30366 Federal Register / Vol. 72, No.

104 / Thursday, May 31, 2007 / Notices

Any person desiring to intervene or to its FERC Gas Tariff, Original Volume (866) 208–3676 (toll free). For TTY, call
protest this filing must file in No. 1, the following tariff sheets, to (202) 502–8659.
accordance with Rules 211 and 214 of become effective June 18, 2007:
Kimberly D. Bose,
the Commission’s Rules of Practice and Second Revised Sheet No. 0
Procedure (18 CFR 385.211 and Secretary.
Third Revised Sheet No. 37D [FR Doc. E7–10426 Filed 5–30–07; 8:45 am]
385.214). Protests will be considered by Third Revised Sheet No. 63
the Commission in determining the Second Revised Sheet No. 104
BILLING CODE 6717–01–P
appropriate action to be taken, but will Second Revised Sheet No. 113
not serve to make protestants parties to First Revised Sheet No. 117
the proceeding. Any person wishing to DEPARTMENT OF ENERGY
Second Revised Sheet No. 123
become a party must file a notice of Second Revised Sheet No. 130 Federal Energy Regulatory
intervention or motion to intervene, as Commission
appropriate. Such notices, motions, or Tuscarora states that these sheets are
protests must be filed on or before the being submitted to update contact [Docket No. EL07–63–000]
date as indicated below. Anyone filing information throughout the Tariff
an intervention or protest must serve a consistent with a recent change in Strategic Transmission, LLC,
copy of that document on the Applicant. ownership of the pipeline. Complainant v. PJM Interconnection,
Anyone filing an intervention or protest LLC, Respondent; Notice of Complaint
Tuscarora further states that a copy of Requesting Fast Track Processing
on or before the intervention or protest this filing has been served on
date need not serve motions to intervene Tuscarora’s jurisdictional customers and May 22, 2007.
or protests on persons other than the interested state regulatory agencies. Take notice that on May 21, 2007,
Applicant. Strategic Transmission, LLC (Strategic),
The Commission encourages Any person desiring to intervene or to
protest this filing must file in pursuant to sections 206 and 306 of the
electronic submission of protests and Federal Power Act, 16 U.S.C. §§ 824(e)
interventions in lieu of paper using the accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and and 825 (e), and sections 206 and 212
‘‘eFiling’’ link at http://www.ferc.gov. of the Commission’s Rules of Practice
Persons unable to file electronically Procedure (18 CFR 385.211 and
385.214). Protests will be considered by and Procedures, 18 CFR §§ 385.206 and
should submit an original and 14 copies 385.212, filed a complaint requesting
of the protest or intervention to the the Commission in determining the
appropriate action to be taken, but will fast track processing against PJM
Federal Energy Regulatory Commission, Interconnection, LLC (PJM) alleging
888 First Street, NE., Washington, DC not serve to make protestants parties to
the proceeding. Any person wishing to that, in contravention of PJM’s Open
20426. Access Transmission Tariff and the
This filing is accessible on-line at become a party must file a notice of
intervention or motion to intervene, as Federal Power Act, PJM has failed to
http://www.ferc.gov, using the identify on a timely basis the
‘‘eLibrary’’ link and is available for appropriate. Such notices, motions, or
protests must be filed in accordance Incremental Capacity Transfer Rights for
review in the Commission’s Public merchant transmission project S16
Reference Room in Washington, DC. with the provisions of Section 154.210
of the Commission’s regulations (18 CFR (advancement of the upgrade of the
There is an ‘‘eSubscription’’ link on the Gilbert-Glen Gardner 230 kv circuit).
Web site that enables subscribers to 154.210). Anyone filing an intervention
or protest must serve a copy of that Strategic certified that a copy of the
receive e-mail notification when a complaint has been served on PJM.
document is added to a subscribed document on the Applicant. Anyone
filing an intervention or protest on or Any person desiring to intervene or to
docket(s). For assistance with any FERC protest this filing must file in
Online service, please e-mail before the intervention or protest date
need not serve motions to intervene or accordance with Rules 211 and 214 of
FERCOnlineSupport@ferc.gov, or call the Commission’s Rules of Practice and
(866) 208–3676 (toll free). For TTY, call protests on persons other than the
Applicant. Procedure (18 CFR 385.211, 385.214).
(202) 502–8659. Protests will be considered by the
Comment Date: 5 p.m. Eastern Time The Commission encourages Commission in determining the
May 30, 2007. electronic submission of protests and appropriate action to be taken, but will
interventions in lieu of paper using the not serve to make protestants parties to
Kimberly D. Bose,
‘‘eFiling’’ link at http://www.ferc.gov. the proceeding. Any person wishing to
Secretary.
Persons unable to file electronically become a party must file a notice of
[FR Doc. E7–10430 Filed 5–30–07; 8:45 am] should submit an original and 14 copies intervention or motion to intervene, as
BILLING CODE 6717–01–P of the protest or intervention to the appropriate. The Respondent’s answer
Federal Energy Regulatory Commission, and all interventions, or protests must
888 First Street, NE., Washington, DC be filed on or before the comment date.
DEPARTMENT OF ENERGY 20426. The Respondent’s answer, motions to
Federal Energy Regulatory This filing is accessible on-line at intervene, and protests must be served
Commission http://www.ferc.gov, using the on the Complainants.
‘‘eLibrary’’ link and is available for The Commission encourages
[Docket No. RP07–455–000]
review in the Commission’s Public electronic submission of protests and
Tuscarora Gas Transmission Reference Room in Washington, DC. interventions in lieu of paper using the
Company; Notice of Propsoed There is an ‘‘eSubscription’’ link on the ‘‘eFiling’’ link at http://www.ferc.gov.
Web site that enables subscribers to Persons unable to file electronically
sroberts on PROD1PC70 with NOTICES

