29152 Federal Register / Vol. 72, No.

100 / Thursday, May 24, 2007 / Notices

interventions or protests submitted on has prepared a Final Environmental DEPARTMENT OF ENERGY


or before the comment deadline need Impact Statement (final EIS) for the
not be served on persons other than the project. The existing project occupies Federal Energy Regulatory
Applicant. 1,620 acres of Federal lands managed by Commission
The Commission encourages the U.S. Department of Agriculture, [Project No. P–2088–068]
electronic submission of protests and Forest Service within the Plumas and
interventions in lieu of paper, using the Lassen National Forests and 4,620 acres South Feather Water and Power
FERC Online links at http:// managed by the U.S. Bureau of Land Agency; Notice of Intent To Prepare an
www.ferc.gov. To facilitate electronic Management. Environmental Impact Statement and
service, persons with Internet access Notice of Scoping Meetings and Site
who will eFile a document and/or be In the final EIS, staff evaluates the Visit and Soliciting Scoping Comments
listed as a contact for an intervenor applicant’s proposal and alternatives for
must create and validate an relicensing the Oroville Facilities. The May 17, 2007.
eRegistration account using the final EIS documents the views of Take notice that the following
eRegistration link. Select the eFiling governmental agencies, non- hydroelectric application has been filed
link to log on and submit the governmental organizations, affected with Commission and is available for
intervention or protests. Indian tribes, the public, the license public inspection:
Persons unable to file electronically applicant, and Commission staff. a. Type of Application: New Major
should submit an original and 14 copies License.
The final EIS will be part of the record b. Project No.: P–2088–068.
of the intervention or protest to the from which the Commission will make c. Date Filed: March 26, 2007.
Federal Energy Regulatory Commission, its decision. d. Applicant: South Feather Water
888 First St., NE., Washington, DC and Power Agency.
20426. Copies of the final EIS are available
e. Name of Project: South Feather
The filings in the above proceedings for review in the Commission’s Public
Power Project.
are accessible in the Commission’s Reference Branch, Room 2A, located at f. Location: On the South Fork Feather
eLibrary system by clicking on the 888 First Street, NE., Washington, DC River (SFFR), Lost Creek and Slate
appropriate link in the above list. They 20426. The final EIS also may be viewed Creek in Butte, Yuba and Plumas
are also available for review in the on the Internet at http://www.ferc.gov counties, California. The project affects
Commission’s Public Reference Room in under the eLibrary link. Enter the 1,977.12 acres of federal lands
Washington, DC. There is an docket number (P–2100) to access the administered by the Plumas National
eSubscription link on the Web site that document. For assistance, contact FERC Forest and 10.57 acres of federal land
enables subscribers to receive e-mail Online Support at administered by the U.S. Bureau of
notification when a document is added FERCOnlineSupport@ferc.gov or toll- Land Management.
to a subscribed dockets(s). For free at 1–866–208–3676, or for TTY, g. Filed Pursuant to: Federal Power
assistance with any FERC Online (202) 502–8659. Act 16 U.S.C. 791(a)–825(r).
service, please e-mail h. Applicant Contact: Michael Glaze,
FERCOnlineSupport@ferc.gov. or call CD versions of the draft EIS have been General Manager, South Feather Water
(866) 208–3676 (toll free). For TTY, call mailed to everyone on the mailing list and Power Agency, 2310 Oro-Quincy
(202) 502–8659. for the project. Copies of the CD, as well Highway, Oroville, CA, 95966, (530)
as a limited number of paper copies, are 533–4578.
Kimberly D. Bose, available from the Public Reference i. FERC Contact: John Mudre, (202)
Secretary. Room identified above. 502–8902, or john.mudre@ferc.gov.
[FR Doc. E7–9988 Filed 5–23–07; 8:45 am] You may also register online at http:// j. Deadline for filing scoping
BILLING CODE 6717–01–P
www.ferc.gov/docs-filing/ comments: July 16, 2007.
All documents (original and eight
esubscription.asp to be notified via e-
copies) should be filed with: Kimberly
DEPARTMENT OF ENERGY mail of new filings and issuances
D. Bose, Secretary, Federal Energy
related to this or other pending projects. Regulatory Commission, 888 First
Federal Energy Regulatory For assistance, contact FERC Online Street, NE., Washington, DC 20426.
Commission Support. The Commission’s Rules of Practice
[Project No. 2100–134] For further information, contact James and Procedure require all interveners
Fargo at (202) 502–6095 or at filing documents with the Commission
California Department of Water james.fargo@ferc.gov. to serve a copy of that document on
Resources; Notice of Availability of the each person on the official service list
Final Environmental Impact Statement Kimberly D. Bose, for the project. Further, if an intervener
for the Oroville Facilities Secretary. files comments or documents with the
[FR Doc. E7–9974 Filed 5–23–07; 8:45 am] Commission relating to the merits of an
May 18, 2007. issue that may affect the responsibilities
BILLING CODE 6717–01–P
In accordance with the National of a particular resource agency, they
Environmental Policy Act of 1969 and must also serve a copy of the document
the Federal Energy Regulatory on that resource agency.
Commission’s (Commission) Scoping comments may be filed
regulations, 18 CFR part 380 (Order No. electronically via the Internet in lieu of
486, 52 FR 47897), the Office of Energy paper. The Commission strongly
rmajette on PROD1PC67 with NOTICES

