Beruflich Dokumente
Kultur Dokumente
WAT
valle
INSTI
and A
FLA
Des
TRIB
3D/4D
Design, calculate,
measure environmental
impacts, derive
hypotheses, control
budgets, implement,
plan, build, maintain
and dismantle: 3D and
4D development tools
unleash an ambitious
array of skills. setec
leverages these new
tools to fulfill its
strategic role at the
intersection of prime
contractors and project
owners.
PROJECT
MANAGEMENT
GLOBAL VISION,
SMART CITY
In an ever accelerating
world, setecs agility
and expertise enable
it to skillfully manage
major projects on
behalf of customers.
Parameters including
time management,
cost, risks, performance,
configuration and
interfaces are tracked
on a dashboard to
identify deviations,
anticipate challenges
and propose timely
corrective actions.
An expertise that
becomes even more
critical with transnational
project teams.
I
4
7
+
M
A
P
I
p
SYSTEM
INTEGRATION
valley of Ossau
LIFE CYCLE
A 360 perspective
to help anticipate and
manage the complex
range of evolving data
and documents
throughout the project
life cycle. setec takes
a long-term approach
to managing data
and the technical
environment, allowing
it to keep a continuous
focus on the project,
from study phase
through construction,
operations and
maintenance to
dismantlement.
MILLAU VIADUCT, which will become the world highest cable-stayed bridge
when commissioned in 2004. Architect Sir Norman Foster
THE A43 MAURIENNE TRANSALPINE HIGHWAY to the Frjus
1957-2014
more than half a century
of achievements
1957
1958
1959
1962
1965
Conducting
the engineering
studies for
the construction
of the TUNIS
INTERNATIONAL
AIRPORT.
1970
Performing the
engineering studies
for the access
BRIDGE TO THE
KOUROU SPACE
CENTER in French
Guiana, launch site
for French and
European rockets.
Launching a
comprehensive
study, unprecedented
at the time, of the
PARIS REGIONAL
TRANSPORTATION
SYSTEM.
Tun
ME
beg
Planning
IVORY COASTS
TRANSPORTATION
INFRASTRUCTURE.
1967
1970
1976
1980
1983
1985
Drilling of the
FRJUS TUNNEL
to link France
and Italy, which
will become the
worlds fifth longest
road tunnel.
Tunisias DJERBA
MELITA AIRPORT
begins operations.
Designing
and constructing
the IBM PLANT
AT CORBEILESSONNES,
Europes leading
site for transistor
manufacturing
heralds the new
industrial revolution.
1988
1993
Commissioning
the TUNIS LIGHT
RAIL Line 1.
Opening of
the worlds first
AUTOMATED
METRO IN LILLE,
France, with
specifications
designed by setec.
Beginning of the
A43 MAURIENNE
TRANS-ALPINE
HIGHWAY to
the Frjus tunnel,
linking France
and Italy.
Managing projects
to convert the
GRAND LOUVRE
PALACE into one
of the worlds
leading museums,
with 60,000 m2 of
exhibition space
in the heart of
Paris.
1994
1995
Opening of the
CHANNEL TUNNEL
to commercial traffic:
the construction
involves 5,000 people
on the French side,
8,000 in the UK. Since
1994, over 350 million
people have
travelled between
Britain and France via
the worlds longest
underwater tunnel.
Beginning
of the construction
of the RESUND
BRIDGE, extended
by an island and
tunnel to connect
Sweden and
Denmark. The E20
highway passes
over the upper part
of the two-level
bridge, with the
lower used by rail.
1996
Prop
an i
solu
the
circ
regu
dup
to re
alon
high
1996
on
D
ed
ct
20
art
l.
1998
Proposing
an innovative
solution to connect
the A86 HIGHWAY
circling Paris: a
regulated-access,
duplex tunnel able
to reroute traffic
along other
highway corridors.
1999
Opening in 2001,
the CUR DFENSE
TOWERS, at
Paris-La Dfense.
A computational
model is used to
perform static and
dynamic behavior
testing on the towers
at a wind tunnel in
Colorado. At the
time, it was Europes
largest real estate
project, with
220,000 m2 of offices.
