Federal Register / Vol. 72, No.

137 / Wednesday, July 18, 2007 / Notices 39389

Review will serve to notify federal and Commission (except for the mailing of permitted under 18 CFR part 157,
state agencies of the timing for the environmental documents issued by the subpart F. This filing is available for
completion of all necessary reviews, and Commission) and will not have the right review at the Commission in the Public
the subsequent need to complete all to seek court review of the Reference Room or may be viewed on
federal authorizations within 90 days of Commission’s final order. the Commission’s Web site at http://
the date of issuance of the Commission The Commission strongly encourages www.ferc.gov using the ‘‘e-Library’’ link.
staff’s FEIS or EA. electronic filings of comments, protests Enter the docket number excluding the
There are two ways to become and interventions in lieu of paper using last three digits in the docket number
involved in the Commission’s review of the ‘‘eFiling’’ link at: http:// field to access the document. For
this project. First, any person wishing to www.ferc.gov. Persons unable to file assistance, contact FERC at
obtain legal status by becoming a party electronically should submit an original FERCOnlineSupport or call toll-free,
to the proceedings for this project and 14 copies of the protest or (866) 208–3676, or for TTY, (202) 502–
should, on or before the comment date intervention to the Federal Energy 8659.
stated below, file with the Federal regulatory Commission, 888 First Street, Any questions regarding this
Energy Regulatory Commission, 888 NE., Washington, DC 20426. application should be directed to David
First Street, NE., Washington, DC 20426, This filing is accessible on-line at: Schultz, Project Manager, Golden
a motion to intervene in accordance http://www.ferc.gov, using the Triangle Storage, Inc., 1200 Smith
with the requirements of the ‘‘eLibrary’’ link and is available for Street, Suite 900, Houston, TX 77002,
Commission’s Rules of Practice and review in the Commission’s Public phone: (832) 397–3739, e-mail:
Procedure (18 CFR 385.214 or 385.211) Reference Room in Washington, DC. goldentrianglestorage@
and the Regulations under the NGA (18 There is an ‘‘eSubscription’’ link on the aglresources.com.
CFR 157.10). A person obtaining party web site that enables subscribers to The Golden Triangle Storage Project
status will be placed on the service list receive e-mail notification when a consists of developing two natural gas
maintained by the Secretary of the document is added to a subscribed storage caverns in the Spindletop salt
Commission and will receive copies of docket(s). For assistance with any FERC dome, developing up to five salt brine
all documents filed by the applicant and Online service, please e-mail disposal wells, installing a 16-inch
by all other parties. A party must submit FERCOnlineSupport@ferc.gov, or call freshwater pipeline, installing a 16-inch
14 copies of filings made with the (866) 208–3676 (toll free). For TTY, call brine disposal pipeline, installing a
Commission and must mail a copy to (202) 502–8659. leaching plant, installing 14,205
the applicant and to every other party in Comment Date: 5 p.m. Eastern Time horsepower of compression, and
the proceeding. Only parties to the on July 27, 2007. installing approximately 8.9 miles of 24-
proceeding can ask for court review of inch header pipeline and six associated
Commission orders in the proceeding. Kimberly D. Bose, meter stations and pipeline
However, a person does not have to Secretary. interconnects. Golden Triangle says that
intervene in order to have comments [FR Doc. E7–13820 Filed 7–17–07; 8:45 am] the facilities will ultimately provide an
considered. The second way to BILLING CODE 6717–01–P estimated 16 billion cubic feet (Bcf) of
participate is by filing with the high deliverability, multi-cycle working
Secretary of the Commission, as soon as storage capacity in two stages of
possible, an original and two copies of DEPARTMENT OF ENERGY development. In the first stage, Golden
comments in support of or in opposition Triangle will solution mine each of the
to this project. The Commission will Federal Energy Regulatory storage caverns to a volume of 8.2
consider these comments in Commission million barrels for a working storage
determining the appropriate action to be [Docket Nos. CP07–414–000; CP07–415– capacity or about 6 Bcf per cavern, and
taken, but the filing of a comment alone 000; CP07–416–000] then place the caverns in commercial
will not serve to make the filer a party service, the first in late 2010 and the
to the proceeding. The Commission’s Golden Triangle Storage, Inc. Notice of second in early 2013. Thereafter, in the
rules require that persons filing Applications second stage, through use of a partial
comments in opposition to the project cavern refilling solution mining
provide copies of their protests only to July 9, 2007. technique, Golden Triangle proposes to
the party or parties directly involved in Take notice that on June 29, 2007 and gradually enlarge each of the caverns
the protest. as supplemented on July 6, 2007 Golden over a 10–12 year period to a potential
Persons who wish to comment only Triangle Storage, Inc. (Golden Triangle), maximum volume of up to 12.5 million
on the environmental review of this 1200 Smith Street, Suite 900, Houston, barrels for a working storage capacity of
project should submit an original and Texas 77002, pursuant to section 7(c) of 8 Bcf per cavern (16 Bcf in total).
two copies of their comments to the the Natural Gas Act (NGA) and Parts Golden Triangle seeks Commission
Secretary of the Commission. 157 and 284 of the Commission’s certificate authorizations for both
Environmental commentors will be regulations, filed an abbreviated caverns and both stages of cavern
placed on the Commission’s application for certificates of public development at this time.
environmental mailing list, will receive convenience and necessity, seeking Golden Triangle says that the need for
copies of the environmental documents, authority to develop and operate a two- the Project’s services has already been
and will be notified of meetings cavern salt dome natural gas storage confirmed by the market. In response to
associated with the Commission’s facility located near Beaumont in a non-binding open season held in May
environmental review process. Jefferson and Orange Counties, Texas; to 2007, Golden Triangle received bids
Environmental commentors will not be provide open-access firm and representing about three and a half
pwalker on PROD1PC71 with NOTICES