Projects has reviewed the application encourages electronic filings. See 18


for license for the Oroville Facilities CFR 385.2001(a)(1)(iii) and the
(FERC No. 2100), located on the Feather instructions on the Commission’s Web
River in the foothills of the Sierra site (http://www.ferc.gov) under the ‘‘e-
Nevada in Butte County, California, and Filing’’ link.

VerDate Aug<31>2005 15:52 May 23, 2007 Jkt 211001 PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 E:\FR\FM\24MYN1.SGM 24MYN1
Federal Register / Vol. 72, No. 100 / Thursday, May 24, 2007 / Notices 29153

k. This application is not ready for 649-foot-long spillway controlled by one pressurized tunnel controlled by one 6-
environmental analysis at this time. 16-foot-high by 54-foot-long steel radial foot-high by 12-foot-long electric hoist
l. The South Feather Power Project is gate that forms a 64,338 af storage slide gate that diverts up to 620 cfs of
a water supply/power project reservoir covering 619 acres at a water from Lost Creek Reservoir to the
constructed in the late 1950s/early maximum water surface (flood level) Woodleaf Penstock; (3) Woodleaf
1960s. The Project is composed of four elevation of 3,531 feet with the spill Penstock—a 3,519-foot-long, 97-inch
developments: Sly Creek, Woodleaf, gates closed; (7) Sly Creek Penstock—a reducing to 78-inch-inside-diameter,
Forbestown and Kelly Ridge, each of 1,100-foot-long, 90-inch-inside- exposed steel penstock that delivers
which is described below. The Project diameter, steel penstock enclosed in the water to Woodleaf Powerhouse; (4)
can store about 172,000 acre-feet (af) of former outlet tunnel that delivers water Woodleaf Powerhouse—a semi-outdoor,
water (gross storage) and has generated to Sly Creek Powerhouse; (8) Sly Creek reinforced concrete, above ground
an average of about 514.1 gigawatt hours Powerhouse—a semi-outdoor, powerhouse that releases water to the
(gWh) of power annually for the past 20 reinforced concrete, above ground Forbestown Diversion Dam
years, since the addition of Sly Creek powerhouse that releases water to Lost impoundment on the SFFR and that
Powerhouse. Creek Reservoir and that contains one contains one 6-jet vertical shaft impulse
The Sly Creek Development includes: reaction turbine rated at 17,690 Pelton turbine rated at 80,000 hp
(1) Little Grass Valley Dam—a 210-foot- horsepower (hp) directly connected to a directly connected to a 65,500 kVA
high, 840-foot-long, rock filled dam on 13,500-kilovolt-amperes (kVA) generator; and (5) Woodleaf Powerhouse
the SFFR with a crest elevation of 5,052 generator; (9) Sly Creek Powerhouse Switchyard—a switchyard adjacent to
feet (all elevations are in National Switchyard—a switchyard adjacent to the Woodleaf Powerhouse that contains
Geodetic Vertical Datum, or NGVD, the Sly Creek Powerhouse that contains one 70,000 kVA transformer. Power
unless otherwise specified) and with a one 16,000 kVA transformer. Power generated at Woodleaf Powerhouse is
180-foot-long spillway controlled by generated at Sly Creek Powerhouse is delivered from the switchyard to the
two 14-feet-high by 40-feet-long steel delivered from the switchyard to the grid via Pacific Gas and Electric
radial gates that forms a 89,804 acre-foot grid via Pacific Gas and Electric Company’s 115 kV Woodleaf-Kanaka
(af) storage reservoir covering 1,650 Company’s 115 kilovolt (kV) Sly Creek Junction transmission line. The
acres at a maximum water surface (flood Tap and Woodleaf-Kanaka Junction Woodleaf Development does not
level) elevation of 5,047 feet with the transmission line; (10) Little Grass include any recreation facilities or
spill gates closed; (2) South Fork Valley Reservoir Recreation Facility— roads.
