Lease [FR Doc. E7–14107 Filed 7–19–07; 8:45 am] Withdraw Federal Lands from within
Sales: 2007–2012 Western Planning
BILLING CODE 6560–50–P the LHTA from DOI, Bureau of Land
Area Sales 204, 207, 210, 215, and
Management for Transfer to Montana
218: Central Planning Area Sales 205,
Army National Guard for Military
206, 208, 213, 216, and 222, TX, LA, ENVIRONMENTAL PROTECTION Training Use, Broadwater County,
MS, AL and FL. AGENCY MT, Comment Period Ends: 10/19/
Summary: No formal comment letter 2007 Contact: Patrick Magnotta 703–
was sent to the preparing agency. [ER–FRL–6689–1]
607–7982.
EIS No. 20070146, ERP No. F–COE– Environmental Impacts Statements; EIS No. 20070301, Legislative Draft EIS,
K36147–CA, ADOPTION—Folsom Notice of Availability COE, LA, Mississippi River—Gulf
Dam Safety and Flood Damage Outlet (MRGO) Deep-Draft Navigation
Reduction Project, Addressing Responsible Agency: Office of Federal De-Authorization Study,
Hydrologic, Seismic, Static, and Flood Activities, General Information (202) Implementation, St. Bernard Parish,
Management Issues, Sacramento, El 564–7167 or http://www.epa.gov/ LA, Comment Period Ends: 09/04/
Dorado and Placer Counties, CA. compliance/nepa/. 2007, Contact: Sean Mickal 504–862–
Summary: EPA continues to express Weekly receipt of Environmental Impact 2319.
environmental concern about potential Statements EIS No. 20070302, Final EIS, USA, NM,
water quality impacts from future Filed 07/09/2007 Through 07/13/2007 Cannon Air Force Base (AFB),
actions associated with this project. Pursuant to 40 CFR 1506.9. Proposal to Beddown, or Locate Air
EIS No. 20070182, ERP No. F–COE– EIS No. 20070295, Draft EIS, AFS, CO, Force Special Operations Command
D35062–MD, Masonville Dredged Hunter Reservoir Enlargement Project, (AFSOC), Implementation, Base
Material Containment Facility, New Reconstruction and Enlargement, Ute Realignment and Closure (BRAC),
Information, New Source of Dike Water Conservancy District, U.S. NM, Wait Period Ends: 08/20/2007,
Building Material from the Seagirt Army COE Section 404 Permit, Grand Contact: Carl T. Hoffman 850–884–
Dredging Project within the Patapsco Mesa National Forest, Mesa County, 5984.
River, Funding, Baltimore, MD. CO, Comment Period Ends: 09/04/ EIS No. 20070303, Draft EIS, FRA, CA,
Summary: EPA’s previous concerns 2007, Contact: Carrie Suber 970–242– Bay Area to Central Valley High-
have been resolved; therefore, EPA does 8211. Speed Train (HST) Project, Provide a
not object to the proposed action. EIS No. 20070296, Draft EIS, AFS, CA, Reliable High-Speed Electrified Train
Eldorado National Forest Public System to Link Bay Area Cities to the
EIS No. 20070183, ERP No. F–FHW–
Wheeled Motorized Travel Central Valley, Sacramento, and
K40259–CA, Big Bear Lake Bridge
Management Project, Proposes to South California, Comment Period
Replacement Project, near Big Bear
Regulate Unmanaged Public Wheeled Ends: 09/28/2007, Contact: David
Lake on CA–18 from Kilopost 71.1/
Motor Vehicle, Implementation, Valenstein 202–493–6368.
71.9, Realignment and Widening EIS No. 20070304, Draft EIS, USN, VA,
Alphine, Amador, El Dorado and
Roadways, U.S. COE Section 404 Marine Corps Base Quantico (MCBQ)
Placer Counties, CA, Comment Period
Permit, Funding, San Bernardino Virginia Project, Proposes
Ends: 09/04/2007, Contact: Laura
National Forest, San Bernardino Development of the Westside of
Hierholzer 530–642–5187.
County, CA. EIS No. 20070297, Draft EIS, AFS, UT, MCBQ and the 2005 Base
Summary: No formal letter was sent to Big Creek Vegetation Treatment Realignment and Closure Action at
the preparing agency. Project, To Treat 4,800 Acres of Aspen MCBQ, Implementation, Quantico,
EIS No. 20070189, ERP No. F–NRS– Conifer and Sagebrush Communities, VA, Comment Period Ends: 09/04/
D36122–WV, Dunloup Creek Ogden Ranger District, Wasatch-Cache 2007, Contact: Jeff Gardner 703–432–
Watershed Plan, Voluntary National Forest, Rich County, UT, 6784.
mstockstill on PROD1PC66 with NOTICES

Floodplain Buyout, Implementation, Comment Period Ends: 09/04/2007, EIS No. 20070305, Draft EIS, BPA, MT,
West Virginia Third Congressional Contact: Chip Sibbernsen 801–625– Libby (FEC) to Troy Section of BPA’s
District, Fayette and Raleigh Counties, 5112. Libby to Bonner Ferry 115-kilovolt
WV. EIS No. 20070298, Draft EIS, AFS, UT, Transmission Line Project, Rebuilding
Summary: EPA does not object to the Millville Peak/Logan Peak Road Transmission Line between Libby and
proposed action. Relocation Project, Provide a Safe, Troy, Lincoln County, MT, Comment

VerDate Aug<31>2005 16:19 Jul 19, 2007 Jkt 211001 PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 E:\FR\FM\20JYN1.SGM 20JYN1