PROPOSAL UNLOADING WITH CTU

FOR :

PT. PERTAMINA EP UBEP LIMAU

WELL : LBD-04
(2662.5 m - 2664 m)

REVISED: 0
07 Januari 2013

Prepared for :
Bpk. Sigit Sulistio W.

Prepared by :
Bunga P.
Ricky C.

PT. BUKITAPIT BUMI PERSADA


CEMENTING, STIMULATION, FRACTURING, COILED TUBING, DST AND NITROGEN SERVICES
CORPORATE OFFICE
Jl. Taman Margasatwa No. 45 Ragunan
Jakarta 12550
Tlp: 021- 78838142 / 78838057 Fax: 021-78837905

OPERATIONAL OFFICE
Jl. Palem Raya No. 9 Kel. Jatimekar Kec. Jatiasih
Bekasi 17422
Tlp: 021-84976121,84976105 Fax: 021-84976145

WORKSHOP PRABUMULIH BASE


Jl. Raya Nigata Lapangan Golf Pertamina Prabumulih Sumsel
31123
Tlp: 0713-322795 Fax: 0713 - 322109

Unloading Job with CTU


Well: LBD-04
FOR PT.PERTAMINA UBEP LIMAU

PT. BUKITAPIT BUMI PERSADA

1. WELL PROFILE
Note: This well diagram is originally copied from Company's Program.

N/A

Page 1 of 3

Unloading Job with CTU


Well: LBD-04
FOR PT.PERTAMINA UBEP LIMAU

PT. BUKITAPIT BUMI PERSADA

2.

CALCULATION

The purpose of this job is to pump Nitrogen (N2) to swab fluids by decreasing density (increasing differential pressure yet reducing hydrostatic
pressure) of fluid in wellbore, therefore fluid will easily to the surface.
REVISED: 0

2.1

CASING/TUBING DATA :
Description OD
inch
Prev. Liner
7
Exist. Liner
4 1/2
Tubing
2 7/8
Tubing
2 3/8
DP
Coil Tubing
1 1/4
Packer
7
Perforation
TOC
Total Depth

(mKB), well diagram not to scale

Weight
lb/ft
26.0
13.5
6.5
4

ID
inch
6.276
3.920
2.441
2.041

Depth, TVD (mKB)


From
To
1647.00
2600.00
2560.00
2699.00
0
2390.50
2390.50
2650.50

1.502

1.000

2700.00
2400.50
2664.00
2679.00
2700.00

2662.50

2.2
WELL HISTORY :
Avg. BHST
250
deg.F
Trajectory type
Avg. BHSP
4000
psi
Zone/Formation
Completion Fluid
1.10
Others:
LBD-04 (L5A-277) is a development well
Others:
Spud in 19 Sep 2012
2.3
NITROGEN FACTOR :
N2 Vol. Factor
976
Est. Loss
10000
Est. Cooling Down
25000
Kick Off
283603

scf/bbl
scf
scf
scf

Safe
Total
Prepare*

1097.5

m Shoe 13-3/8"

1647 m TOL 7"

Vertical
Sansdtone

578
318603
3422
4000

1847 m Shoe 9-5/8"

gall
scf
gall
gall

2391 m UR 2-7/8"
2401 m Packer 7"

*Note: Minimum order N2 liquid 2000 gall

2.4
VOLUME CALCULATION :
4 1/2 Casing Cap.
0.0838
2 7/8 Tubing Cap.
0.0325
2 3/8 Tubing Cap.
0.0227
0
DP Cap.
0.0000
1 1/4 Coil Tubing Cap. 0.0055
Total Volume

3.

2560 m TOL 4-1/2"


2600 m Shoe 7"

Cuft/ft
Cuft/ft
Cuft/ft
Cuft/ft
Cuft/ft
400%

Fluid in Csg
Fluid in Tbg
Fluid in Tbg
Fluid in Tbg
x
Excess

13.50
2390.50
260.00
0.00
2700.00
290.58

m Vol.
m Vol.
m Vol.
m Vol.
m Vol.
bbl

0.66
45.40
3.45
0.00
8.61
58.12

bbl
bbl
bbl
bbl
bbl
bbl

2651 m OE 2-3/8"

2662.5

- 2664.0
2679 m TOC
2699 m Shoe 4-1/2"
2700 m TD

JOB PROCEDURE
a
b
c
d

Do confirmation to Company Representative on loc about the "temporary production tank" if well flowing.
Ensure line "ablasan" already connected & Production Line is already set to the temporary production tank or the closest SP.
Ensure Production Equipment (Manifold, Separator, Test Tank, etc) are ready on loc if production test will be conducted.
Ensure Vacum Truck is ready on location if the SP is quite far from loction.

