Sie sind auf Seite 1von 2

Federal Register / Vol. 72, No.

134 / Friday, July 13, 2007 / Notices 38575

develop, acquire, install, and utilize Agency once each month, for a total of application for each respondent is
technology and systems for the purposes 396 times annually (32 qualifying estimated to be 59.29 hours. This
of collecting, validating, and verifying product lists multiplied by 12 months in estimate includes reviewing instructions
information, processing and a year). Approximately twice each on the application, gathering data and
maintaining information, and disclosing month the Agency receives a request for information for submission, completing
and providing information; adjust the qualifying product information that the application, reviewing the
existing ways to comply with any cannot be fulfilled by the ENERGY information and narrative description
previously applicable instructions and STAR Web site, for a total of 792 required, and submitting the application
requirements which have subsequently requests. The reporting burden for to EPA.
changed; train personnel to be able to information collection requirements
respond to a collection of information; associated with completing qualifying Are There Changes in the Estimates
search data sources; complete and product information for each qualifying from the Last Approval?
review the collection of information; product submitted by a respondent is There is an increase of approximately
and transmit or otherwise disclose the estimated to be 4.85 hours. This 18,483 hours in the total estimated
information. estimate includes time for reviewing respondent burden compared with that
The estimated total cost for instructions, completing and reviewing identified in the ICR currently approved
respondents is $7,056,533 and the the information requested, and by OMB. Although the estimated burden
hourly burden is approximately 89,150 submitting the information. hours for each individual collection
hours. This cost includes an estimated ENERGY STAR Partners for activity decreased, the overall increase
burden cost of $6,817,702 and an residential light fixtures and roof in burden hours reflects the increased
estimated cost of $238,831 for capital products are required to submit testing number of roof products and residential
investment or maintenance and reports for each product determined to light fixture Partners that are required to
operational costs. The estimated total be ENERGY STAR qualified. It is submit testing reports along with
cost for the Agency is $468,724 and the anticipated that qualifying product qualifying product information. The
hourly burden is approximately 11,932 information for 4,464 new roof and currently approved ICR estimated 654
hours. This cost includes an estimated residential light fixture products will be respondents, whereas this ICR estimates
burden cost of $467,508 and an received by EPA each year for the three 4,464 respondents for this activity. This
estimated cost of $1,216 for capital years of this ICR. The reporting burden change is an adjustment.
investment or maintenance and for information collection requirements
operational costs. A grand total of associated with testing reports by roof What is the Next Step in the Process for
$7,525,257 and an hourly burden of product and residential light fixture this ICR?
approximately 101,082 hours are Partners for each qualifying product EPA will consider the comments
expected for all information collection submitted by a respondent is estimated received and amend the ICR as
activities under ENERGY STAR product to be 14.30 hours. This estimate appropriate. The final ICR package will
labeling. includes performing testing in-house or then be submitted to OMB for review
EPA collects initial information in the by a Third Party, assembling the data and approval pursuant to 5 CFR
Partnership Agreement (PA), which is into a report format, reviewing it, and 1320.12. At that time, EPA will issue
completed and submitted by every submitting it. another Federal Register notice
Partner participating in ENERGY STAR. Each year, ENERGY STAR Partners pursuant to 5 CFR 1320.5(a)(1)(iv) to
One overarching PA has been developed are required to submit unit shipment announce the submission of the ICR to
by EPA for ENERGY STAR product data for their ENERGY STAR qualified OMB and the opportunity to submit
labeling. It is expected that 292 new products. There will be an average of additional comments to OMB. If you
Partners will join each year for the three 692 total Partners each year for the three have any questions about this ICR or the
years of this ICR. The reporting burden years of this ICR. Therefore, 692 reports approval process, please contact the
for information collection requirements of unit shipment data are expected each technical person listed under FOR
associated with completing the PA for year for the three years of this ICR. Unit FURTHER INFORMATION CONTACT.
each respondent is estimated to be 4.20 shipment data will be aggregated for
hours. This estimate includes time for each of the 33 product categories Dated: June 29, 2007.
reviewing the instructions on the PA, covered by EPA under ENERGY STAR. Kathleen Hogan,
completing and reviewing the The reporting burden for information Director, Climate Protection Partnerships
information requested by the PA, and collection requirements associated with Division.
submitting the PA. unit shipment data for each respondent [FR Doc. E7–13623 Filed 7–12–07; 8:45 am]
Every manufacturing Partner is is estimated to be 6.69 hours. This BILLING CODE 6560–50–P
required to submit information on each estimate includes reviewing
of their qualifying products. Annual instructions, gathering unit shipment
updates, at minimum, notifying EPA of data, compiling and reviewing it by ENVIRONMENTAL PROTECTION
any changes in qualifying product category, and submitting it. AGENCY
information, are required as well. Partners interested in receiving
[ER–FRL–6688–9]
Thirty-three different product categories recognition for their efforts on ENERGY
are covered by EPA under ENERGY STAR are required to submit a Partner Environmental Impact Statements and
STAR. Each product category has of the Year application. One set of Regulations; Availability of EPA
specific qualifying product information Partner of the Year award criteria are Comments
that must be submitted by each Partner developed by the Agency each year and
for at least one qualifying product. posted on the ENERGY STAR Web site. Availability of EPA comments
pwalker on PROD1PC71 with NOTICES