required to serve copies of filed interruptible storage and hub services in times the initial 6 Bcf working gas
documents on all other parties. interstate commerce at market-based capacity of Cavern 1 from a diverse
However, the non-party commentors rates under 18 CFR part 284, subpart G; group of potential customers, including
will not receive copies of all documents and to undertake the limited marketers, producers and other entities.
filed by other parties or issued by the construction and operation activities Golden Triangle is now negotiating

VerDate Aug<31>2005 16:02 Jul 17, 2007 Jkt 211001 PO 00000 Frm 00012 Fmt 4703 Sfmt 4703 E:\FR\FM\18JYN1.SGM 18JYN1
39390 Federal Register / Vol. 72, No. 137 / Wednesday, July 18, 2007 / Notices

precedent agreements with the highest proceeding can ask for court review of DEPARTMENT OF ENERGY
bidders for longterm, firm service Commission orders in the proceeding.
contracts. Once it concludes Federal Energy Regulatory
However, a person does not have to
negotiations, Golden Triangle says it Commission
intervene in order to have comments
will file its executed precedent considered. The second way to [Docket No. CP07–8–002]
agreements as a supplement to this
participate is by filing with the
application. Guardian Pipeline, L.L.C., Notice of
Secretary of the Commission, as soon as
Golden Triangle proposes to offer Amendment
possible, an original and two copies of
open access firm and interruptible
comments in support of or in opposition July 10, 2007.
storage and hub services and requests
authority to charge market-based rates to this project. The Commission will Take notice that on July 2, 2007,
for its proposed services, which it says consider these comments in Guardian Pipeline, L.L.C. (Guardian),
is consistent with the requirements of determining the appropriate action to be filed in Docket No. CP07–8–002, an
the Commission’s Alternative taken, but the filing of a comment alone amendment to its October 13, 2006
Ratemaking Policies. The proposed will not serve to make the filer a party application pursuant to section 7 (c) of
terms and conditions for Golden to the proceeding. The Commission’s the Natural Gas Act (NGA) in which it
Triangle’s services are included in the rules require that persons filing requested authorization to site,
comments in opposition to the project construct, and operate facilities
pro forma tariff included in Exhibit P of
provide copies of their protests only to consisting of approximately 118 miles of
the application.
the party or parties directly involved in new mainline, two electric compressor
Pursuant to section 157.9 of the stations, seven meter stations and
Commission’s rules, 18 CFR 157.9, the protest.
appurtenant facilities resulting in
within 90 days of this Notice the Persons who wish to comment only 537,200 Dth/d of incremental firm
Commission staff will either: Complete on the environmental review of this capacity on Guardian’s existing pipeline
its environmental assessment (EA) and project should submit an original and system and 437,200 Dth/d of firm
place it into the Commission’s public two copies of their comments to the capacity on the expansion facilities. The
record (eLibrary) for this proceeding, or Secretary of the Commission. amended application is reflected in
issue a Notice of Schedule for Environmental commenters will be Guardian’s June 6, 2007 filing that
Environmental Review. If a Notice of proposes route variations between MPs
placed on the Commission’s
Schedule for Environmental Review is 88.0 and 98.2, moving two meter
environmental mailing list, will receive
issued, it will indicate, among other stations, and construction of short
copies of the environmental documents,