Changes in FERC Gas Tariff


receive e-mail notification when a should submit an original and 14 copies
May 23, 2007. document is added to a subscribed of the protest or intervention to the
Take notice that on May 18, 2007, docket(s). For assistance with any FERC Federal Energy Regulatory Commission,
Tuscarora Gas Transmission Company Online service, please e-mail 888 First Street, NE., Washington, DC
(Tuscarora) tendered for filing as part of FERCOnlineSupport@ferc.gov, or call 20426.

VerDate Aug<31>2005 16:01 May 30, 2007 Jkt 211001 PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 E:\FR\FM\31MYN1.SGM 31MYN1
Federal Register / Vol. 72, No. 104 / Thursday, May 31, 2007 / Notices 30367

This filing is accessible on-line at Date and time Location Connecticut by November 1, 2009
http://www.ferc.gov, using the (Phase 3).2
‘‘eLibrary’’ link and is available for Monday, June 18, Milford City Hall Audi- The Phase 1 pipeline looping would
review in the Commission’s Public 2007, 7 p.m. to 9 torium, 110 River include construction of 5.8 miles of 36-
p.m. (EST). Street, Milford, CT inch-diameter pipeline in Boonville,
Reference Room in Washington, DC.
06460, Telephone: New York; 1.0 miles of 36-inch-diameter
There is an ‘‘eSubscription’’ link on the (203) 783–3230.
Web site that enables subscribers to pipeline in Wright, New York; and 1.6
Tuesday, June 19, Brookfield High
receive e-mail notification when a miles of 36-inch-diameter pipeline in
2007, 7 p.m. to 9 School, 45 Long
p.m. (EST). Meadow Hill Road, Newtown, Connecticut. The new
document is added to a subscribed
Brookfield, CT pipeline looping segments would be
docket(s). For assistance with any FERC
06804, Telephone: located adjacent to Iroquois’ existing
Online service, please e-mail pipeline and connected to it at both
(203) 775–7704.
FERCOnlineSupport@ferc.gov, or call ends.
(866) 208–3676 (toll free). For TTY, call The planned project would expand
This notice is being sent to affected
(202) 502–8659. Iroquois existing system to deliver up to
landowners; Federal, State, and local
Comment Date: 5 p.m. Eastern Time government agencies; elected officials; 200,000 dekatherms per day of natural
on May 29, 2007. environmental and public interest gas transportation service to KeySpan
groups; Native American tribes; other Gas East Corporation at South
Kimberly D. Bose, Commack, Long Island. Iroquois plans
interested parties; and local libraries
Secretary.
and newspapers. We 1 encourage to file its certificate application in
[FR Doc. E7–10452 Filed 5–30–07; 8:45 am] government representatives to notify September 2007 and anticipates
BILLING CODE 6717–01–P their constituents of this planned receiving a Commission certificate by
project and encourage them to comment March 2008.
A general location of the proposed
on their areas of concern.
DEPARTMENT OF ENERGY project is provided in Appendix 1.3
If you are a landowner receiving this
notice, you may be contacted by an Land Requirements for Construction
Federal Energy Regulatory
Iroquois representative about the The Iroquois 08/09 Expansion Project
Commission
acquisition of an easement to construct, is in the preliminary planning stage.
operate, and maintain the proposed The precise facility design, pipeline
[Docket No. PF07–7–000] project facilities. The pipeline company route, rights-of-way, and other details
would seek to negotiate a mutually have not yet been finalized. The
Iroquois Gas Transmission System, acceptable agreement. However, if the proposed pipeline loops are being
L.P.; Notice of Intent To Prepare an project is approved by the FERC, that planned for routes adjacent to existing
Environmental Assessment; For the approval conveys with it the right of rights-of-way. Specific information on
Proposed Iroquois 08/09 Expansion eminent domain. Therefore, if easement the proposed project location and the