Qualifying product information is An average of 17 award applications are prepared pursuant to the Environmental
expected for 9,986 new qualifying expected each year for the three years of Review Process (ERP), under section
products each year for the three years of this ICR. The reporting burden for 309 of the Clean Air Act and Section
this ICR. The qualifying product list for information collection requirements 102(2)(c) of the National Environmental
each product category is updated by the associated with the Partner of the Year Policy Act as amended. Requests for

VerDate Aug<31>2005 19:05 Jul 12, 2007 Jkt 211001 PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 E:\FR\FM\13JYN1.SGM 13JYN1
38576 Federal Register / Vol. 72, No. 134 / Friday, July 13, 2007 / Notices

copies of EPA comments can be directed public health from exposure to naturally EIS No. 20070284, Draft Supplement,
to the Office of Federal Activities at occurring asbestos. DOE, CA, Sacramento Area Voltage
202–564–7167. EIS No. 20070250, ERP No. F–NPS– Support Project, Updated Information,
An explanation of the ratings assigned D65037–PA, Flight 93 National Proposal to Build a Double-Circuit
to draft environmental impact Memorial, Designation of Crash Site 230-kV Transmission Line, Placer,
statements (EISs) was published in the to Commemorate the Passengers and Sacramento and Sutter Counties, CA,
Federal Register dated April 6, 2007 (72 Crew of Flight 93, Implementation, Comment Period Ends: 08/27/2007,
FR 17156). Stonycreek Township, Somerset Contact: Catherine Cunningham 720–
County, PA. 962–7000.
Draft EISs EIS No. 20070285, Draft EIS, COE, CA,
Summary: EPA does not object to the
EIS No. 20070176, ERP No. D–AFS– proposed action. Berth 136–147 [TraPac] Container
L65535–ID, Spruce Creek Project, Terminal Project, Upgrade Existing
Proposed Timber Harvest, Temporary Dated: July 10, 2007. Wharf Facilities, Install a Buffer Area
Road Construction, Thinning of Sub- Robert W. Hargrove, between the Terminal and
Merchantable Trees, Enhancement of Director, NEPA Compliance Division, Office Community, U.S. Army COE Section
Asper and Whitebark Pine, Cascade of Federal Activities. 10 and 404 Permit, West Basin
Ranger District, Boise National Forest, [FR Doc. E7–13659 Filed 7–12–07; 8:45 am] Portion of the Port of Los Angeles,
Valley County, ID. BILLING CODE 6560–50–P CA, Comment Period Ends: 08/27/
Summary: EPA commends the Forest 2007, Contact: Dr. Spence D. MacNeil
Service for meeting the non-point 805–585–2152.
source TMDL requirements in the ENVIRONMENTAL PROTECTION EIS No. 20070286, Draft EIS, BLM, WY,
project area. However, EPA has AGENCY Kemmerer Field Office Planning Area,
environmental concerns about potential Resource Management Plan,
[ER–FRL–6688–8]
impacts to Riparian Conservation Areas Implementation, Lincoln, Sweetwater
from timber management activities. Environmental Impacts Statements; and Uinta Counties, WY, Comment
Rating EC2. Notice of Availability Period Ends: 10/11/2007 Contact:
Michele Easley 307–828–4524.
EIS No. 20070188, ERP No. D–FHW– Responsible Agency: Office of Federal EIS No. 20070287, Final EIS, USA, MD,
C40170–NY, Fort Drum Connector Activities, General Information (202) Garrison Aberdeen Proving Ground,
Route Project, Proposed Link between 564–7167 or http://www.epa.gov/ Base Realignment and Closure
I–81 and U.S. Route 11 at the Fort compliance/nepa/. Actions, Realignment of Assets and
Drum North Gate, Town of Le Ray and Weekly receipt of Environmental Impact Staff, Implementation, Harford and