milestones, the anticipated date for the branch lines between those meter
Commission staff’s issuance of the final and will be notified of meetings
associated with the Commission’s stations and Wisconsin Public Service
environmental impact statement (FEIS) Corporation’s proposed interconnecting
or EA for this proposal. The filing of the environmental review process.
Environmental commenters will not be pipeline facilities, all as more fully set
EA in the Commission’s public record forth in the amended application which
for this proceeding or the issuance of a required to serve copies of filed
is on file with the Commission and open
Notice of Schedule for Environmental documents on all other parties.
to public inspection. The Commission
Review will serve to notify federal and However, the non-party commenters staff will determine if this amendment
state agencies of the timing for the will not receive copies of all documents will have an effect on the schedule for
completion of all necessary reviews, and filed by other parties or issued by the the environmental review of this
the subsequent need to complete all Commission (except for the mailing of project. If necessary, a Notice of
federal authorizations within 90 days of environmental documents issued by the Schedule for Environmental Review
the date of issuance of the Commission Commission) and will not have the right will be issued within 90 days of this
staff’s FEIS or EA. to seek court review of the Notice. The instant filing may be also
There are two ways to become Commission’s final order. viewed on the web at http://
involved in the Commission’s review of Motions to intervene, protests and www.ferc.gov using the ‘‘eLibrary’’ link.
this Project. First, any person wishing to comments may be filed electronically Enter the docket number excluding the
obtain legal status by becoming a party via the Internet in lieu of paper; see 18 last three digits in the docket number
to the proceeding for this project field to access the document. For
CFR 285.2001(a)(1)(iii) and the
should, on or before the comment date assistance, call (866) 208–3676 or TTY,
instructions on the Commission’s Web
stated below, file with the Federal (202) 502–8659.
Energy Regulatory Commission, 888 site under the ‘‘e-Filing’’ link. The
Any questions regarding this
First Street, NE., Washington, DC 20426, Commission strongly encourages
application may be directed to Patricia
a motion to intervene in accordance electronic filings. Anderson, GM, Rates and Regulatory
with the requirements of the Comment Date: July 23, 2007. Affairs, ONEOK Partners GP, LLC, 100
Commission’s Rules of Practice and W. Fifth Street, 12th Floor, Tulsa,
Kimberly D. Bose,
Procedure (18 CFR 385.214 or 385.211) Oklahoma 74103; phone: (918) 588–
and the Regulations under the NGA (18 Secretary. 7729; e-mail: panderson@oneok.com.
CFR 157.10). A person obtaining party [FR Doc. E7–13852 Filed 7–17–07; 8:45 am] There are two ways to become
status will be placed on the service list BILLING CODE 6717–01–P involved in the Commission’s review of
maintained by the Secretary of the this project. First, any person wishing to
Commission and will receive copies of obtain legal status by becoming a party
all documents filed by the applicant and to the proceedings for this project
pwalker on PROD1PC71 with NOTICES

by all other parties. A party must submit should, on or before the below listed
14 copies of filings made with the comment date, file with the Federal
Commission and must mail a copy to Energy Regulatory Commission, 888
the applicant and to every other party in First Street, NE, Washington, DC 20426,
the proceeding. Only parties to the a motion to intervene in accordance