Diversion Dam—a 60-foot-high, 167- the Little Grass Valley Reservoir
foot-long, concrete overflow arch dam The Forbestown Development
Recreation Facility includes Little includes: (1) Forbestown Diversion
on the SFFR with a crest elevation of Beaver, Red Feather, Running Deer,
3,557 to 3,559 feet and with four Dam—a 80-foot-high, 256-foot-long,
Horse Camp, Wyandotte, Peninsula concrete overflow arch dam on the
uncontrolled overflow spillway sections
Tent, Black Rock Tent, Black Rock RV, SFFR with a crest elevation of 1,783 feet
that forms an 87 af diversion
and Tooms RV campgrounds; Black and with five 46-foot-wide uncontrolled
impoundment covering about 9 acres at
Rock, Tooms and Maidu Boat Launch overflow spillway sections with a
a normal maximum water surface
areas; Pancake Beach and Blue Water combined width of approximately 240
elevation of 3,557 feet; (3) South Fork
Beach day use areas, Maidu feet that forms a 352 af diversion
Diversion Tunnel—a 14,256-foot-long,
Amphitheater and Little Grass Valley impoundment covering about 12 acres
11-foot-diameter concrete lined and
Dam ADA Accessible Fishing trail at at a normal maximum water surface
unlined horseshoe un-pressurized
Little Grass Valley Reservoir; and (11) elevation of 1,783 feet; (2) Forbestown
tunnel controlled by two 6-foot-high by
4-foot-long electric hoist slide gates that Sly Creek Reservoir Recreation Power Tunnel—a 18,388-foot-long, 12.5-
diverts up to 600 cubic feet per second Facility—the Sly Creek Recreation foot by 11-foot-diameter, concrete lined
(cfs) of water from the South Fork Facility includes two campgrounds and unlined horseshoe pressurized
Diversion Dam to Sly Creek Reservoir; (Strawberry and Sly Creek), Strawberry tunnel that diverts up to 660 cfs of water
(4) Slate Creek Diversion Dam—a 62- Car-Top Boat Launch, Mooreville Boat from the Forbestown Diversion
foot-high, 223.5-foot-long, concrete Ramp and Mooreville Day Use Area on impoundment to the Forbestown
overflow arch dam on Slate Creek with Sly Creek Reservoir. The Sly Creek Penstock; (3) Forbestown Penstock—a
a crest elevation of 3,552 to 3,554 feet Development does not include any 1,487-foot-long, 97-inch reducing to 83-
and with three uncontrolled overflow roads except for the portions of the inch-inside-diameter exposed steel
spillway sections that forms a negligible roads within the FERC Project Boundary penstock that delivers water to
diversion impoundment due to that cross Little Grass Valley Dam Forbestown Powerhouse; (4) Forbestown
sediment accumulation; (5) Slate Creek (USFS Road 22N94) and Sly Creek Dam Powerhouse—a semi-outdoor reinforced
Diversion Tunnel—a 13,200-foot-long, (USFS Road 21N16). concrete above ground powerhouse that
11-foot-diameter, concrete lined and The Woodleaf Development includes: releases water to Ponderosa Reservoir
unlined horseshoe un-pressurized (1) Lost Creek Dam—a 122-foot-high, on the SFFR and that contains one
tunnel controlled by two 8-foot-high by 486-foot-long, concrete overflow arch vertical reaction Francis turbine rated at
6-foot-long manual slide gates that dam on the Lost Creek with a crest 54,500 hp directly connected to a 40,500
diverts up to a maximum flow capacity elevation of 3,279.05 feet and with a kVA generator; and (5) Forbestown
of 848 cfs of water (though water rights 251-foot-wide spillway controlled by 4- Powerhouse Switchyard—a switchyard
limit flows to 600 cfs and at times flows foot-high by 8-foot-long flashboards that adjacent to the Forbestown Powerhouse
are limited to 500 cfs due to high storage forms a 5,361 af storage reservoir that contains one 35,200 kVA
volume in the receiving reservoir) from covering 137 acres at a normal transformer. Power generated at
rmajette on PROD1PC67 with NOTICES