Pamelia, Jefferson County, NY. Statements Baltimore Counties, MD, Wait Period
Summary: EPA expressed Filed 07/02/2007 through 07/06/2007 Ends: 08/13/2007, Contact: Bob Ross
environmental concern about wetland Pursuant to 40 CFR 1506.9. 703–602–2878.
impacts, and requested additional EIS No. 20070281, Draft EIS, AFS, WV, EIS No. 20070288, Second Draft
information about mitigation measures. Lower Williams Project Area (LWPA), Supplement, NOA, 00, Bottomfish
Rating EC2. Proposed to Perform Vegetation and Seamount Groundfish Fisheries
Management and Wildlife Habitat of the Western Pacific Region,
Final EISs Improvements, Implementation, Amendment 14 to the fishery
EIS No. 20070214, ERP No. F–FRC– Gauley Ranger District, Monongahela Management Plan, Additional
G02015–00, EastTexas to Mississippi National Forest, Webster County, WV, Information to Analyze a Range of
Expansion Project, Construction and Comment Period Ends: 08/27/2007, Management Alternatives to End
Operation of 243.3 miles Natural Gas Contact: O’Dell Tucker 304–799–4334 Bottomfish Overfishing in the
Pipeline to Transport Natural Gas Ext 19. Hawaiian Archipelago, HI, GU and
from Production Fields in eastern EIS No. 20070282, Draft EIS, AFS, 00, AS, Comment Period Ends: 08/27/
Texas to Markets in the Gulf Coast, Sierra Nevada Forests Management 2007, Contact: William L. Robinson
Midwestern, Northeastern and Indicator Species Amendment (MIS), 808–973–2941.
Southeastern United States. Proposes to Adopt a Common List of EIS No. 20070289, Draft EIS, SFW, AZ,
Summary: No formal comment letter Management Indicator Species (MIS), Horseshoe and Bartlett Reservoirs
was sent to the preparing agency. and Amending Land & Resource Project, To Store and Release Water,
EIS No. 20070217, ERP No. F–CDB– Management Plans for Following Ten Issuance of an Incidental Take Permit
C80016–NY, EastRiver Waterfront Forests: Eldorado, Inyo, Lassen, for Operation, Located Northeast of
Esplanade and Piers Project, Modoc, Plumas, Sequoia, Sierra, Phoenix, Maricopa and Yavapai
Revitalization, Connecting Whitehall Stanislaus and Tahoe National Forests Counties, AZ, Comment Period Ends:
Ferry Terminal and Peter Minuit and Lake Tahoe Basin Management 09/18/2007, Contact: Debra Bills 602–
Plaza to East River Park, Funding, Unit, Several Counties, CA and 242–0210.
New York, NY. Douglas, Esmeralda, Mineral EIS No. 20070290, Final EIS, RUS, MO,
Counties, NV, Comment PeriodEnds: Norborne Baseload Power Plant,
Summary: EPA does not object to the
08/27/2007, Contact: Diana Craig 707– Proposed Construction and Operation
proposed project.
562–8737. of a 660-megawatt Net Coal-Fired
EIS No. 20070224, ERP No. F–BLM– EIS No. 20070283, Final EIS, AFS, OR, Power Plant, Carroll County, MO,
K65319–CA, Sierra Resource Five Buttes Project, Conduct Wait Period Ends: 08/13/2007,
Management Plan, Provide Direction Vegetation Management Activities, Contact: Stephanie Strength 202–720–
pwalker on PROD1PC71 with NOTICES

for Managing Public Lands, Several Implementation, Deschutes National 0468.


Counties, CA. Forest, Crescent Ranger District, EIS No. 20070291, Draft EIS, APH, 00,
Summary: EPA continues to express Deschutes County, OR, Wait Period PROGRAMMATIC—Introduction of
environmental concern about impacts to Ends: 08/13/2007, Contact: Marcy Genetically Engineered (GE)
water quality and aquatic habitat, and to Boehme 541–433–3200. Organisms, To Address Current and

VerDate Aug<31>2005 19:05 Jul 12, 2007 Jkt 211001 PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 E:\FR\FM\13JYN1.SGM 13JYN1

Das könnte Ihnen auch gefallen