2000
2001
Providing critical
technical expertise
on seismic
conditions during
ongoing work
on the BEIJING
OPERA.
Construction of a
model sustainable
plant for the research
and manufacture
of semiconductors
for STMICROELECTRONICS
IN CROLLES.
The cutting edge
R&D site includes
huge, maximumlevel clean rooms.
2002
Completing
in just three years
construction of the
Sir Norman Fosterdesigned MILLAU
VIADUCT, which will
become the world
highest cable-stayed
bridge when
commissioned
in 2004.
2004
Planning five of
the major sporting
venues used to
host the 2008
OLYMPIC GAMES
IN BEIJING.
Beginning of traffic
studies on
SENEGALS DAKARDIAMNIADIO
HIGHWAY. The work
will contribute to
making Dakar a pilot
city for urban mobility
within the SubSaharan Africa World
Banks Transport
Policy Program.
2005
2006
On October 6,
2005, EADS
announces the
initial program for
the A350,
continuing the now
20-year partnership
between Airbus
and setec.
Structural and
MEP design of
the TOUR PHARE
AT LA DFENSE,
designed by the
Morphosis agency
of American
architect and
Pritzker Prize
winner, Thom
Mayne. One of the
tallest buildings in
Western Europe,
the tower also
responds to
sustainability
criteria.
2006
Ber
asks
des
for t
LOU
in P
whi
rece
Nat
for
Ope
in O
e
n
2006
Bernard Arnault
asks Frank Gehry to
design the building
for the FONDATION
LOUIS VUITTON
in Paris. A work for
which setec will
receive the 2012
National Grand Prize
for Engineering.
Open to the public
in October 2014.
2007
2008
Beginning of studies
on the MAROC
TELECOM TOWER.
An engineering
challenge, the towers
top floors are
constructed using
large, cantilevered
structural steel beams
with 30-meter
overhangs.
2009
HALL K IN
TERMINAL E AT
PARIS-CHARLES DE
GAULLE AIRPORT.
Less than 30
months after the
start of design
studies, the last
element of the
new structure is
put in place.
setecs mission
included design
and supervision of
a work composed
of 2,800 tons
of tubular arches
for the terminals
canopy.
2010
2011
Performance
of geotechnical
studies for the
foundations of
the 120-MW
WIND
TURBINES
at Sub-Saharan
Africas largest
wind farm in
Ethiopia.
The enormous
third generation
NUCLEAR PLANT
AT FLAMANVILLE
involves a 200member setec
international team
from five countries
(Belgium, Egypt,
France, Morocco
and Tunisia) to
produce 7,500
execution plans
over a four-year
period.
2010: Managing
the conversion of
a new high-rise,
5-star HYATT
HOTEL IN SOCHI,
host of the 2014
Olympic Winter
Games.
2012
2013
Drilling of the
first tunnel of
the EASTERN
EUROPEAN TGV
HIGH-SPEED RAIL.
At 320 km / hour,
trains will require
just 45 seconds to
cross the Vosges
mountains.
2014
Construction of
the BRIDGE OVER
THE OUED
BOUREGREG
in Morocco, the
continents first
cable-stayed
bridge.
Architect : Strates,
for Autoroutes
du Maroc (ADM)
setec is part of
the worlds largest
public transportation
project: the design
and construction of
the future RIYADH
SUBWAY, with 60 km
underground, 81 km
on viaducts and
36 km above ground
track, serving
85 stations.
01
AN IDEA EMERGES
L S4
ing
y
le
ge
s.
ng
nce,
ed
DECISION MADE
02
design development
and construction
management.
03
OPERATION
& MAINTENANCE
Ensure that the solution delivers
the expected service.
Operational support during
project lifetime.
Ensure performance maintenance.
Define potential corrective actions.
Adapt project to respond to
operational realities and new
technology, regulatory and usage
developments.
04
REUSE, DISPOSAL
AND RECYCLING
Management of the projects
end of life, dismantlement,
recycling, conversion.
e
onal
www.setec.fr