the Slate Creek Diversion Dam to Sly maximum water surface elevation of Forbestown Powerhouse is delivered
Creek Reservoir; (6) Sly Creek Dam—a 3,283 feet with the flashboards installed; from the switchyard to the grid via
289-foot-high, 1,200-foot-long, zoned (2) Woodleaf Power Tunnel—an 18,385- Pacific Gas and Electric Company’s 115
earth-filled dam on Lost Creek with a foot-long, 12-foot-diameter, concrete kV Woodleaf-Kanaka Junction
crest elevation of 3,536 feet and with a lined and unlined horseshoe transmission line. The Forbestown

VerDate Aug<31>2005 15:52 May 23, 2007 Jkt 211001 PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 E:\FR\FM\24MYN1.SGM 24MYN1
29154 Federal Register / Vol. 72, No. 100 / Thursday, May 24, 2007 / Notices

Development does not include any Power generated at the Kelly Ridge addressed in the EIS are being
recreation facilities or roads. Powerhouse is delivered from the distributed to the parties on the
The Kelly Ridge Development switchyard to the grid via Pacific Gas Commission’s mailing list under
includes: (1) Ponderosa Dam—a 160- and Electric Company’s 60 kV Kelly separate cover. Commission’s mailing
foot-high, 650-foot-long, earth-filled Ridge-Elgin Junction transmission line. list. Copies of the SD1 will be available
dam that releases water into the 3.6 The Kelly Ridge Development does not at the scoping meeting or may be
million af Lake Oroville (part of the include any recreation facilities or viewed on the Web at http://
California Department of Water roads. www.ferc.gov using the ‘‘eLibrary’’ link
Resources’ Feather River Project, FERC m. A copy of the application is
(see item m above).
Project No. 2100) with a crest elevation available for review at the Commission
of 985 feet and with a 352-foot-long in the Public Reference Room or may be Site Visit
spillway controlled by two 7 foot 7.5- viewed on the Commission’s Web site at
http://www.ferc.gov using the We also will conduct a two-day site
inch-high by 51 feet-long steel gates that
‘‘eLibrary’’ link. Enter the docket visit to the project facilities on Tuesday,
forms a 4,178 af storage reservoir
number excluding the last three digits in June 12, 2007, and Wednesday June 13,
covering 103 acres at a normal
the docket number field to access the 2007. On both days we will meet at the
maximum water surface elevation of 960
feet; (2) Ponderosa Diversion Tunnel—a document. For assistance, contact FERC South Feather Water and Power
516-foot-long, 10-foot by 9-foot-diameter Online Support at Agency’s Forbestown Office, 5494
FERCOnlineSupport@ferc.gov or toll- Forbestown Rd., Forbestown, CA at 7:30
concrete lined and unlined horseshoe
free at 1–866–208–3676, or for TTY, a.m. All participants are responsible for
unpressurized tunnel controlled by one
(202) 502–8659. A copy is also available their own transportation on the site
6-foot-high by 8-foot-long hydraulic gate
for inspection and reproduction at the visits and will need to provide their
that diverts up to 300 cfs of water from
address in item h above. own lunch.
Ponderosa Reservoir to Miners Ranch You may also register online at
Conduit; (3) Miners Ranch Conduit—a http://www.ferc.gov/docs-filing/ Objectives
32,254-foot-long, 10-foot-wide concrete esubscription.asp to be notified via e-
or gunite-lined canal and concrete or mail of new filings and issuances At the scoping meetings, the staff will:
bench flume that includes two siphon related to this or other pending projects. (1) Summarize the environmental issues
sections across the McCabe and Powell For assistance, contact FERC Online tentatively identified for analysis in the
creek sections of Lake Oroville and that Support. EIS; (2) solicit from the meeting