1 Spot Unit (CTU, N2 Pump, N2 Tank) on location.


2 Conduct Pre-job safety meeting with all crew involve for CTU job.
- Perform Re-Check area using gas Detector (if required).
- Risk assesment and job safety analysis.
3 R/U CTU and perform fuction test :
a. Perform CT BOP Test, close the blind ram, test equalizing port and test the blind ram to 3500 psi for 5 minutes. Bleed off pressure.
b. Spot the injector head and stab the CT. Make up BHA with Nozzle.
c. Pull tools into stuffing box and apply 5000 lbs. To check weight indicator and the tool connection.
d. RU CT injector onto the CT's BOP.
e. Run the CT onto the CT BOP's pipe ram.
f. Close the pipe ram of CT's BOP. Test the CT at maximum pressure of 3500 psi.
g. Test stripper. Close stripper, open pipe ram equalizing port, increase pressure if required to test the stripper pack off system.
h. Bleed off pressure from flow tee to zero. Calibrate the depth.
4 Once CT has been tested, equalize pressure across swab valve. Open well and begin run into well.
5 RIH CT slowly (40-80 ft/minute), always watch the weight indicator, and perform pull test every 500 ft.
6 Start pump N2 rate 300 scfm to check fluid level thru increasing circulating pressure significantly.
If found fluid level, cont pump N2 for Kick off fluid from string with N2 rate 400 - 500 scfm.
7 Record annulus CT until return continues from the well, standby CT at that depth.
If necessary, cont RIH to 2400.5 m (Packer) with N2 rate 300 - 500 scfm, ensure for the respond from formation (flowing/not).
8 POOH CT with continue pump N2 150 scfm to surface.
9 Rig Down CTU, Job Completed.

Page 2 of 3

Unloading Job with CTU


Well: LBD-04
FOR PT.PERTAMINA UBEP LIMAU

PT. BUKITAPIT BUMI PERSADA

4.

COST ESTIMATION

4.1
No.
1
2

Service Cost
REFF NO.

DESCRIPTION
Unloading Job with CTU

QTY
1

UNIT
Job

UNIT PRICE
$24,000

TOTAL PRICE
$24,000

Subtotal : $24,000
4.2
No.
1
2

Material Charge
REFF NO.
DESCRIPTION
N2 Liquid

QTY
4000

UNIT
Gall

UNIT PRICE
$3.50

TOTAL PRICE
$14,000.00

Subtotal : $14,000.00
4.3

Grand Total

$38,000.00

Note:
1
Price above excluding PPN 10%.
2
Price above will be adjsuted due the chemical requirements and subject to change depends on field condition.
3
Minimum order N2 liquid 2000 gall.

Page 3 of 3

Unit Bisnis Pertamina EP - Limau

JOB ORDER
No.0009

To:
PT. BUKITAPIT BUMI PERSADA
Ref. PSPU 3900195425

Field
Location
Well
Formation/Perforation
Coordinates
GL Elevation
CF Elevation
Total Depth
Plug Depth
Technical Data

:
:
:
:
:
:
:
:
:
:

Limau Barat
L5A - 277 / LBD - 04
2662.50 - 2664.00 mKB
Sst
399.161,21
X=
:
Y = 9.616.942,42
27.55 m
3250 mKB
2679 mKB
Item
Liner
Tubing

Job Order
Material Usage

:
:

Size (in)
4 1/2
2 7/8

Grade/Type/Pfp/Thd
11.6
ppf
6.5
ppf

Length (mKB)
2560 -2699
2651.00

Unloading with CTU


Nitrogen Liquid supplied by PT. BBP

Jakarta, 15 Januari 2013


Manager EPT UBEP Limau

M. Hidayat Abqory
Tembusan : Field Manager UBEP Limau