Project, Request for Comments on negotiations fail to produce an land used by it will be made available
Environmental Issues, and Notice of agreement, the pipeline company could to the public when it is finalized.
Public Scoping Meetings initiate condemnation proceedings in Construction of the proposed pipeline
accordance with state law. loop segments would require about
May 22, 2007.
A fact sheet prepared by the FERC 176.1 acres of land for construction.
The staff of the Federal Energy entitled ‘‘An Interstate Natural Gas Following construction, about 90.4 acres
Regulatory Commission (FERC or Facility on My Land? What Do I Need would be maintained for Iroquois’
Commission) will prepare an To Know?’’ is available for viewing on ongoing pipeline operation. The
environmental assessment (EA) that will the FERC Internet Web site (http:// remaining 85.7 acres of land would be
address the environmental impacts of www.ferc.gov). This fact sheet addresses restored and allowed to revert to its
the Iroquois 08/09 Expansion Project a number of typically asked questions, former use. Construction of the
proposed by Iroquois Gas Transmission including the use of eminent domain proposed Milford Compressor Station
System, L.P. (Iroquois). The and how to participate in the FERC’s would require use of about 4.8 acres of
Commission will use the EA in its proceedings. land, and operation of the station would
decision-making process to determine require maintaining 4.6 acres of the
Summary of the Proposed Project
whether or not to authorize the project.
2 The 7,700 horsepower Brookfield Compressor
This notice explains the scoping process Iroquois proposes to construct the Station was approved by the Commission on
the FERC staff will use to gather input Iroquois 08/09 Expansion Project in December 21, 2006, as part of Iroquois’
from the public and interested agencies three phases which would consist of: MarketAccess Project in Docket No. CP02–31–002.
on the project. Your input will help us Looping its existing pipeline system at Construction of the Brookfield Compressor Station
is scheduled to commence in the fall of 2007 and
determine the issues that need to be three locations in New York and operation of the station is scheduled to commence
evaluated in the EA. Please note that the Connecticut by November 1, 2008 in the fall of 2008.
scoping period will close on June 29, (Phase 1); constructing a new 3 The appendices referenced in this notice are not

2007. compressor station in Milford, being printed in the Federal Register. Copies of all
Connecticut with 20,620 horsepower of appendices, other than Appendix 1 (maps), are
Comments may be submitted in available on the Commission’s Web site at the
compression by January 1, 2009 (Phase ‘‘eLibrary’’ link or from the Commission’s Public
written or verbal form. Further details 2); and adding a 10,310 horsepower Reference Room, 888 First Street, NE., Washington,
on how to submit written comments are
sroberts on PROD1PC70 with NOTICES

compressor unit to Iroquois’ Brookfield DC 20426, or call (202) 502–8371. For instructions
provided in the Public Participation Compressor Station in Brookfield, on connecting to eLibrary refer to the Public
section of this notice. In lieu of sending Participation section of this notice. Copies of the
written comments, the FERC staff invite appendices were sent to all those receiving this
1 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the notice in the mail. Requests for detailed maps of the
you to attend the public scoping environmental staff of the FERC’s Office of Energy proposed facilities should be made directly to
meetings we have scheduled as follows: Projects. Iroquois.

VerDate Aug<31>2005 16:01 May 30, 2007 Jkt 211001 PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 E:\FR\FM\31MYN1.SGM 31MYN1