diverts water from the Ponderosa n. Scoping Process. participants all available information,
Diversion Tunnel to the Miners Ranch The Commission intends to prepare especially quantifiable data, on the
Tunnel; (4) Miners Ranch Tunnel—a an Environmental Impact Statement resources at issue; (3) encourage
23,946-foot-long, 10-foot by 9-foot- (EIS) on the project in accordance with statements from experts and the public
diameter, concrete lined horseshoe un- the National Environmental Policy Act. on issues that should be analyzed in the
pressurized tunnel that diverts up to The EIS will consider both site-specific EIS, including viewpoints in opposition
300 cfs of water from the Miners Ranch and cumulative environmental impacts to, or in support of, the staff’s
Conduit to Miners Ranch Reservoir; (5) and reasonable alternatives to the
Miners Ranch Dam—a 55-foot-high, preliminary views; (4) determine the
proposed action. resource issues to be addressed in the
1,650-foot-long, earth-filled off-stream
dam with a crest elevation of 895 feet Scoping Meetings EIS; and (5) identify those issues that
and with an 1,175-foot-long FERC staff will conduct one agency require a detailed analysis, as well as
uncontrolled spillway that forms a 896 scoping meeting and one public those issues that do not require a
af storage reservoir covering 48 acres at meeting. The agency scoping meeting detailed analysis.
a normal maximum water surface will focus on resource agency and non- Procedures
elevation of 890 feet; (6) Kelly Ridge governmental organization (NGO)
Power Tunnel—a 6,736-foot-long, 9-foot concerns, while the public scoping The meetings are recorded by a
by 8-foot-diameter, pressurized tunnel meeting is primarily for public input. stenographer and become part of the
controlled by one 4-foot-high by 8-foot- All interested individuals, formal record of the Commission
long fixed wheel gate that diverts up to organizations, and agencies are invited proceeding on the project.
260 cfs of water from Miners Ranch to attend one or both of the meetings,
Individuals, organizations, and
Reservoir to Kelly Ridge Penstock: (7) and to assist the staff in identifying the
scope of the environmental issues that agencies with environmental expertise
Kelly Ridge Penstock—a 6,064-foot-long
69-inch reducing to 57-inch-inside- should be analyzed in the EIS. The and concerns are encouraged to attend
diameter, exposed steel penstock that times and locations of these meetings the meeting and to assist the staff in
delivers water to Kelly Ridge are as follows: defining and clarifying the issues to be
Powerhouse; (8) Kelly Ridge addressed in the EIS.
Agency Scoping Meeting
Powerhouse—a semi-outdoor reinforced Kimberly D. Bose,
concrete above ground powerhouse that Date: June 14, 2007.
Time: 10 a.m. Secretary.
releases water to CDWR Feather River
Project’s Thermalito Diversion Pool Place: VFW Post #1747. [FR Doc. E7–10000 Filed 5–23–07; 8:45 am]
Address: 1901 Elgin St., Oroville, CA. BILLING CODE 6717–01–P
downstream of Oroville Dam and that
contains one vertical reaction Francis Public Scoping Meeting
turbine rated at 13,000 hp directly
rmajette on PROD1PC67 with NOTICES

Date: June 13, 2007.


connected to a 11,000 kVA generator; Time: 7 p.m.
and (9) Kelly Ridge Powerhouse Place: VFW Post #1747.
Switchyard—a switchyard adjacent to Address: 1901 Elgin St., Oroville, CA.
the Kelly Ridge Powerhouse that Copies of the Scoping Document
contains one 11,000 kVA transformer. (SD1) outlining the subject areas to be

VerDate Aug<31>2005 15:52 May 23, 2007 Jkt 211001 PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 E:\FR\FM\24MYN1.SGM 24MYN1