Sie sind auf Seite 1von 2

ROHIT KUMAR SHARMA

Mob- 07877405870,09785436806
H.Phone- (05642)221492,9358505664
rohitsharma46@gmail.com,
rohitsharma_46@yahoo.co.in

Objective Grow professionally in telecommunication sector, proposing and implementing development


solutions for latest technology in an environment that encourage learning, self motivation, out of
box thinking and open to process new ideas with adequate responsibilities to implement the skills
being acquired, and ultimately growing with the growth of the company.

Experience Having 3.9 year experience in Telecommunication Sector.


Having 3.9 year of extensive working experience as an RF Engineer in Telecommunication sector

Current Working Organization:


Working as an RF Engineer in Krafters Telecom Services (P) Ltd. New Delhi form March
2011 to at present.

Previous Working Organization:


1. Worked as an RF Engineer in Toshniwal Enterprises Controls Pvt. Ltd. New Delhi. Since
June 2008 to 25 April 2010.

2. Worked as an RF Engineer in High Beam Technology Pvt. Ltd. New Delhi from April
2010 to Feb 2011.

Responsibilities during Optimizer


1.
2.
3.

Optimization of GSM Network


Analysis of various parameters such as RX Level, RX Quality, C/I, C/A, SQI & FER.
KPIs achieved = TCH drop < 2%, Signaling drop < 0.8 %, Handover success rate >
98 %, TCH block rate < 2%, SDCCH block rate < 1%.
4.
Pro active radio network optimization by monitoring KPI statistics e.g. SDCCH blocking,
SDCCH drop, TCH assignment, TCH blocking, TCH drop, HO success rate etc on day to
day basis and utilizing the resources to meet the standards.
5.
Suspecting Hardware faults & rectifications by analyzing alarm logs.
6.
Traffic Optimizations by parameters and physical changes.
7.
Optimizing RF Related Parameters such as Neighbor list, HSN, BCCH, BSIC, MAIO and
frequency retuning. Frequency/HSN changes to reduce interference, addition of missing
Neighbors & BSIC changes in order to enhance main routes performance.
8. Analyzing inconsistency of HOs for proper HOs in network and BSC logs.
9. Providing support to the drive test team and analyzing the drive test log files for optimum
coverage level and proper handovers in the network.
10.
Planning Various parameters related to site creation like Frequency,PCM Planning, NSEI,
Cell name, BCF name, MAIO, HSN,TRX SIGNALLING, Adjacency etc.
11.
Co-ordinate with Switch, BSC, and MSC & NOC teams to rectify Site Creation issues .
12. Proposing new sites on the basis of traffic conditions and coverage targets

Responsibilities during Drive Test


1.
2.
3.
4.
5.
6.
7.
8.
9.

Optimization of the network by changing Cell parameters, Orientation & tilting of GSM antennas
for optimum coverage.
Co-channel (C/I) and Adjacent channel (C/A) Interference analysis.
Analysis of Drive Test files for taking care of Interference in the Network, which involves analysis
of Rx quality, Rx Level etc, re-planning of RF parameters in problematic areas accordingly.
Checking proper Handovers (Intra-cell, Inter-cell).
Experience on working in GSM 900 & GSM 1800, 2100 bands.
Auditing of new sites and verifying the hardware, tilt, Antenna height and Orientation according
to the planning database.
Identify the coverage whole or problematic area.
Provide all RF details as Antenna Orientation, Height of the GSM antenna, and Type of antenna.
Handled all customer network problems and other networks related problems.

Projects
A. TOSHNIWAL CONTROLS PVT. LTD. KOLKATA
Project - Idea GSM Project (BANGLORE)
Duration - August 2008 to December 2009
Clint - Huwai

Project - Aircel GSM Project (CHENNAI)


Duration - January 2009 to June 2009
Clint Ericssion

Project - Aircel GSM Project, (MUMBAI)


Duration - July 2009 to September 2009
Clint ZTE

Project - TATA GSM Project, (Haryana)


Duration - October 2009 to December 2010
Clint NSN

Aircel GSM Project, (Uttarpradesh)


Duration - January 2010 February 2010
Clint ZTE

Project - Tata GSM Project, (Orissa)


Duration - February 2010 to April 2010
Clint ZTE

Projects
B. HIGH BEAM TECHNOLOGY PVT. LTD. NEW DELHI
Project-Tata GSM Project, (Bihar):
Duration -May 2010 to August 2010
Clint ZTE

Project - Loop mobile GSM Project, (Mumbai):


Duration -September 2010 to October 2010
Clint ZTE

Project-S Tel GSM Project (HIMACHAL PRADESH)


Duration - October 2010 to march 2011
Clint ZTE

Projects
C. KRAFTERS TELECOM SERVICES (P) LTD NEW DELHI
Project-Reliance 3G Project Patna Bihar (ZTE)
Duration - March 2011 to at present
Clint ZTE.

Proficiency

Technical concepts
Tools
Drive Test Tools
Survey Tools

:
:
:
:

Knowledge on GSM (2G, 3G).


MAPINFO 7.0, 8.5.MIPT 2G
TEMS Investigation 8.0.3,8.1.3, 9.1,10.0.3,10.0.5,
Map Source & Radio link tool.

Professional Qualification

B.Tech (Electronics & Communication) from NAGAJI INSTITUTE OF TECHNOLOGY AND


MANAGEMENT GWALIOR from RAJIV GANDHI TECHNICAL UNIVERSITY, BHOPAL with First
Division.

Major Project Micro-controller

A person can vote to any candidate in election by using telephone from any place with
personal id number through this concept. E.g. Reality shows.

Personal Details

Fathers Name
Date of Birth
Sex
Nationality
Address

Place: - New Delhi


Date: -

:
:
:
:
:

Shri Vidya Ram Sharma


31th December 1988
Male
Indian
H.No. 14/266, Gurudwara Road
Patiyala Bagh Dholpur Raj.
Pin- 328001
ROHIT KUMAR SHARMA

Das könnte Ihnen auch gefallen